Loading…
Loading…
1,70,107 results • Best match
Mini Tube Well Construction Work
TUBE WELL REPAIR ALL SANSAD
PURCHASING TUBE WELL SPARE PARTS
Supply of Tube well Material
Tube well boring and Installation
TUBE WELL AT SARGORIA HALDERPARA
INSTALATION TUBE WELL AT KANUDIHI
TUBE WELL NEAR HALDERPARA RASMATH
electrification of drinking tube well
Tube Well Installation Work Palkiya
Installation of deep tube well
Purchase of Tube Well Materials.
PURCHASE OF TUBE WELL MATERIALS
SUPPLY OF TUBE WELL MATERIALS
SUPPLY OF TUBE WELL PARTS
TUBE WELL AT LOHAR PARA
Supply of Tube-Well Parts
Purchasing of Tube Well Materials
TUBE WELL PARTS GP AREA.
Tube well at GP office
Purchase of Tube-well Parts
Sinking of deep tube well
Tube Well Repairing at Talanda
PURCHASE OF TUBE WELL MATERIALS
Purchase of Tube well materials
Mini Tube Well Construction Work
TUBE WELL NEAR DAS PARA
REPAIRS/ REPLACEMENT MAINTENANCE OF CENTRIFUGAL PUMP SETS, SUBMERSIBLE PUMPS, BORE WELLS GI/ DI/ PPR PIPR LINE DISTRIBUTION SYSTEM, BOREWELLS TESTING OF WATER AND CLEANING OF OHT UG SUMP, STARTER, VALVES, FITTINGS AND CONNECTED ALLIED WORK AT CDM
Sinking of Tube well near Dakshin Para Dag no 2622 Khatian no 3933 JL no 23 Mouza B Bagaria under Heliagachhi Dakshin
Drilling of Tube Well 150/125/115 mm Dia Telescopic type (60 No.) 90 mtr.At various villages in Distt.- Dindori. (Group-2)
Repairing with Ring boring of Tube-well near the house of Mrinal Kar at HARIPUR JL No 21 Under Haripur Gram Panchayat
Repairing with Ring boring of Tube Well near the house of Rebati Giri at HARIPUR JL No 21 Under Haripur Gram Panchayat
SH Drilling and Lowering of 60 mtr deep bore well
Installation of Shallow Tube Well Projects
SUPPLY HAND PUMP MACHINE
(NIT 22/25-26) WORK OF REMOVAL OF DEFUNCT/ ABANDONED HAND PUMPS AND CONSTRUCTION OF HAND PUMP PLATFORM IN VARIOUS URBAN AND RURAL WATER SCHEMES UNDER JURISDICTION OF PHED DIVISION BEAWAR ON ANNUAL RATE CONTRACT BASIS
Repair of non functional hand pump under Jal Shakti Sub Division Saraswati Nagar Tehsil Saraswati Nagar Distt Shimla HP SH Repair of 22 Nos hand pumps at various locations under Jal Shakti Sub Division S/Nagar
NIT 100/20-21-- Rate contract for Construction of 125 mm diameter Tube wells, Installation of Hand pump sets with construction of platforms and soakage well in Sub Dn Sambhar Under jurisdiction of District DIV. III Jaipur
NEDC Sirkali Division New submersible Bore well erection for Upgrading Achalpuram 110 11 KV Substation Premises in respect of Nagai EDC.
Provision of Bore-well, Staging, Sintex, and Water Supply, Hand pump, cleaning/deepening to Open well pump house improvement work under ADEN(N)KATOL Section at Godhani ,Bharatwada, Kalmeshwar, Kohli ,Sonkhamb, Metpanjra , Kalambha, Katol Station.
Constg. Bore Well with Hand Pump At -Ranzani 2.Constructing Sanitation Arragenment At Ranzani 3.Const. of Water Supply Scheme At Ranzani Bhimanagar 4.Constg. Water Supply Scheme At Ranzani Z P School Tal-Madha
Providing Additional Amenities to RJC (B) Mahabubababad District (Toilet block with Septic Tank (1 Block 20 Nos(Removal Surface boulders (Back Side) & Levelling the Play Ground, Drilling of Bore Well, Hand Pump & submersible Pumpset etc.,)
P and L (300x200mm) Deep Bore Tubewell with reverse rig method or any other method of latest technology at Dashmesh Nagar, tanki wali gali in Moga city
Construction of 300x200 mm size of 400/370m Deep Bore Tubewell and allied works in ward No. 04 Saket Nagar Rampur Rooad Market at Nagar Panchayat Shivli
P and L (300x200mm) Deep Bore Tubewell with reverse rig method or any other method of latest technology at Tanki wali gali, Chowk Shekhan in Moga City
P and L (300x200 mm) Deep Bore Tubewell with revrse rig method or any other method of latest technology at Bukkanwala road, Near Disposal in Moga city.
Rough Cost Estimate for Providing and Installation of 40HP (300X200 MM) Deep Bore Tubewell against failed twell in Daulat Colony , Ward No. 8, Ludhiana. (Third Time Tendering)
Cast iron components (Deepwell Hand Pumps Components) as per IS 15500 (Part 6), Handpump sub-assemblies (Deepwell Hand Pumps Components) as per IS 15500 (Part 3), Rubber components (Deepwell Hand Pumps Components), General Purpose Pipe Wrench, Non ... (Deepwell Hand Pumps Components) ...
Drilling of Borewell and Tubewell Drilling and other works Contractor Panel
Supply of Rate for Borewell Drilling / Tubewell Drilling At Amravati District