Loading…
Loading…
3,056 results • Best match
CASSETTE AC (Q3)
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled No Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6367147 Dated : 20-06-2025 Bid Document 1/6 Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 14 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : SAO Office Of The Director General Of Audit(central), Ahmedabad, Gujarat - 380 009, NA, N/A, Comptroller and Auditor General (CAG) of India (Abhishek Panwar) Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Bid Number ( ) : GEM/2025/B/6179092 Dated : 01-05-2025 Bid Document 1/10 Time allowed for Technical Clarifications during technical evaluation 2 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience Yes Startup Exemption for Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Bid Number ( ) : GEM/2025/B/6144903 Dated : 26-04-2025 Bid Document 1/6 Time allowed for Technical Clarifications during technical evaluation 2 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MSE Purchase Preference MSE Purchase Preference No MII Purchase Preference MII Purchase Preference No 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience Yes | Complete Document required from seller Experience Criteria, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 4 Bid Number : GEM/2025/B/6887508 Dated : 14-11-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 15 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : SO (C&P) GAIL India Limited, State Bank of India, Alkapuri, Vadodara Account no.00000032777240215 (OD account) IFSC Code: SBIN0003321 MICR Code: 390002014 (P J Bharali)
LG Split Air Conditioner, Wall Mount Type 1 Ton 5 Star Brand: LG (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687703878480 dt.24/02/2024)
Voltas Split Air Conditioner, Wall Mount Type 1.5 Ton 5 Star Brand: Voltas (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687751030537 dt.01/05/2024)
LG Split Air Conditioner, Wall Mount Type 1.5 Ton 5 Star Brand: LG (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687759639943 dt.03/02/2024)
godrej Split Air Conditioner, Wall Mount Type 1.5 Ton 5 Star Brand: godrej (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687773195041 dt.03/03/2024)
LG Split Air Conditioner, Wall Mount Type 1.5 Ton 5 Star Brand: LG (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687796039750 dt.24/02/2024)
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Turnover Yes | Complete Startup Exemption for Turnover Yes | Complete Document required from seller Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes Bid Number : GEM/2025/B/6425889 Dated : 07-07-2025 Bid Document 1/9 RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 10000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : SMO District Training Team-Surat New Civil Hospital Campus, Opp. Regional Vaccine Store, Majuragate, Surat-395001 (Gujarat) (Natalwala Saeed Ahmed Bakhtiyar Ahmed) Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience and Turnover Yes Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2025/B/6232094 Dated : 15-05-2025 Bid Document 1/7 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank AXIS BANK LTD ePBG Percentage(%) (%) 5.00 Duration of ePBG required (Months) ( ) . 14 (a). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : EMRI GREEN HEALTH SERVICES 108 Emergency Management Centre Naroda- Kathwada Road, Naroda, Ahmedabad 382 330, Gujarat, India. EMRI GREEN HEALTH SERVICES 108 Emergency Management Centre Naroda-Kathwada Road, Naroda, Ahmedabad (Emri Green Health Services) MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Startup, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to their meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6723507 Dated : 25-09-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 3 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Air Conditioner (Ceiling Mount Type), as per IS: 1391 (part 2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6410168 Dated : 03-07-2025 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Bid Details EMD Detail Advisory Bank PUNJAB NATIONAL BANK EMD Amount 13000 ePBG Detail Advisory Bank PUNJAB NATIONAL BANK (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 12 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : payable at Vadodara NOIDA, Department of Fertilizers, Projects and Development India Limited (PDIL), Ministry of Chemicals and Fertilizers (Projects And Development India Ltd) 2/9 Splitting
Custom Bid for Services - Providing Supplying Installing Testing and Commissioning of complete Air Conditioner Work HVAC and SPLIT AC
1.5 TON 3 STAR SPLIT AC, 1.5 TON 3 STAR WINDOW AC
1.5 Ton 3 Star Split AC, 1.5 Ton 3 Star Window AC
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Turnover Yes | Complete Startup Exemption for Turnover Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2 Bid Number : GEM/2025/B/6981425 Dated : 10-12-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 14 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : DIRECTOR Ahmedabad, Health & Family Welfare Department Gujarat, INSTITUTE OF KIDNEY DISEASES AND RESEARCH CENTRE, (Ikdrc) 2/8
Procurement of SUPPLY, INSTALLATION n COMMISSIOING OF 24 NOS. OF AIR CONDITIONER (2.5 TR HIGH WALL MOUNTED SPLIT AC 02 NOS., 3.0 TR HIGH WALL MOUNTED SPLIT AC 21 NOS. n 11.0 TR DUCTABLEE TYPE SPLIT AC 01 NO.)
