Loading…
Loading…
6,148 results • Best match
Supply, Installation, testing and commissioning of 5 star, invertor Split Air conditioning Units of various capacity at RRM Office, Ratnagiri under Ratnagiri region of Konkan Railway.
ARMO of Specialized services for E & M installation at NIPHTR, Khetwadi, Mumbai. SH- Refilling of fire extinguishers, providing split type air-conditioning units and petty works.
Annual Maintenance and Repairs of Mortuary Cabinets, Central A/c plant and Ductable AC Units at C.S.M. Hospital Kalwa.
Replacement of rusted and unserviceable ductable AC units of A1 building and Ground floor of Amenity Building at Wadala
Annual Maintenance and Repairs of Mortuary Cabinets, Central A/c plant and Ductable AC Units at C.S.M. Hospital Kalwa.
Annual Maintenance and Repairs of Mortuary Cabinets, Central A/c plant and Ductable AC Units at C.S.M. Hospital Kalwa
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2), Unitary Air Conditioner (Window AC) (V2) as per IS 1391 (Part 1) (Q2), Split Air Conditioner (Floor Type), as per IS: 1391 (part 2) (Q2) MSE Exemption for Years of Experience and ... category Split Air Conditioner Including ...
Supply, installation, testing and commissioning of Inverter Split Air-conditioner Units at Bank’s Executive Director and Senior Officer Residences (‘F’ grade) in Mumbai
Supply, Installation, Testing and Commissioning of Split AC Units at RBI Byculla Office, Mumbai
Annual Maintance of Central AC System and split Ac Units at YCMH Hospital in Prabhag no.20.(Year 2019-20)
AICMC of Split AC units Water Coolers and Water Purifiers installed at various locatios Dr Babasaheb Ambedkar International Airport Nagpur
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 4 Bid Number : GEM/2026/B/7089243 Dated : 08-01-2026 Bid Document 1/6 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7130271 Dated : 20-01-2026 Bid Document 1/6 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
MOEI & Fans, RM of P/sets, Lifts, Air Conditioning Units and water cooler, DG Set, FF Equipments and FA System at RPQS Bldg., Sewri, Mumbai. Subwork/Packages: Fully Comprehensive maintenance of split/window type Air Conditioning and Water Cooler Units.
Split Air conditioner of capacity 2 Tr, inverter type (Variable speed0 , copper coil material as per IS 1391 (Latest ) Part 2 for Room Air conditioner ( other Specification and IS as per enclosed Ge
Air Conditioner, Extra Refrigerant Pipe for Air Conditioners(Accessories), Metallic Mount Suitable for Air Conditioner (Accessories), Extra Electrical Cable for Air Conditioners (Accessories), DRAIN PIPE FOR AIR CONDITIONERS (Accessories)
Air Conditioner, Extra Electrical Cable for Air Conditioners (Accessories), Metallic Mount Suitable for Air Conditioner (Accessories), DRAIN PIPE FOR AIR CONDITIONERS (Accessories), Extra Refrigerant Pipe for Air Conditioners(Accessories)
Estimate No. 1249/CND/2019 20 Providing Split Type Air Conditioning Units of 2 TR Capacity, for New Government Rural Hospital at Rajura, Taluka Rajura, District Chandrapur
Installation and Commissioning of Three Nos Tower AC units in Director Lobby Area ,CRC,ACTREC
Floor Standing Split Air Conditioner Brand: NA (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687757014428 dt.04/09/2023)
ARMO Electrical & Mechanical equipment at AIIPM & RC Hospital at Haji Ali, Mumbai. (SH- SITC of tower type split Air Conditioner system in workshop building.)
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience and Turnover Yes | Complete -- Minimum number of bids required to disable automatic ... category Split Air Conditioner Including ...
Hot and Cold Air Conditioners, Air Conditioner-IS 1391
Unitary Air Conditioner (Window AC) (V2) as per IS 1391 (Part 1) (Q2) ( PAC Only )
Unitary Air Conditioner (Window AC) (V2) as per IS 1391 (Part 1) (Q2) ( PAC Only )
REPAIR AND MAINTENANCE OF AIR CONDITIONING PLANT, WINDOW/SPLIT AIR CONDITIONERS AT ARDE UNDER GE(I) RnD PASHAN
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7133306 Dated : 21-01-2026 Bid Document 1/7 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 182531 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank ICICI (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 12 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Sr. Manager (Plant) IOCL Western Region Contract Cell, INDIAN OIL CORPORATION LIMITED, Marketing Division, Ministry of Petroleum and Natural Gas (Mahendra Pratap Singh)
Air Conditioner Experience with Gov. Required 4 Year (s) Air Conditioner ( 8 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/GENERIC Type of Air conditioner High wall Split AC Window AC, High wall Split AC, ... Mounted Split AC (Cassette ... ( Cassette AC ), ... Standing Split AC Technology ...
