Loading…
Loading…
8,371 results • Best match
Repair and Overhauling Service - Ductable Air Conditioner; AIR COMPRESSOR FOR CABA; Yes; Buyer Premises
Repair and Overhauling Service - Window Air Conditioner including Green AC; LLOYD; Yes; Buyer Premises
Repair and Overhauling Service - Multifunction Machines MFM; Repair of Air Conditioner; Yes; Buyer Premises
Custom Bid for Services - SERVICING OF AIR CONDITIONER Similar Category Repair and Overhauling Service
Supply of 02 Nos. Air Conditioner for the office of E.U.D.D.-Rajajipuram, LESA, Lucknow.
Repair and Overhauling Service - Window Air Conditioner including Green AC; Voltas; Yes; Buyer Premises
SUPPLY INSTALLATION,TESTING AND COMMISSIONING OF AIR CONDITIONER, AT-CUSTOMER CARE EXTENSION HUSSAINGANJ, LUCKNOW
Repair and Overhauling Service - Window Air Conditioner including Green AC; Voltas; Yes; Buyer Premises
Two 1.5 TR Window AC, 2.0 TR Window AC, Ten 1.5 TR Split AC, Split type 2.0 TR AC, 4.0 KVA AUTOMATIC STABILIZER, 5.0 KVA AUTOMATIC STABILIZER
Servicing/ Repairing and maintenance of Air conditioners installed at different location of Kakri project. (For detailed description of work please refer to scope of work section of NIT).
Work of Servicing and overhauling of air conditioning units installed at control room, Bay control units and Committee rooms of the 220 kV S/S RC Green, Dadri andETD-II, Noida
Replacement of split ACs with 1.8 TR inverter cassette AC at the chamber of DPS and conference room with allied electrical works at RO, Agra
Supply And Installation Of Split Type Air Conditioner 1.5 Ton 5 Star Rated, Supply And Fixing Of Split Type Air Conditioner 2 Ton 5 Star Rated, Supply And Fixing Of 5 KVA Automatic Voltage Stabilizer 150-270V, Supply And Fixing Of Outdoor Stand For ... Ton Split AC , ...
Operation and Comprehensive Annual maintenance contract for Air Conditioning systems installed in 210 MW along with its all AHUs Pumps Cooling towers and Air Conditioning systems installed in ESP 5and6 CW plant CMR system and DM Plant of 250 MW an
Supply and Installation of 2.00/4.00 Ton Capacity Tower AC in Noida Club, Sector-27, Noida
SITC of 2 x 2.0 TR Tower AC and associated work at WL 224 and 225
TOWER AC 3.0 TON WITH COPPER PIPE FITTING UNDERGROUND APPX 50FT AND INSTALLATION WITH ELECTRIC FITTI
SPL REPAIR REPLACEMENT TO SOLAR WATER HEATERS AND BER AIR CONDITIONERS ALONGWITH CERTAIN ALLIED WORKS UNDER AGE (I) AYODHYA CANTT
S/I/T/C of Fire Extinguisher and Air Conditioners Unit in Site Office Building at Techzone-4, Greater Noida
Renewal of Comprehensive Annual Maintenance Contract of the VRF Air Conditioners installed at CIT Building of the High Court, Allahabad
ACMC and Operation of 3x500TR HVAC Systems, Package, Room Air-conditioners, and Water Coolers at LBSI Airport Varanasi (2024-26)
Maintenance and Repair of Air Conditioners, Water Coolers, refrigerators at VTC, Coal Lab, CHP, Workshop Area and mines, Dudhichua Project
Renewal of Comprehensive Annual Maintenance Contract of the VRF Air Conditioners installed at CIT Building of the High Court, Allahabad
PROVIDING AND FITTING IF NEW AIR CONDITIONERS TURNKEY JOB SUITABLE FOR COOLING IN CABIN 11 NOS OF CAT 85T DUMPERS
ACMC and Operation of 3x500TR HVAC Systems, Package, Room Air-conditioners and Water Coolers at LBSI Airport Varanasi (2020-22)
Annual rate contract for Supply, Installation, Testing and Commissioning of split and window type air conditioners for Institute AC requirements
COMPREHENSIVE ANNUAL MAINTENANCE OF PRECISION AIR CONDITIONERS 66 TR OF DATA CENTER IN BATTERY ROOM AT SHAKTI BHAWAN EXTENSION LUCKNOW
Comprehensive Annual Maintenance of Precision Air Conditioners 66 TR of Data Center in Battery room at Shakti Bhawan Extension Lucknow
PROVISION OF BOLLARD LIGHTS AND 02 SPLIT AIR CONDITIONERS IN DGQA OFFICERS MESS UNDER GE I R AND D KANPUR
AGENCY FOR DESIGN, ENGINEERING, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF AIR-COOLED DUCTABLE SPLIT AIR-CONDITIONERS AT MATHURA REFINERY TOWNSHIP
ACMC and Operation of 3x500TR HVAC Systems, Package, Room Air-conditioners and Water Coolers at LBSI Airport Varanasi (2022-24)
Comprehensive annual maintenance contract of split tower cassette type air conditioners in and outside of academic area at IIT Kanpur
Annual maintenance contract for 3 nos. air conditioner fitted at Tata-Hitachi EX1900VI (EXC-2776) and 01 no. air conditioner fitted at Tata-Hitachi 650-I (EXC-3143) Hydraulic Shovels working at Bina Project
Annual maintenance contract for 3 nos. air conditioner fitted at Tata-Hitachi EX1900VI (EXC-2776) and 01 no. air conditioner fitted at Tata-Hitachi 650-I (EXC-3143) Hydraulic Shovels working at Bina Project.
