Loading…
Loading…
8,217 results • Best match
Reboring of india mark-2 Handpump.
Installation of India Mark-II Handpump
INDIA MARK-2 HANDPUMP REBORING WORK
NP Barwar me Handpump Reboor 12No
Installation of india mark-2 Handpump
INDIA MARKA2 HANDPUMP REBORE 100 PIECES
INDIA MARKA HANDPUMP MARAMMAT SAMAN (Q3)
INDIA MARKA HANDPUMP MARAMMAT SAMAN (Q3)
INDIA MARK HANDPUMP BORING WITH INSTALATION
Supply of Handpump Spare parts (Q3)
India Mark II Handpump Repair work
India Marka II Handpump Rebore Karya
EEBORING OF INDIA MARKA SECOOND HANDPUMP
Reboring of India Mark-II Handpump
INDIA MARKA HANDPUMP REBORE WORK (Q3)
INDIA MARK II HANDPUMP REPAIRING MATIRIAL
SUPPLY OF HANDPUMP MARAMMAT SAMAGRI (Q3)
Reboring of India Mark II Handpump
Installation of India Mark II Handpump
India Marka Handpump With Full Installation
JalKal India Mark-2 Handpump (Q3)
Construction of tube well and appurtenant works under Nagar palika parisad chunar in district mirzapur
Hydraulic Jack capacity 50ton with high-pressure hand pump and lock nut (01) hand pump - maximum working pressure 10,000 PSI, pressure can be reduced at any movement during operation, weight with hydr
C o Permanent structures at BOP Narkul of 43rd BN SSB Siddharthnagar. SH Civil Plumbing Electrical Bore well and Road.
Cleaning of overhead tanks, UG Sumps, Static water tank and redevelopment of bore well including allied works at AFS Kanpur
NEW INDIA MARKA HANDPUMP SUPPLY AND INSTALLATION (10 NOS)
HANDPUMP REPAIRING ITEM (Q3), WATER LEAKAGE REPAIRING ITEM (Q3)
13 nag Handpump Rebor Work in Different ward in Nagar Panchayat
Internal /External Water Supply in Sector -164, Noida (Erection of Boosting Pumping Plant for UGR and Erection of Pumping Plant for Tube Wells)
Civil works for Construction of pump rooms i/c required water lines for proposed Tube wells near ESB-I Building and Type-I
Construction of Tubewells at Bithoor Nagar Panchayat
Drilling of State Tubewells at District Amethi
Drilling of State Tubewells at District Sultanpur
Drilling of State Tubewells at District Ayodhya
Strengthening of Water Supply (Reboring of Tube Well No.-1/122, 4/122, 5/122 and 8/122) Noida. (Erection of New Boring, S/F Pumping Plant, Making Foundation, Chain Pulley Stand and Connection for Tube Well).
Strengthening of Water Supply (Reboring of Tube Well No.-1/27, 3/27, 1/17 and 3/17) Noida. (Erection of New Boring, S/F Pumping Plant, Making Foundation, Chain Pulley Stand and Connection for Tube Well).
Strengthening of Water Supply (Reboring of Tube-Well No.-1/76, 4/76, 5/71 and 1/50B) Noida. (Erection of New boring, S/F Pumping plant, Making Foundation, Chain Pulley Stand and Connection for Tube-Well)
Installation work of 27 India mark-II handpumps at different places of the city.
Tubewell Work Mohlla Jhojhiyaan Ward 08 Nagar Panchayat Barhapur.
INDIA MARKA 2 HANDPUMP 30 ADAD AWASTHAPANA KARAKAR
Work No.14-Reboring work of tube well located in Ward No. 31, Chandiyana Mohalla Sarai.
150 mm diameter DI/PVC pipeline 200 meter extension work for newly constructed Lalpur tube well.
Special repair of Manohargan Link Road Deshraj s tube well to G.T. Road to kaju Road
Under water supply reboring of 7.5 HPA sub mini tube well in Moh. Shekh Saray Patiya
Development of Tube Well by 250 PSI air compressor in district- Varanasi, Ghazipur, Jaunpur and Chandauli
Plaster repair, painting, whitewashing, floor interlocking and construction of brick chamber in tube well number 7
construction of tube well in ward no 14 moh mansabpura khsra number 2072 near nanwa house
Development of Tube Well by 600 PSI air compressor in district- Varanasi, Ghazipur, Jaunpur and Chandauli.
Development of Existing Tube well at Back side of TAX Building in BSNL CTO Compound Varanasi
Development of Tube Well by 250 PSI air compressor in district- Varanasi, Ghazipur, Jaunpur and Chandauli