Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹1,981
Closing Date
16 Apr 2026, 10:30 amClosed
AE (Civil), STC BSF Kharkan Camp
STC BSF KHARKAN CAMP
Repair and maintenance of FEBD park at STC BSF Kharkan Camp
2026_BSF_904916_1
18/STC/BSF/PB/2025-26
Open Tender
Civil Works
Percentage
60 days
STC BSF Kharkan Camp
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1,981
8 Apr 2026
8 Apr 2026
17 Apr 2026
8 Apr 2026
16 Apr 2026
8 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 0.76 | cum | - | - |
| 2 | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth 1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.49 | cum | - | - |
| 3 | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth 1:5:10 (1 cement : 5 coarse sand (zone-Ill) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.08 | cum | - | - |
| 4 | 12 mm cement plaster of mix: 1:6(1 cement: 6 fine sand) | 164.91 | sqm | - | - |
| 5 | Finishing walls with Acrylic Smooth exterior paint of required shade: New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) | 190.73 | sqm | - | - |
| 6 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge. With cement mortar 1:4 (1 cement : 4 fine sand) | 5.32 | sqm | - | - |
| 7 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 164.91 | sqm | - | - |
| 8 | Less Rate correction factor 0.973 or 2.7% | 1 | each | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_951146.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .