Loading…
Loading…
8,219 results • Best match
Construction of tube well with appurtenant works at ward pared in Irrigation Department under Aadarsh Nagar Panchayat Kacchwan Mirapur
Boring work for Tube well with Electric Pump of capacity 12.5 HP for Potato Farm at Babugarh, District Hapur
Work of tube well boring near District Cooperative Bank in front of Town Inter College within the city area
Installation work of 7.5 HP tube well near Jafaria Madrasa, Alam Pani Wala in Ward No. 14 and 3.
Construction of Boundary Wall and Renovation Work Tube Well Water Works Residence and Painting at Water Works Compound Kiratpur
Work of laying 110 mm diameter pipeline from tube well to Deendayal Park in Ward No. 48 Labor Colony.
Complete work of installation of 7.5 HP mini tube well near Mohd Parade Sukhumal Road under the civic body
Boring and Const of 20 HP Tube Well with AMC and Operation for three Yr at Indira Bhawan Campus
Gram belai me rajju prajapati ke ghar se sarkari tube well sampark marg me c c road nirman kary
Work of issuing connection of one State Tube well Sonhan for Electricity Distribution Section Deposit Scheme year 2025-26
Drilling, supplying, installation and commissioning of 2 nos. deep tube well in old and new CHP at Khadia Project
BVN 2020-21 Baberu me Rajkiy Paijal (Tube well) ke pas se Community Ladies Toilet tak CC Road nirman
Instalation of Three Phase Electronic meter at World Bank AND State Tube-well in the area of EDC-Hardoi
Pipeline work from mini tube well to Galla Mandi main gate Hanumangarhi extended area Ward No. 06 Rudra Nagar.
Construction work of the Baudryball around the tube well near the police station in Ward No. 48 Labor Colony.
The work of laying the main rising of the newly constructed mini tube well behind the Nagar Palika office.
Development Block Mirzapur, Village Saunik Interlocking paving and drainage work from the link road to Sarla Devi tube well.
Construction of rising main for feeding over head tank from 03 nos tube well at sector-25(SDZ) , YEA
PIPE LINE EXTENSION, TUBE WELL REBORE AND HOUSE CONNECTIONS IN EXISTING SENGAI W/S OF FIROZABAD BLOCK, DIST. - FIROZABAD.
Work of pipeline expansion, tube well repair, sewer chamber repair and septic tank cleaning in Vaishali Housing Scheme Colony
Construction work on the connecting road from tube well of Mukesh to the main access road in Village Pahadpur.
Pipe line expansion work, repair work of tube well and over head tank in Buddha Bihar Part-A Colony
Construction of a road from Chak Mahdood to Master Buddh Singh tube well in Village Sihali (Development Block Joya).
SITC of 01 No. Tube Well Submersible Pump for Newly Developed Bore at Income Tax Office, Civil Lines, Prayagraj.
Laying of rising pipe line from newly installed mini tube well to over head tank. (whole queen extended area)
Installation of 3-Phase meter on the PTW (Private Tube Well) Connection under Substation Milak Khanam, Swar and Tanda
HANDPUMP ADHISTHAPAN WORK
HANDPUMP REBOR WORK
Construction of 300 x 200 mm size tube well with appurtenant works at Ward No 49 Neem Sarai MIG Park near St. Vishna School under Jal Kal Vibhag Nagar Nigam Prayagraj
Under the Electricity Distribution circle Chandauli under the area of Electricity Distribution Division-Ist-Chandauli, 2nd-Mughalsarai, 3rd-Sakaldiha , the work of installing three face meters on 342 tubewells by State Tubewell Block Chandauli
SITC, Trial Run, Maintenance and Hand Over to Gram Panchayat / Local Body of Submersible Pumping Plants for Tube Wells of Jajau Water Supply Schemes in District Agra
SITC, Trial Run, Maintenance and Hand Over to Gram Panchayat / Local Body of Submersible Pumping Plants for Tube Wells of Barhan Water Supply Scheme in District Agra
S.I.T.C., Trial Run, Maintenance and Handing Over to Gram Panchayat / Local Body of submersible pumping plants for Tube Wells of Different Water Supply Schemes in District Agra
SITC, Trial Run, Maintenance and Hand Over to Gram Panchayat / Local Body of Submersible Pumping Plants for Tube Wells of Garhmukkha Water Supply Schemes in District Agra
Construction of tube wells of size 300 mm x 200 mm dia and 225m deep and construction of pump house and laying and interconnection of rising main
Construction of 200 x 150 mm / 200 x 200 mm dia size tube wells against Kumbh Mela 2025 Phase II under Jal Kal Vibhag Nagar Nigam Prayagraj
Construction of 300 x 200 mm / 300 x 300 mm dia size tube wells against Kumbh Mela 2025 Phase II under Jal Kal Vibhag Nagar Nigam Prayagraj
Plain Washer-IS:2016, Cast iron components (Deepwell Hand Pumps Components) as per IS 15500 (Part 6), Thread, Cotton, Sewing – OFB, Stainless Steel Bars and Flats, Unplasticized Pvc Pipes For Potable Water Supplies-IS 4985, Handpump sub-assemblies ... (Deepwell Hand Pumps Components) ... action hand pump (Hand ... ( Hand Pumps ) ...
Making arrangement of inter connected loop line for water supply and arrangement of one additional bore well and water harvesting system at HRI, Prayagraj
COMPLETION OF INCOMPLETE WORK FOR SPECIAL REPAIR/ REPLACEMENT OF BER BORE WELL OF PUMP HOUSE NO. 03 AT NEW CANTT UNDER GE (WEST) PRAYAGRAJ.
nstallation of 3 inth dia MS pipe mini Bore well with 10 HP submersible pump and construction of pump house for water supply purpose
INSTALLATION OF INDIA MARK-II HANDPUMP 16 PIECE AT SAHAWAR
Installation of a Mini Tubewell in Ward No. 07, Dayanand Nagar
PMAGY, Vikas Khand-Jogiya, Village-Kodratal me Nali, India Marka Hand Pump, Yevam Street Light Ka Karya.
Intallation of New/Rebore India Mark-II Hand Pump in NP Thanabhawan and Jallalabad in District- Shamli
Construction of U-Drain and Interlocking Sarkari Hand Pump to Baleel House Mohalla Gadiyana ShantiPuram Colony Shahjahanpur.
Installation of New and Rebore India Mark II Hand Pump in NPP and NP of District Fatehpur
9-09 NAG INDIA MARK-II HAND PUMP WARD NO.01,02,03,07 AND 09 ME REBORE KA KARYA
India marka hand pump re bour ka karye pappu rathor k makan k pass ward no 5
FOR Installation of Boaring, Loaring and Installation of Submercible Pump and Hand pump at A.T.S. Vatti, Mathura.