Loading…
Loading…
1,921 results • Best match
BLUE STAR 5 Star Wall Mount Type Split Air Conditioner of Capacity Between 1.3 Ton - 1.7 Ton
BLUE STAR 5 Star Wall Mount Type Split Air Conditioner of Capacity Between 1.3 Ton - 1.7 Ton
BLUE STAR 5 Star Wall Mount Type Split Air Conditioner of Capacity Between 1.3 Ton - 1.7 Ton
BLUE STAR 5 Star Wall Mount Type Split Air Conditioner of Capacity Between 1.3 Ton - 1.7 Ton
BLUE STAR 5 Star Wall Mount Type Split Air Conditioner of Capacity Between 1.3 Ton - 1.7 Ton
BLUE STAR 3 Star Wall Mount Type Split Air Conditioner of Capacity Between 1.3 Ton - 1.7 Ton
BLUE STAR 5 Star Wall Mount Type Split Air Conditioner of Capacity Between 1.3 Ton - 1.7 Ton
Dismantling, shifting and reinstallation of 10 nos. of Split Air conditioner at Amrapali OCP under A-C Area
Haier Split AC: 2TON, Good Looking Air Conditioner HSU-22TFW3C
Annual maintenance contract of repairing of 10 nos. Of 1.5ton split Air-conditioner of SWG-GVP Ph-II OCP.
Refrigerant Copper pipe of size 5/8 inch pipe suitable for split air conditioner, Make- Godrej& Boyce MFG. OR SIMILER.
Supply of Split Air-Conditioner of BEE 5-star rating, with rated standard cooling capacity of minimum 6100 Watt etc
Supply of 2 ton window AC, 1.5 ton split AC with air curtain.
Supply of 2 ton window AC, 1.5 ton split AC with air curtain.
Air Conditioner Air Conditioner ( 3 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/GENERIC Type of Air conditioner High wall Split AC Window AC, High wall Split AC, Ceiling Mounted Split AC (Cassette AC), ... Standing Split AC Technology ... LIst Split AC , ...
Unitary Air Conditioner (Window AC) (V2) as per IS 1391 (Part 1) (Q2)
Unitary Air Conditioner (Window AC) (V2) as per IS 1391 (Part 1) (Q2)
Repair/ maintenance of Split/Window AC units installed at different locations at GRD Project.
Custom Bid for Services - Comprehensive maintenance and servicing of 34 number window or split Air Conditioner 1 point 5 and 02 Ton make LG Voltas and 04 number of Drinking Water Cooler at SRU-IFICO Similar Category Comprehensive Annual Maintenance ... Precision Air Conditioners
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7070297 Dated : 05-01-2026 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) ( PAC Only ) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7141156 Dated : 22-01-2026 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7071808 Dated : 05-01-2026 Bid Document 1/6 Number of Auto Extension count 2 Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Air Conditioner (Ceiling Mount Type), as per IS: 1391 (part 2) (Q2), Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2), Split Air Conditioner (Floor Type), as per IS: 1391 (part 2) (Q2) MSE Exemption for Years Of Experience ... category Split Air Conditioner (Floor ...
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7134145 Dated : 21-01-2026 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7091270 Dated : 20-01-2026 Bid Document 1/8 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 10 Bid Number : GEM/2026/B/7071213 Dated : 12-01-2026 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Installation of 20 Amp AC Switch socket and power arrangement for installation of 30 Nos of split air conditioner under GM Unit Hazaribagh Area
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2), Washing Machine - Domestic Purpose (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller ... category Split Air Conditioner Including ...
Unitary Air Conditioner (Window AC) (V2) as per IS 1391 (Part 1) (Q2) ( ( 3 3 ))
Unitary Air Conditioner (Window AC) (V2) as per IS 1391 (Part 1) (Q2) ( ( 3 3 ))
Window Air Conditioner including Green AC (Q2), Split Air Conditioner including Green AC (Q2), Tower Air Conditioner including Green AC (Q2)
REPAIR OF CENTRAL AC OF 1 X 10 TON WINDOW AC SPLIT AC AT MH NAMKUM UNDER GE RANCHI
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6600464 Dated : 06-09-2025 Bid Document 1/7 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2), Unitary Air Conditioner (Window AC) (V2) as per IS 1391 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and ... category Split Air Conditioner Including ...
Unitary Air Conditioner (Window AC) (V3) ISI Marked to IS 1391 (Part 1) (Q2) ( ( 3 3 ))
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No RCM Applicable Yes Comprehensive Maintenance Charges Required Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6469514 Dated : 25-07-2025 Bid Document 1/9 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Financial Document Required Yes Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM ... category Split Air Conditioner Including ...
AMC for Refrigerator window ac split AC Deep Freezer 6 body deep Freezer and Centralized AC etc
Repairing of 01 no split AC and 02 nos window AC at EDP section of PB Area.
Split Air Conditioner (Floor Type), as per IS: 1391 (part 2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6700092 Dated : 24-09-2025 Bid Document 1/11 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Air Conditioner (Floor Type), as per IS: 1391 (part 2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6407513 Dated : 02-07-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Comprehensive Annual Maintenance Contract for the period of two years of Voltas make 4x7.5 TR Water Cooled Package Air Conditioning Units installed at CT Scan Unit of Central Hospital, Dhanbad.
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6339383 Dated : 13-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Job Contract for Operation Monitoring Preventive and Breakdown maintenance of various ACs water Coolers Water purifier units etc, ACMC 1.5 Tons Window Air Conditioner First Year, ACMC 1.5 Tons Window Air Conditioner Second Year, ACMC 1.5 Tons Split Air Conditioner ... Tons Split Air Conditioner Second ... Tons Split Air Conditioner First ... Tons Split Air Conditioner Second ... Type Split Air Conditioner First ... Type Split Air Conditioner Second ... Split Tower AC units , ... Window Air Conditioner , ... Type Air Conditioners of ... Window Air Conditioner , ... Type Air conditioners of ... TR Split AC , ... 2TR Split AC , ... Split Tower AC , ... bracket Split AC upto ...
Split Air Conditioner (Floor Type), as per IS: 1391 (part 2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6884377 Dated : 12-11-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 2 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Number ( ) : GEM/2025/B/5814540 Dated : 15-01-2025 Bid Document 1/7 EMD Detail Required No ePBG Detail Required No Reserved for Make In India products Reserved for Make In India products Yes MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) ( PAC Only ) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6564163 Dated : 23-08-2025 Bid Document 1/8 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 12 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : DGM TELANGANA, Department of Atomic Energy, ELECTRONICS Corporation OF INDIA Limited, PMO (Erukala Ramachandra) Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6417267 Dated : 15-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience Yes Startup Exemption for Years Of Experience Yes Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Number ( ) : GEM/2025/B/5810036 Dated : 12-01-2025 Bid Document EMD Detail 1/6 Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6313156 Dated : 06-07-2025 Bid Document 1/7 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting