Loading…
Loading…
6,150 results • Best match
Custom Bid for Services - AMC FOR DOMESTIC AIR CONDITIONING UNITS SITUATED IN OFBHANDARA ESTATE OUTSIDE THE FACTORY AS PER LIST AND SPECIFICATIONS QTY 1 Wj, Custom Bid for Services - AMC FOR ALL AIR CONDITIONING SITUATED IN OFBHANDARA INSIDE THE FACTORY AS PER LIST AND SPECIFICATIONS ATTACHED QTY 1 Wj
REPAIR/ MAINTENANCE OF AIR CONDITIONING PLANT, WINDOW/SPLIT AC AT HEMRL SUTARWADI UNDER GE(I) RnD PASHAN
Air Conditioner-IS 1391, Hot and Cold Air Conditioners
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate ... category Split Air Conditioner Including ...
Repair and Overhauling Service - AHU unit window ac Split AC and cooling tower; Voltas; Yes; Buyer Premises
Replacement of rusted and unserviceable ductable AC units of 2nd 4th and 5th floor of MMRDA old office building at BKC Bandra
AICMC of Split AC units Water Coolers and Water Purifiers installed at various locations Dr Babasaheb Ambedkar International Airport Nagpur
Comprehensive Maintenance Contract (CMC) of Ductable, Split, Window Air conditioning units, water Coolers and water Purifiers at New Airport Colony, Mumbai for 2 years (2020-22)
Inverter Cassette AC Tr, Copper piping, Drain Pipe, Control Cable, Out Door Stand, Core Cutting
Supply, Installation, Testing and Commissioning of cassette type Split air conditioning units in the Bank’s office building at Bandra Kurla Complex, Bandra, Mumbai (Date of NIT available: August 14, 2024)
Annual Maintenance and repairs of Split AC, Package Unit Ductable AC, Cassete AC, Water Cooler and water Purifier of Dadoji Kondadev Stadium
AICMC of Split AC units Water Coolers and Water Purifiers installed at various locatios
CMC of Window AC Split Air conditioners and Ductable Split AC water cooler units and other misc works at ARSR RADAR Juhu Airport O M Vashi R R Station Dahisar and TS at Andheri Shobha Singh Hanger Mumbai during 2018 19
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Bid Number : GEM/2025/B/6310094 Dated : 19-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6312303 Dated : 09-06-2025 Bid Document 1/7 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Rate contract for Maintenance of Window Split AC Units on Call basis under Amravati SSA RECALLED 2nd
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Experience Criteria, Certificate ... category Split Air Conditioner Including ...
Operation,Maintenance and Repair of VRV/HVAC/Split AC Air conditioning systems in YCM Hospital.(Year 2025-26)
Custom Bid for Services - SERVICING OF SPLIT AC Similar Category ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system
Repair / maint of central type AC Plant/Window AC/ Split AC, repair/ servicing of EOT Cranes, water coolers, desert coolers and allied works at CQA(V), DAD and MIRC under GE (S) Ahmednagar
Cassette AC
Split Air Conditioner (Floor Type), as per IS: 1391 (part 2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Bid Number ( ) : GEM/2025/B/6019480 Dated : 25-03-2025 Bid Document 1/7 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Repair and Overhauling Service - Hiring of Air Conditioners and Desert Coolers - Monthly Based - Air Conditioner; CUSTOM; No; Buyer Premises
Custom Bid for Services - HIRING OF AIR CONDITIONER Similar Category Hiring of Air Conditioners and Desert Coolers - Monthly Based
Annual Maintenance and repairs of window AC, Split AC, Water Cooler and water Purifier of Naupada Ward Committee
NOTICE INVITING TENDER FOR AMC FOR COMPREHENSIVE MAINTENANCE CONTRACT FOR WINDOW AC AND SPLIT AC AT RCF THAL.
Repair and Overhauling Service - Split Air Conditioner including Green AC; Hitachi; Yes; Buyer Premises, Repair and Overhauling Service - Two Wheeler - Motor Cycles and Scooters and Mopeds; HERO; Yes; Buyer Premises, Repair and Overhauling Service - Multifunction Machines MFM; Unbranded--K P L ENGINEERING; Yes; Buyer Premises, Repair and Overhauling Service - Multifunction Machines MFM; Unbranded--SHIV SHAKTI ENTERPRISES; Yes; Buyer Premises
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6323612 Dated : 03-07-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6417609 Dated : 05-07-2025 Bid Document 1/7 Past Performance 30 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6599062 Dated : 22-08-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 10 Bid Number : GEM/2025/B/6974685 Dated : 09-12-2025 Bid Document 1/7 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6427500 Dated : 10-07-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Ac Installation, Testing & Commissioning Labour Job Work up to 2.0 Tr capacity
REPAIR/ MAINTENANCE OF AIR CONDITIONING PLANT, WINDOW/SPLIT AIR CONDITIONERS AND OTHER MISC WORK AT ARDE UNDER GE(I) RnD PASHAN
Maintenance of elect. & mech. equipment in HPCS & NDC sections at Agrimet Bldg. IMD, Shivajinagar, Pune. SH: Comprehensive maintenace VRF/ Split/ Cassette AC units.
Customized AMC/CMC for Pre-owned Products - Annual CMC of Window/Split/Tower/Cassette AC Units, Water Dispensers, Water Coolers & RO Water Purifiers; Blue Star and other Brands; Comprehensive Maintenance Contract (CMC); Daily; Yes
Split Air Conditioner (Floor Type), as per IS: 1391 (part 2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/7003635 Dated : 02-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 15 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : DIRECTOR, DPS ACTING ON BEHALF OF PRESIDENT OF INDIA Directorate Of Purchase And Stores, Department of Atomic Energy, Anushaktinagar. Mumbai - 400094. (Dps/cpu/04/a/4884)
the work of repairs to ductable type split ac units and packaged ac units and thereafter csmc of these hvac systems at various locations of eastern suburb area
CSMC of VRF AC units at Sanyukta Maharashtra Smruti Dalan Dadar and CSMC of split AC units in city area for one year from the date of acceptance
Voltas Split Air Conditioner Including Green AC 3501 = 5200 Brand: Voltas (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687786344016 dt.11/02/2023)
Whirlpool Split Air Conditioner Including Green AC 3501 = 5200 Brand: Whirlpool (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687732384970 dt.31/01/2023)
godrej Split Air Conditioner Including Green AC 3501 = 5200 Brand: godrej (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687730117556 dt.01/03/2023)
Voltas Split Air Conditioner Including Green AC 5201 = 7000 Brand: Voltas (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687766509202 dt.13/02/2023)
godrej Split Air Conditioner Including Green AC 5201 = 7000 Brand: godrej (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687789536920 dt.21/02/2023)
Voltas Split Air Conditioner Including Green AC 5201 = 7000 Brand: Voltas (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687774250132 dt.25/01/2023)
godrej Split Air Conditioner Including Green AC 5201 = 7000 Brand: godrej (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687789990123 dt.14/03/2023)
Voltas Split Air Conditioner Including Green AC 5201 = 7000 Brand: Voltas (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687768270617 dt.11/02/2023)
godrej Split Air Conditioner Including Green AC 3501 = 5200 Brand: godrej (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687752137480 dt.17/02/2023)
godrej Split Air Conditioner Including Green AC 3501 = 5200 Brand: godrej (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687754124158 dt.07/12/2022)
Whirlpool Split Air Conditioner Including Green AC 3501 = 5200 Brand: Whirlpool (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687784425693 dt.02/12/2022)