Work of replacement of split AC units and refrigerators across various departments of Kasturba Hospital.
Split AC, Tower AC BOQ Title BOQ BID
Est,No.OW PES PESD 539/2022-23, Prov, Internal, Electrical Installation Campus Lighting Air Conditioning Units Water Pumps for New Krutim Retan Center Building at Vasai Dist Palghar
Comprehensive Maintenance of Air conditioning Units in Network Centre Under National Knowledge Network i.e. NKN at NIC-A Block, CGO Complex, Seminary Hills, Nagpur during year 2022-23
1)Copper pipe size 1/4 as per specification attached. 2)Copper pipe 4/8" (Half) for Split Air Conditioner Make: Mexflow, Totaline (by Carrier), Godrej, Mandev, Rajco or Similer as per specification attached. 3)Copper pipe 5/8" for Split Air Conditioner ... for Split Air Conditioner Make: ... for Air conditioner
Est No. SR/MH/RB-286/6538/2023-24 Providing Split AC Units in Newly Renovated GB Torana at Malbar Hill, Mumbai.
Customized AMC/CMC for Pre-owned Products - Window AC Split AC Cassette Split AC Ductable Split AC Tower Split AC Water Purifiers Water Coolers Water Dispensers Refrigerators and Kitchen Ventilation System; Indcool Oneric Voltas Carrier LG Llyod Int..
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6523833 Dated : 01-08-2025 Bid Document 1/7 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Annual Maintenance and Repairs of Mortuary Cabinets, Central A/c plant and Ductable AC Units at C.S.M. Hospital Kalwa.(2021-22)
Replacement of rusted and unserviceable ductable AC units of 6th and 7th floor of MMRDA old office building at BKC Bandra
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7054642 Dated : 07-01-2026 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 846097 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank ICICI EMD Amount 17000 ePBG Detail Advisory Bank ICICI (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 4 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. 2/8 (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : General Manager MM WCL NAGPUR MAHARASHTRA, COAL INDIA LIMITED, WESTERN COALFIELDS LIMITED, Ministry of Coal (Gm Mm)
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7154979 Dated : 28-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 3238011 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 64760 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 16 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Sr.DFM/Mumbai 2/8 OFFICE OF DIVISIONAL RAILWAY MANAGER MUMBAI, CENTRAL RAILWAY MUMBAI-400001 (Anshu S Desai)
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2), Split Air Conditioner (Floor Type), as per IS: 1391 (part 2) (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete ... category Split Air Conditioner Including ...
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2), Unitary Air Conditioner (Window AC) (V2) as per IS 1391 (Part 1) (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete ... category Split Air Conditioner Including ...
Unitary Air Conditioner (Window AC) (V3) ISI Marked to IS 1391 (Part 1) (Q2) ( ( 3 3 ))
MOEI and Fans, R/M of P/Sets, Lifts, Air Conditioning Units and Water Cooler, DG Sets, FF Equipments and FA System at RPQS Bldg., Sewri, Mumbai. SH: Routine ARMO works. Subwork/Packages: MOEI & Fans, R/M of P/Sets, Lifts, Air Conditioning Units and Water Cooler, DG Set, FF Equipments and FA System at RPQS Bldg., Sewri, Mumbai. SH: Routine ARMO works.
the work of repairs to split ac units at various hospitals and offices of eastern suburb.
Supply, Installation, Testing and Commissioning of VRF and Split AC units of various capacity for MSRLM.
Sant Tukaram Natyagruh- Air Conditioning Works (2nd Call)
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6810172 Dated : 27-10-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 49000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Estimate No. 122079.of 2020.2021 Providing Air conditioning units in ICU ward no 30 and Covid 19 test rooms at Govt Sub district hospital Manchar Tal Ambegaon Dist Pune
Estimate No. 212226 of 2020.2021 Providing annual comprehensive maintenance to Split Air conditioning units on 4th 5th and 7th floor at G plus 11 Sassoon General Hospital Building Pune