Cooling and Heating two ton three star split air conditioner, Cooling and Heating one point five ton three star split conditioner, Five KVA stabilizer, Four KVA, Installation charge
Genrator 10 KVA ( 1 set ), Split Air Conditioner With Stabilizer ( 3 set ), Laser Printer ( 2 set ), Computer Chair, Computer Table, Office Chair, Delegate Mic Sound Set ( 20 set )
Repair and Overhauling Service - Air Conditioner-Is 1391 (DFM); LLOYD; Yes; Buyer Premises, Service Provider Premises
Repair and Overhauling Service - Air Conditioner-Is 1391 (DFM); LLOYD; Yes; Buyer Premises, Service Provider Premises
Comprehensive maintenance of 3x7TR Package AC units in NTR OFC Equipment room at Mall Road, Kanpur.
Annual Maintenance service-AIR CONDITIONER, ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) - Drinking Water Cooler; ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM; PACKAGE-5 : Water purifier and conditioning system maintenance..
Air Conditioner ( 86 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Allowed Values CAPACITY/GENERIC Type of Air conditioner High wall Split AC High wall Split AC Technology of AC Inverter (Variable Speed) Inverter (Variable Speed) Nominal cooling capacity in Ton (kcal/hr) 1.5 Ton/4500 kcal/hr 1.5 Ton/4500 kcal/hr Coil Material Copper Copper Eco-friendly refrigerant true true Minimum length of copper pipe and suitable connecting electrical cable for installation and commissioning 3 metre * Packing LIst REMOTE, CELL * Any other Features SLEEP TIMER, POWER COOLING * 1/3 CONFORMITY CERTIFICATION BEE Star Rating 5 5 Conformity to Indian Standard IS 1391 latest * WARRANTY Warranty on Machine 5 5.0 Warranty on Compressor 10 10.0 (or higher) INSTALLATION Installation and commissioning With Installation and Commissioning With Installation and Commissioning * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Manas Kumar Jha 226016, Indira Nagar, Faizabad Road 86 45
Repairing , Servicing, maintenance of Electrical installation,Sub station,Generator,Air conditioner compound light and comprehensive maintenance of Air conditioner and Generator including Operation of EA Set at O/O the CPMG and attached building
AC REPAIR AND GAS REFILLING SERVICES
SITC of Hi wall Split AC 1.5 Tr 5 star, SITC of Hi wall Split AC 2.0 Tr 5 star, SITC of Cassette AC 2.0 Tr 5 star, Outdoor Stand, Stabiliser 5 KVA
Annual Maintenance service-AIR CONDITIONER, ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) - Drinking Water Cooler; upto 3; PACKAGE-4 : Water purifier and conditioning system maintenance involving basic servicing, filters, membranes, All electrical parts..
SITC of Air Conditioner in the Offices at GPOA Building, DD Puram, Bareilly. Subwork/Packages: Electrical Works
SITC of Window AC Split AC and Minor electrical wiring at Main and CRK campus CSIR IITR Lucknow
Attending preventive and breakdown maintenance works of various Air Conditioning systems installed in CHP-2X500 MW, BTPS, Anpara
Air Conditioning Work (VRV / VRF Voltas, Blue Star, Daikin, L G Make) at Food and Drug Lab Azamgarh