Loading…
Loading…
13 live8 closing this weekmost from IRD - Chief Engineer and PD (Uttarakhand Urban Sector Development Agency IPMU) - ADB
13 results • Best match
Ground water recharge system through Non-functional handpumps in District Dehradun
PROVN OF AUTOMATION / SCADA SYSTEM FOR TUBE WELL / PUMP HOSUE AT IMA DEHRADUN.
Development of Water Supply Scheme Tube wells, rising mains, OHTs, Distribution System, House Service Connections including Allied Works with 2 years O and M at Kashipur Town.
Development of Water Supply Scheme Tube wells, rising mains, OHTs, Distribution System, House Service Connections including Allied Works with 2 years O and M at Rudrapur Town.
Custom Bid for Services - R and M of Water Flow Meters and Piezometers Installed in Various Tube Wells and Other Areas at HEEP Haridwar Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
Construction of New Borewell Near Overhead Tank at Chilla Project Colony
Supply of Submersible Pump Set at Central Store Tubewell Division Haridwar (Bahadrabad)
Supply of Unplasticized PVC Pipe 200 mm dia at Central Store Tubewell Division Haridwar (Bahadrabad) Lot 01
Annual Maintenance of its PLC/IRTu/Logo Based Pump Automation Control Panel with SCADA system with power wiring of various Tubewells Srinagar, Gauchar and Karanprayag Urban Water Supply Schemes on Rate Contract
Supply of PVC Flat Cable and 3 core 10 mm 2 at Central Store Tubewell Division Haridwar (Bahadrabad) Lot 04
Supply of PVC Flat Cable 3 core 6 mm2 and 3 core 10 mm2 at Central Store Tubewell Division Haridwar (Bahadrabad)
Term Contract for artificers works in Amenity Buildings consisting of IB Mandakini, Gangotri Guest House, OFIL Hostel, Officers Mess, Supply Tank near OFIL Hostel, Electrical Sub Stations, Tube Wells Shiv Mandir, Dulhani
Supply of M.S Column Pipe 150 mm dia with Socket Klit and Nut, 100 mm dia with Socket Klit and Nut, Nut and Bolt,Pannel Board and Bakelite Sheet at Central Store Tubewell Division Haridwar (Bahadrabad) Lot 03