Loading…
Loading…
2,722 results • Best match
Providing and laying built-up spray grout, bituminous concrete in Km. 42/0 to 43/0
Providing and laying wearing grade-II for profile correction, built-up spray grout and bituminous concrete in Km. 1/0 to 2/0).
Providing and Laying bituminous concrete 30mm thick in Km 0/00 to 2/00, 0/00 to 3/00 0/00 to 1/710 respectively with paver finisher
P/L 30mm thick bituminous concrete in Km. 1/00 to 3/00).
SH P/L 30mm thick bituminous concrete in Km. 35/00 to 37/00).
Repair of pot holes and providing 10cm wide road marking and 30 mm thick bituminous concrete in km 9/00 to 10/00,11/00 to 15/170 ).
Providing and laying built-up spray grout, bituminous concrete in Km.39/0 to 40/0
Providing and Laying BUSG for correction layer, Bituminous concrete in Km 6-0 to 8-0 Providing and laying hot applied thermoplastic edge line and construction of PCC hill side drain
Providing and Laying renewal coat by providing 30mm thick Bituminous Concrete in Km.43/00 to 45/00 and 52/00 to 54/00
Providing and laying 25mm thick Mix Seal Surfacing Type A at RD. 3/0 to 4/0 and 4/0 to 5/0 ,2.000 km
Providing and Laying BUSG for correction layer Bituminous concrete in kilometer 3-0 to 5-0 and edge line
Providing and laying 25mm thick mix seal surfacing (Type- A) including profile correction in Km. 0/0 to 1/0 and 1/0 to 2/0
Providing and laying 30mm thick bitumen concrete with paver finisher complete in Km 0/000 to1/000
Providing and laying built-up spray grout, bituminous concrete in Km. 0/0 to 0/800
Providing and Laying 25mm thick Mix Seal Surfacing Type-A at RD. 41/0 to 43/0 2.00Km
Providing and laying renewal coat by providing 25 mm thick Bituminous Concrete in Km.3/00 to 3/600 and 6/00 to 7/00
Providing and laying renewal coat by providing 30mm thick Bituminous Concrete in Km.1/500 to 2/00)
Providing and Laying renewal coat by providing 30mm thick Bituminous Concrete in Km.1/00 to 2/00 and 2/00 to 3/00
(SH-Repair of pot holes by providing and layng WBM G-III correction layer and 30mm.thick bituminous concrete in km. 13/0 to 14/0 and 16/0 to 17/0).
Providing and laying 30mm thick Bituminous concrete including profile correction in Km. 2/0 to 3/0
Providing and laying built-up spray grout, bituminous concrete in Km.0/0 to 1/0
Providing and laying renewal coat by providing 25 mm thick Bituminous Concrete in Km.28/00 to 29/00, 30/00 to 31/00, 31/00 to 32/00, 36/00 to 37/00 and 37/500 to 38/600
SH PL 30mm thick Bituminous concrete Wet Mix Macadam WMM Priming coat and Tack coat in km 0 0 to 1 320 to 3 500 and Providing and applying thermoplastic layer at RD 1 320 to 3 500
Providing and laying renewal coat by providing 25 mm thick Bituminous Concrete in Km.5/00 to 7/500
(SH- Providing and laying 25mm thick Bituminous Concrete in km. 7/0 to 8/0, 9/0 to 10/0 and 17/0 to 19/0 including profile correction).
(SH- P/L tack coat, P/L 30mm thick B.C. And 2.5mm thick road marking thermoplastic strip in km. 2/0 to 3/0, 3/0 to 4/0, 4/0 to 5/0, 5/0 to 6/0 and 6/0 to 6/500).(HP0302VR0082).
SH- Providing and laying bituminous concrete , WBM, G-III and thermoplastic paint in Km 0/0 to 3/00
SH PL 30mm thick Bituminous concrete, Wet Mix Macadam WMM Priming coat and Tack coat and Providing and applying thermoplastic layer in km 0 0 to 3 740
SH Providing and laying 25mm thick bituminious concrete in KM 0/0 to 1/600.
Providing and Laying renewal coat by providing 30mm thick Bituminous Concrete in Km. 27/00 to 29/00
SH Providing and laying 25mm thick Bituminous Concrete including repair of road.
Providing and laying built-up spray grout, bituminous concrete in Km. 41/0 to 42/0
Providing and Laying BUSG for correction layer Bituminous concrete in kilometer 1-0 to 3-0 and edge line
Providing and laying 25mm thick mix seal surfacing (Type- A) including profile correction in Km. 0/00 to 1/00 and 1/00 to 2/00
Providing and laying built-up spray grout, bituminous concrete in Km. 60/0 to 61/0
Providing and laying built-up spray grout, bituminous concrete in Km. 3/0 to 4/0
Providing and laying built-up spray grout, bituminous concrete in Km.0/0 to 1/0
Providing and Laying G-III 53to22.4mm BUSG for correction layer Bituminous Concrete in kilometer 0-0 to 3-0 and edge line
Provisioning of CERC (GNA) Regulations- 2022, latest DSM Regulations of the CERC / HPERC and new Power Exchanges in different software modules of the existing integrated IT Solution/ Software Applications, upgradation of the Website and Portal.
RMO Fire Alarm & Fire Fighting System, DG Set, Pump Set, UPS, EPABX System and Central Heating Plant at Gorton Castle Building Shimla (HP). (SH:- Routine maintenance and operation of FA & Fire Fighting System and operation of Sub Station, DG Set & ... and AMC of
AMC of instruments of District water testing Lab in Nahan for 3 years
(SH- Providing and laying 25mm. thick Bituminous concrete in km. 0/040 to 1/0 including profile correction). Under Annual Maintenance Plan for the year 2025-26.
(SH- Repair of pot holes by providing and laying WBM G-III correction layer and 30mm. thick bituminous concrete in km. 3/0 to 4/0, 5/0 to 6/0, 7/o to 9/0, 13/0 to 14/0 and 14/0 to 15/0).
Providing and laying built-up spray grout, bituminous concrete in Km. 29/0 to 30/0)
Providing and Laying 25mm thick Mix Seal Surfacing (Tyep-A) at RD. 4/0 to 5/0 1.000 Km).
(SH- Repair of pot holes by providing and laying WBM G-III correction layer and 30mm. thick bituminous concrete in km. 0/0 to 1/100).
P/L Bituminous Concrete 25mm thick at RD. 1/00 to 2/00, 2/00 to 3/00 and 3/00 to 3/200) (HP0301VR0029). (ii) C/O link road to Village Jandral Km 0/0 to 1/870. (SH P/L Bituminous Concrete 25mm thick at RD. 1/00 to 1/870)
Providing and laying 25mm thick Bituminous concrete and thermoplastic paint in K.M. 4/0 to 5/0 and 6/0 to 7/0
Providing and laying built-up spray grout, bituminous concrete in Km. 3/0 to 4/0
P/L 30mm thick bituminous concrete in Km. 0/00 to 1/00).