Loading…
Loading…
8,242 results • Best match
Damper Shimmy, Wiper Blade, Hand Pump HDP, Thermoplastic Hose, Gear Shift Tube
Work of soak pits at 16 places for water collection of water coming out of hand pumps in Nagar Panchayat Chhatari.
Boring of 25 Nos India Mark II Hand Pumps by Palm and Pressure method in different areas of Nagar Palika Amroha.
CONSTRUCTION OF 1 NOS. BOREWELL AND MAKING CONNECTION TO EXISTING SUPPLY LINE INCLUDING ELECTRICAL WORKS AT KENDRANCHAL COLONY POCKET-II, PREETAMNAGAR, PRAYAGRAJ Subwork/Packages: CONSTRUCTION WORK
REPAIR MAINT OF BOREWELL INCLUDING DEVELOPMENT OVER PUMPING PEA GRAVEL FILLING AND CERTAIN ALLIED WORKS AT VARIOUS PUMP HOUSES UNDER AGE (I) AYODHYA CANTT
REPAIR / MAINT OF BOREWELL INCLUDING DEVELOPMENT / OVER PUMPING / PEA GRAVEL FILLING AND CERTAIN ALLIED WORKS AT VARIOUS PUMP HOUSES UNDER AGE (I) AYODHYA CANTT
SPECIAL REPAIR FOR REPLACEMENT OF OLD UNSERVICEABLE BOREWELL AT PUMP HOUSE NO. 01 WITH ALLIED WORK AT AYODHYA CANTT UNDER AGE (I) AYODHYA CANTT.
PROVISION OF 01 NOS NEW BOREWELL AT QTR NO 960 TYPE V AT GPRA COLONY KAMLA NEHRU NAGAR GHAZIABAD DURING 2024 25 CIVIL WORK
REBORE OF HANDPUMP IN 5 LOCATION -WARD 49 KOTLA KAICHI WALON ME , KOTLA MADARSE KE SAMNE , PRIMARY SCHOOL KE PASS , PURVA MAHAVEER KALLU SAI KABRISTAN KE SAMNE , PURVA MAHAVEER NAGAR NIGAM KE PEECHE .
MR of Tubewell Boring at B 189 Member Residence Niralanagar and Ex En ECCD I office at Puraniya Aliganj Lucknow
Staff for Watch and Ward and operation of Submersible Pumping Plant (17 Nos), Dozer (34 Nos) and D.G. set (10 Nos) etc all complete, dully installed at Various Tubewells Under Maha Kumbh 2024-25. (PACKAGE-62)
Construction of New Tubewells (S/I/T/C/Pumping Plant, S/I of Electric equipment and C/o Electric panel Room) and providing and laying water supply line in SLF Village- Astoli of Greater Noida.
Work of installation of 01 new tube well in Ward No 07in Nagar Panchayat Patiali
Provision of Boring for new tube well in Running room 555 & 556, Running room 17, TTE Running room, D cabin, East Receiving cabin, East outer cabin, UP departure Yard, DRM office, Hospital, Rest House, C&T Barrack, ETTC hostel, Station, Cycle Stand and small pump house in DDU under ADEN/HQ/DDU.
nagar panchayat usawa me bhivenn wards me indiamarka-2 handpumps ke rebore ka karya
Block Najibabd ke Village Rassolpur said me Chamrola sampark marg se samshul ke tubewell tak mitti khadnja karya Lot 22
SUPPLY AND CARRIAGE OF PEA GRAVEL 2.00MM TO 3.35MM SIZE FROM LALKUWAN TO PIPIGANJ STORE GORAKHPUR TUBEWELL CONSTRUCTION DIVISION GORAKHPUR.
BVN(J) year 2020-21 k antergat gram Lohra me Vimal Singh ke Khet me Tubewell Vidhut sahit nirman karya.
SUPPLY AND CARRIAGE OF PEA GRAVEL 2.00mm TO 3.35mm SIZE FROM LALKUWAN TO SALEMPUR STORE DEORIA, TUBEWELL CONSTRUCTION DIVISION GORAKHPUR.
Vikas Khand Badraon ke Gram Panchayat Atarwan Me Pitch Road se Shri Kant ke Tubewell tak C.C. Road Ka Nirman.
SUPPLY AND CARRIAGE OF PEA GRAVEL 2.00mm TO 3.35mm SIZE FROM LALKUWAN TO LACHHIPUR STORE GORAKHPUR, TUBEWELL CONSTRUCTION DIVISION GORAKHPUR.
SUPPLY AND CARRIAGE OF PEA GRAVEL 2.00mm to 3.5mm SIZE FROM LALKUWN TO LACHHIPUR STORE GORAKHPUR TUBEWELL CONSTRUCTION DIVISION GORAKHPUR
Work no-61 Construction of C.C. Road from House of Mayaram towards Tubewell of Rajveer in Village- Kutakpur, Block- Shamsabad.
