Loading…
Loading…
2,525 results • Best match
Unitary Air Conditioner (Window AC) (V3) ISI Marked to IS 1391 (Part 1) (Q2)
Shifting the floor-mounted outdoor units of Split AC units to wall-mounted stands
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2), Automatic Line Voltage Correctors (Step Type) for Domestic Use - IS - 8448 (Q2), Metallic Mount Suitable for Air Conditioner (Accessories) (Q4) MSE Exemption for Years of Experience ... category Split Air Conditioner Including ...
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Annual Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7101427 Dated : 12-01-2026 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) ( PAC Only ) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Number : GEM/2025/B/6338594 Dated : 12-06-2025 Bid Document EMD Detail 1/6 Required No ePBG Detail Required No Splitting
Repair and Overhauling Service - Split Air Conditioner including Green AC; Voltas; Yes; Buyer Premises, Repair and Overhauling Service - Water Dispenser; Voltas; Yes; Buyer Premises, Repair and Overhauling Service - Potable water purification system Reverse Osmosis or UV based; kent; Yes; Buyer Premises
Split AC Two Ton, Installation of Split AC, Split AC one and half Ton, Window AC One Ton, Installation of Window AC BOQ Title SPLIT AC BOQ
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, ... category Split Air Conditioner Including ...
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, ... category Split Air Conditioner Including ...
Air Conditioner Air Conditioner ( 2 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/GENERIC Type of Air conditioner High wall Split AC Window AC, High wall Split AC, Ceiling Mounted Split AC (Cassette AC), ... Standing Split AC Technology ...
REPAIR COMPREHENSIVE MAINTENANCE OF VRV AC A and B GROUP CASSETTE AC PRECISION AIR CONDITIONER HI-WALL SPLIT AC UPS AND OTHER ALLIED WORKS AT IMAC STN NTS GURGAON UNDER AGE EM AF GURGAON OF GE AF GURGAON
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days Bid Number : GEM/2025/B/6937117 Dated : 27-11-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
MOEI AND FANS SUBSTATION DG SET AT OLD AND NEW CGO COMPLEX NH-IV FARIDABAD SH/ROUTINE MAINTENANCE OF AIR CONDITIONING UNITS AND PROVIDING NEW CONDITIONERS AT CGO COMPLEX
Air Conditioner, Extra Refrigerant Pipe for Air Conditioners(Accessories), Metallic Mount Suitable for Air Conditioner (Accessories), Installation and Commissioning of Air Conditioners at Extra cost(Excluding Accessories)
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Turnover Yes Startup Exemption for Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Bid Number ( ) : GEM/2024/B/5089419 Dated : 25-06-2024 Bid Document 1/6 EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6432843 Dated : 09-07-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Unitary Air Conditioner (Window AC) (V3) ISI Marked to IS 1391 (Part 1) (Q2) ( ( 3 3 ))
Unitary Air Conditioner (Window AC) (V3) ISI Marked to IS 1391 (Part 1) (Q2) (3 (3 ))
Unitary Air Conditioner (Window AC) (V3) ISI Marked to IS 1391 (Part 1) (Q2) ( ( 3 3 ))
Unitary Air Conditioner (Window AC) (V3) ISI Marked to IS 1391 (Part 1) (Q2) (3 (3 ))
Pdg. Repair and Rewiring for office building and One No. 1.5 ton 5 Star Split Air conditioner in Rest House building in NGM at Firozpur Zirkha
Providing Copper Pipe and Core Cutting in RCC Beam and Brick Wall for installation of 1.5TR Split Air Conditioner in Gymkhana Building, Sector 14 at Bhiwani.
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Experience Criteria, Bidder Turnover, ... category Split Air Conditioner Including ...
Operation & Comprehensive maintenance of 2 X 165 TR Central AC Plant installed at MP Hall of SAI, NRC, Sonepat. (SH: Servicing and repairing of Air-Conditioning units at various locations).
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6342354 Dated : 13-06-2025 Bid Document 1/7 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner (Floor Type), as per IS: 1391 (part 2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Number : GEM/2025/B/6274903 Dated : 04-06-2025 Bid Document EMD Detail 1/6 Advisory Bank State Bank of India EMD Amount 28800 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 18 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : DGM POWERGRID, RHQ(NR1) SCO Bay 5-10, near Haryana Pollution Control board Office, Sector 16A, Faridabad, Haryana 121002 (Ruchi Tiwari) Splitting
Const. of Rest house in Multi Art Culture Centre (MACC), Haryana Kala Parisar Bhawan, Kurukshetra (CM Announcement No. 25526 dated 13.04.2021) (Pdg. Split Air Conditioner System) (recall)
Servicing and Repairing of Window/ Split AC units in various Ex and BTS sites under BA Karnal
Servicing and Repairing of Window Split AC units in various Ex and BTS sites under BA Rewari.
Servicing and Repairing of Window Split AC units in various Ex and BTS sites under BA Faridabad
Servicing And Repairing of Window Split AC units in various Ex and BTS sites under BA Gurgaon
Operation and Comprehensive Maintenance of 2 X 165 TR Central AC Plant installed at MP Hall of SAI, NRC, Sonepat. (SH: Servicing and repairing of Air Conditioning units at various locations).
COPELAND SCROLL COMPRESSOR MODEL NO. ZRHV72 KTE-TX7-502 (VARIABLE SPEED) SUITABLE FOR ROOF MOUNTED PACKAGED UNIT (RMPU) TYPE AIR CONDITIONING UNITS FITTED ON VANDE BHARAT COACHES AS PER RDSO SPECIFICA
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6925862 Dated : 24-11-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Past Performance 10 % Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Bid Number : GEM/2025/B/6303847 Dated : 13-06-2025 Bid Document 1/7 Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Turnover Yes | Complete Startup Exemption for Turnover Yes | Complete Document required from seller Experience Criteria, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes Bid Number : GEM/2025/B/6412429 Dated : 03-07-2025 Bid Document 1/7 RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
"Comprehensive Maintenance Contract of ACs (Split AC & Window AC) and Water Coolers for the period of Two Years".
"Comprehensive Maintenance Contract of ACs (Split AC & Window AC) and Water Coolers for the period of Two Years".
godrej Split Air Conditioner Including Green AC 5201 = 7000 Brand: godrej (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687732483461 dt.09/11/2022)
MIDEA Split Air Conditioner Including Green AC 3501 = 5200 Brand: MIDEA (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687782950569 dt.21/12/2022)
Hitachi Split Air Conditioner Including Green AC 3501 = 5200 Brand: Hitachi (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687726783888 dt.15/10/2022)
Oneiric Split Air Conditioner Including Green AC 5201 = 7000 Brand: Oneiric (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687741906499 dt.15/11/2022)
Carrier Split Air Conditioner Including Green AC 3501 = 5200 Brand: Carrier (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687798524384 dt.07/12/2022)
Oneiric Split Air Conditioner Including Green AC 3501 = 5200 Brand: Oneiric (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687748329846 dt.24/01/2023)
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6821282 Dated : 24-10-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Operation & Comprehensive maintenance of 2 X 165 TR Central AC Plant at MP Hall of SAI NRC Sonepat. (SH: Servicing and repairing of Air Conditioning units at various locations in whole campus).
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6967729 Dated : 05-12-2025 Bid Document 1/6 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Window Air Conditioner including Green AC (Q2), automatic line voltage corrector or step type auto transformer (Q3), Split Air Conditioner including Green AC (Q2)
SITC of 4 x 3 TR ductable split AC units in NTR Switch room, at 1st floor, MTE Sector 15A Faridabad.