Loading…
Loading…
24 live16 closing this weekmost from Maharashtra State Electricity Distribution Co. Ltd. and CE-Water Resources Dept. Pune
24 results • Best match
Construction of Platforms around Hand Pumps on borewells in Satara district as per UNICEF Design
Supply of India Mark - II Hand Pump Spares
Supply of handpump material
Estimate Of For Bore Well And Misc At. P.S.C Urdu School At Wara Jha. Tq Dt Washim
Drilling of bore well and installation of Submersible pump at 33/11 KV Sub-Station Dhamangaon Deo Tal- Dist-Buldhana
Dismantling of India Mark 2 Hand Pump and Repair with necessary material in All Satara District
Installation of 1000 LPH RO Water Plant including shed and 1 No. Bore Well at Yekona-I OCM under Amalgamated Yekona Sub Area of Majri Area.
Ukai songadh-Jalgaon Section - Provision of RWH,Bore well and recycling of Kitchen and Bathroom water through treatment under ADEN/Amalner(Composite Tender including Electrical work)
Drilling 150mm dia. Bore well and providing, erecting and commissioning of Submersible pump with water supply arrangement at various 33/11 KV Substation Nalegaon, TapseChincholi Ankoli, Belkund & Wanwada (5 nos) under O&M Division Nilanga & Latur
Provision of Trial New Borewell in TE Compound Dhamangaon Road Yavatmal
Drilling 150mm dia. Bore well and providing, erecting and commissioning of Submersible pump with water supply arrangement at various 33/11 KV Substation Nagalgaon, Wadhwana, Kolnoor & Gutti (4 nos) under O&M Division Udgir Tq. Udgir Dist. Latur.
Drilling 150mm dia. Bore well and providing, erecting and commissioning of Submersible pump with water supply arrangement at various 33/11 KV Substation Nalgir, Chapoli, Kumtha & sugaon (4 nos) under O&M Division Udgir Tq. Udgir Dist. Latur.
Drilling of Borewell and Installation of submersible pump in ward No.19 of NMC, Nashik
(98917) Supplying water to public toilets in MIDC area of Turbhe Ward by drilling a borewell.
Carrying out borehole investigations for Chainage Km 84 to Km 109 (25 km) and geotechnical investigations using Electrical Resistivity Tomography (ERT) for Chainage Km 110 to Km 135 (25 km) for preparing the Design, Estimates and Detailed Project Rep
Carrying out borehole drilling (boreholes) from Km 58 to Km 84 (total length 26 km) for conducting surveys and investigations for preparing the Design, Estimates, and Detailed Project Report (DPR) for the project to supply Krishna River water to dro
Carrying out borehole drilling (boreholes) from Km 29 to Km 58 (total length 29 km) for conducting surveys and investigations for preparing the Design, Estimates, and Detailed Project Report (DPR) for the project to supply Krishna River water to dro
Carrying out borehole drilling (boreholes) from Km 1 to Km 29 (total length 29 km) for conducting surveys and investigations for preparing the Design, Estimates, and Detailed Project Report (DPR) for the project to supply Krishna River water to drou
DRILLING OF BOREWELL AND INSTALLATION OF 3 HP SOLAR BASED PUMP AT Mangali GP Mangali Tq Zarijamni Dist Yavatmal
DRILLING OF BOREWELL AND INSTALLATION OF 3 HP SOLAR BASED PUMP AT Junoni GP Zamkola Tq Zarijamni Dist Yavatmal
1.Providing and Erecting Of Solar Pump system On Ex. Borewell 2.Repair To Grampanchayat Office Building At Bhatsawangi Tq Hingoli Dist Hingoli
EEC/Dn/Latur/T-57/2026-27
Taking out submersible pump and lowering the same from g round tubewell of mine premises at GOCM under