1. Ward No. 13 mai Karan Singh ki tubewell se Devgoda road tak CC dwara sadak aur nali nirman karya
CONSTRUCTION OF 04 Nos JUNIOR ENGINEER RESIDENCE Type III G Plus 1 AT TUBEWELL COLONY CAMPUS JALAUN of District JalaunU.P.
Ward number 28 and Bihari bag Mein Sumit ke Makan se tubewell ke aage Tak CC Sadak Ka Nirman Karya
OPERATING AND MINOR MAINTENANCE OF 2 NOS. DEPARTMENTAL TUBEWELL IN THE RESIDENCIAL COLONY OF 400/220 KV S/S AZAMGARH
Construction of 1 no. Tubewell and S/F of 7.5HP submersible pump, starter, column pipe at NMY Chandpur (Distt. Bijnaur)
Construction work of RCC covered drain from tubewell to Lalsana square on Lavad Road in Ward 27 Pallavapuram Phase 01.
Construction of 450m or 500m deep with 300mmx150mm dia tubewell 2Nos development by compressor and OP unit in Distt Jaunpur
WARD NUMBER 08 SONAPUR TRITI MEIN 05 HP TUBEWELL ADHISTHAPAN KE SATH CONNECTION SAHIT PIPE LINE VISTAR KARYA 700 METER
SUPPLY AND CARRIAGE OF PEA GRAVEL 2.00mm TO 3.35mm SIZE FROM LALKUWAN TO PIPIGANJ STORE GORAKHPUR TUBEWELL CONSTRUCTION DIVISION GORAKHPUR.
13 Const. of C.C. Road drain and Interloking utility duct from taj hotel to tubewell no-2, Moh sarai, Haldaur
Renewal of Atarsui km-2 se bhim singh tubewell hote huye harijan basti sampark marg in FY-2026-27-70
MAINTANCE WORK OF MITTI KHADANJA FROM JAIT KHAN KHET TO MUKHTAR KHAN TUBEWELL VIA MUKHTAR KABRISTAN IN GRAM SABHA DHAWA
LAYING OF 200MM M.S PIPE LINE FROM TUBEWELL NO. 3 TO NOOR MOHAMMAD SHOP TIKONA AT NAGAR PANCHAYAT SAHASPUR BIJNOR
BVN 2021-22 Baberu Marka ke majra Bairaf me Gulab Pyasi ke khet me TubeWell Vidhyut sahit ka nirman karya
Construction Work of Drain and cc road from mohalla Parshuram Colony Brajesh to Pehelwan, Tubewell wali gali, Ramesh wali gali.
Construction of Mahui sangram pitch road to Tubewell link road in Dist Deoria under Scheme PVN in FY 2022-23
Construction of Interlocking work from House of Ramshabad Chauhan vai tubewell of Ramsingh in Village Saraykhwaja Bade Tamadi Block Badraon
Construction of Interlocking Road in Block Mahewa Village Maniyamu Tehsil Bharthana Main Road to Shakuntla Devi Diary via Raghuveer Tubewell
SUPPLY AND CARRIAGE OF PEA GRAVEL 2.00mm TO 3.35mm SIZE FROM LALKUWAN TO KAURIRAM STORE GORAKHPUR TUBEWELL CONSTRUCTION DIVISION GORAKHPUR.
CONSTRUCTION OF C.C. ROAD AND DRAIN IN WARD NO. 01 MAHATMA GANDHI NAGAR FROM GOVT. TUBEWELL TO RAM SARAN HOUSE.
Under District Bhadohi, Interlocking work from tubewell of village Rajaipur to Ramnaresh Patel house under Block Bhadohi Lot No 15
Special Repair of NH-24 Bholanath Dhaba to ITI College to Ghansurpur Master Santosh Tubewell to Papsara Amroha Atrasi Road
Maintenance of tubewell in CISF colony, misc. civil and acid proof lining, CT, painting work of BTPS, Obra, Sonbhadra (U.P).
Ward No. 07 me PWD Road se Ameen ke tubewell hote hue Badaruddin ke ghar tak CC Road Nirman karya.
SUPPLY AND CARRIAGE OF PEA GRAVEL 2.00mm to 3.5mm SIZE FROM LALKUWAN TO BASTI STORE BASTI TUBEWELL CONSTRUCTION DIVISION GORAKHPUR.
Laying of 200/150mm DI-K7/M.S. Raising Main Pipe line From TubeWell To Raising Shifting In Moh-Jabtaganj, Najibabad
SUPPLY AND CARRIAGE OF PEA GRAVEL 2.00mm TO 3.35mm SIZE FROM LALKUWAN TO KAURIRAM STORE GORAKHPUR, TUBEWELL CONSTRUCTION DIVISION GORAKHPUR.