Loading…
Loading…
9,012 results • Best match
Installation of tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell
Installation of Tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell.
Installation of Tubewell
Installation of tubewell
Installation of tubewell
Installation of Tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell
Installation of tubewell
PVC shallow tubewell
Installation of tubewell
Repairing 05 nos. existing stone studs to protect village abadi and its agriculture land of village Rajpur Dungarpur and rainy well tubewell of Rajpur Dungarpur river complex after flood 2019.
Provinding and Installing 1no. MS Tubewell of size 250mm x 200mm in Uchani at ward no. 01 with Pumping Machinery, rising main complete in all respect under M.C. Karnal(Recall)
Providing and Laying of 80mm thick IPBs on converging roads entering into Mukhija Colony from CLC to Govt Tubewell, Ward no. 18, MC Panipat (Urban).(Only For L/C Societies)
PF of submersible cable 16 Sqmm other allied works contingent thereto at Tubewell No 1 2 and 3 Sec 11 and TWell No 4 5 and 6 Sec 12 Panchkula
P/I of Tubewell complete with machinery complete in all respect in Gopal Colony near H/o Lichu Parjapat, Ward No. 24, MC Panipat. Under D-Plan scheme 2019-20
Construction of Rainwater Harvesting Recharge Well for Roof Top and Surface Water in Kunjpura S/Division Office Complex near Tubewell and in Augmentation Canal Colony near Temple, Meerut Road, Karnal
Repair and renovation of tubewell No. D-1 HSVP staff quarter Sector 4, MDC area Panchkula complete in all respect (A/mtc of road sector 1 to 6 MDC, Panchkula)
Drilling, boring and Installation of 2 Nos. Tubewell with Reverse Rotatory Method) in Rajiv Nagar East, Gali no. 7 and Sanjay Gram Block A Ward no.07 Gurugram under MCG.
Operation and Maintenance of boosting station, Tubewell and water supply line dia 4 to 16 dia in Ward no. 15 Division 1B for 8 months, Zone- 1B under MCG.Re-call
PROVIDING AND INSTALLING 1No TUBEWELL IN WARD NO. 15 OF SIZE 250mm x 200mm UP TO DEPTH OF 200 MTR. BGL INCLUDING DISTRIBUTION SYSTEM, COMPLETE IN ALL RESPECT UNDER MCK
Drilling Boring and installation of 03 Nos Tubewell with Reverse Rotary Method in Block no G and H and K Block Palam Vihar div 7 and all others works contingent.
Construction of Street and P/L of NP-2 Pipe From Gupta Petrol Pump to PHED Tubewell in Newly Approved Veer Nagar Colony, Ward No.-06, M.C Yamunanagar Jagadhri.(Recall)