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6633821 Dated : 10-09-2025 Bid Document 1/16, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 26928000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 807840 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 122 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : 2/16 Accounts Officer Directorate of Employment & Training, Block-1, 3rd Floor, Dr. Jivraj Maheta Bhavan, Gandhinagar, Gujarat. 382010 (Accounts Officer) Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6780565 Dated : 11-10-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 15000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/7 Beneficiary : TALUKA DEVELOPMENT OFFICER TANKARA MORBI, Panchayats and Rural Housing Department Gujarat, N/A, (Parasara Ismailbhai Alibhai)
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6770470 Dated : 09-10-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank HDFC Bank EMD Amount 16440 ePBG Detail Advisory Bank HDFC Bank (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 14 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. 2/8 (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Comptroller Kamdhenu University Gandhinagar, Agriculture and Co-operation Department Gujarat, Kamdhenu University, (Kamdhenu University Fund Account) UIN Number NCTGC2415P
Annual Maintenance service-AIR CONDITIONER, ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system
Annual Maintenance service-AIR CONDITIONER, ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system
Annual Maintenance service-AIR CONDITIONER, ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system
Annual Maintenance service-AIR CONDITIONER, ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system
Comprehensive Maintenance of VRV/VRF type airconditioning systems and split type Air conditioners installed at ICMR-NIOH, Meghaninagar, Ahmedabad. SH: Providing Split AC.
Providing Internal EI, Split AC and Audio Video system at 3rd Floor, Time Scale Lab, RRSL, Vatva, Ahmedabad. SH:- Providing Internal EI and Fans and SITC of 2 Ton Split AC Units.
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6978600 Dated : 11-12-2025 Bid Document 1/24, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority CONCERNED ONGC QUALITY ASSURANCE DEPARTMENT Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause Yes ( Mediation clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 21000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 20 2/24 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Chief General Manager B 19, Dak Section, MM Department, Western Sector Colony, Behind Ongc Dispensery, Ongc Chandkheda, Ahmedabad, Gujarat, 380005 (Head Procurement Officer)
Upgradation / Renovation of existing ACs with 5 star unverter split AC units at 1st floor , CBI office building, Sector-10A Gandhinagar.
ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system, Annual Maintenance service-AIR CONDITIONER
ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system, Annual Maintenance service-AIR CONDITIONER
ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system, Annual Maintenance service-AIR CONDITIONER
ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system, Annual Maintenance service-AIR CONDITIONER
ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system, Annual Maintenance service-AIR CONDITIONER
ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system, Annual Maintenance service-AIR CONDITIONER
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6804090 Dated : 31-10-2025 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority CONCERNED ONGC QUALITY ASSURANCE DEPARTMENT Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause Yes ( Mediation clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 45900 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 7 2/9 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Oil And Natural Gas Corporation Limited Mehsana Asset, NA, Oil and Natural Gas Corporation Limited, Ministry of Petroleum and Natural Gas (Finance And Accounts Officer, Ongc)
Wybor 5 Star Wall Mount Type Split Air Conditioner of Capacity Between 1.3 Ton - 1.7 Ton Brand: Wybor (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687720707943 dt
Air Conditioner Average Turn Over of Last 3 Years 6 Lakh (s) Experience with Gov. Required 3 Year (s) Air Conditioner ( 5 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/GENERIC Type of Air conditioner High ... wall Split AC Window AC , ... wall Split AC , ... Mounted Split AC (Cassette ... ( Cassette AC ), ... Standing Split AC Technology ...
SITC of ductable ac under
Supply installation and commissioning of Split Air conditioner of 1.5 Ton Capacity energy efficient BEE 5 Star rating wall mounted inverter type suitable operate on 230V 50 Hz Single Phase AC supply c
Custom Bid for Services - Dismantling and reinstallation of split casette and tower type airconditioners at CA Rajkot Similar Category ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system Comprehensive Annual Maintenance Services for ... Precision Air Conditioners Hiring ... of Air Conditioners and ... of Air Conditioners and ... And Air Conditioning System)
Repair and replacement of Package AC, Split AC, Window AC and Water Cooler, Summer Appliances and other connected items at INS Valsura, Jamnagar
Customized AMC/CMC for Pre-owned Products - WINDOW AC-2 SPLIT AC-6 REFRIDGERATOR-6 WATERCOOLER 2; --; Annual Maintenance Contract (AMC); Quarterly; No
LG 5 Star Wall Mount Type Split Air Conditioner of Capacity Between 1.8 Ton - 2.2 Ton Brand: LG (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687725058270 dt.06/08
EI FOR TOWER AC
1.5 Ton Cassette AC with Ducting
Upgradation/Renovation of existing ACs with 5 star inverter split AC units at 1st floor, CPWD office building, Kendriya Nirman Sadan, Sector-10A, Gandhinagar.