Loading…
Loading…
8,104 results • Best match
Handpump sub-assemblies (Deepwell Hand Pumps Components) as per IS 15500 (Part 3), Cast iron components (Deepwell Hand Pumps Components) as per IS 15500 (Part 6), Steel Tubes For Structural Purposes-IS:1161, Steel components (Deepwell Hand Pumps ... (Deepwell Hand Pumps Components)-IS:15500, ...
C/o 01 No. Tube Well at Akansha Parisar Pocket-A, Sector-F, Jankipuram, Lucknow. (SH:-SITC of 33 HP Water Supply Pump Set for new bore well and replacement of old submersible bore well pump in existing bore well with allied accessories).
Construction of (300x200mm) Size Deep Bore Tube Well By Rc Rig Machine and Development of the Tube well By Air Compressure and O.P Unit in Pump No-18 Jhalu Bus Adda Ke Peeche.
Handpump Sub - Assemblies (Deepwell Hand Pumps Components) as per IS 15500 (Part 3) (Q3), Steel components (Deepwell Hand Pumps Components) as per IS 15500 (Part 4) (Q3), Brass/Bronze Components (Deepwell Hand Pumps Components) as per IS 15500 (Q3), ... (Deepwell Hand Pumps Components) ...
Construction of tube wells and Installation of India Mark - II Hand Pump (DC and DTH) under Nagar Palika Parisad Chunar Mirzapur
Rebore of 300x200 se deep bore tube well By Re Rig Machine And Development of Tube Well By Air Compressure and O.P. Unit in Moh. Ramleela me Usman Patangbaz ke Samne Ward 07 Jhalu
HANDPUMP WORK
Establishment of new hand pumps at 10 places in the area of municipality
Installation of a tube well in Ward 23
Construction of (300x200mm) Size Deep Bore Tube Well By Rc Rig Machine and Development of the Tube well By Air Compressure and O.P Unit in Pump No-21 Moh Ragran Near Jama Masjid Tal Bijnor
NEW INDIA MARKA HANDPUMP LIND HAND PUMP WITH PLATFORM 1.65M DIA 10 NOS
Handpump sub-assemblies (Deepwell Hand Pumps Components) as per IS 15500 (Part 3), Cast iron components (Deepwell Hand Pumps Components) as per IS 15500 (Part 6), Steel Tubes For Structural Purposes-IS:1161, Malleable Cast Iron Pipe Fittings-IS:1879
Supply and Installation of India Mark-II Handpumps and Repairing of Old Hand pumps in Auraiya District Under CSR FY 2023-24.
Construction Tubewell (300x200mm) deep bore air compressor and OP Unit in mohalla Chimman ward 17
Handpump sub-assemblies (Deepwell Hand Pumps Components) as per IS 15500 (Part 3) Experience Criteria 1 Year (s)
Rebar work of 30 pieces India Marka-2 hand pumps in Nagar Panchayat Shahbad
Handpump sub-assemblies (Deepwell Hand Pumps Components) as per IS 15500 (Part 3), Cast iron components (Deepwell Hand Pumps Components) as per IS 15500 (Part 6), Steel tubes for structural purposes, Malleable Cast Iron Pipe Fittings Bidder Turnover (Last 3 Years) 3 Lakh (s)
CONSTRUCTION OF TUBE WELL AT PASU STHAL BACHAWALI BLOCK BARAGAON
Ward No.08 Construction of Tube well 35HP 2000LPM.
Tube well reinforcement work on Ward No. 17 Taimurshah.
Rebore of 300x200mm Size Deep Bore Tube Well By Rc Ring Machine and Devlepment of the Tube well By Air Compressure and O.P Unit Drilling 180Mtr Loring 170Mtr MS Pipe thickness 7.10mm in Moh-Shekharay and Mahalsaray Jalalabad.
NEW INDIA MARKA HANDPUMP LIND HAND PUMP WITH PLATFORM 1.65 M DIA 15 NOS AT SAHAWAR
Tube well rebar work near gaushala near ward number 01.
CONSTRUCTION OF TUBE WELL AT PASU STHAL KUDRI BLOCK BAMOUR
CONSTRUCTION OF TUBE WELL AT PASU STHAL KUMHRAR BLOCK MOTH
CONSTRUCTION OF TUBE WELL AT PASU STHAL PALINDA BLOCK BABINA
Construction and development of DC and DTH tube wells and SITC of DTH and DC hand pump in Nagar Parisad Chunar area in District Mirzapur
Handpump sub-assemblies (Deepwell Hand Pumps Components) as per IS 15500 (Part 3), Hexagon Head Bolts, Hexagon Nuts Bidder Turnover (Last 3 Years) 1 Lakh (s) Experience Criteria 1 Year (s)
Construction work of re ring machine (300x200) deep bore tubewell in tanki compound in Nagar Panchayat Jhalu
Construction work of re ring machine (300x200) deep bore tubewell in Barat Ghar in Nagar Panchayat Jhalu
CONSTRUCTION OF DEEP BORE TUBEWELL PUMPROOM, 250 KL OHT AT DISTRICT JAIL CAMPUS MEERUT DISTT.- MEERUT (U.P.)
Installation work for Pump House, Tube Well, and Borewell in Ward No. 02/04.
deepwell hand pumps
Rubber Components (Deepwell Hand Pumps Components)- IS:15500, IS:12732, Special Tools (Deepwell Hand Pumps Components)-IS:15500, Ball Bearings-IS:6455, deepwell hand pumps as per IS 15500 (Part 2), Handpump sub- assemblies (Deepwell Hand Pumps Components) as per IS 15500 (Part 3)
New tube well installation work in Ward No. 16 Dayanandnagar.
Installation of a tube well in Ward 25 Bada Bazar
CONSTRUCTION OF DEEP BORE TUBEWELL AND PUMP ROOM FOR AGRICULTURE WATER AT DISTT- JAIL MEERUT DISTT- MEERUT(U.P.)
CONSTRUCTION OF DEEP BORE TUBEWELL AND PUMP ROOM FOR DRINKING WATER AT DISTRICT JAIL MEERUT DISTT.- MEERUT (U.P.)
Rebore of 300x200mm S Deep Bore Tube Well By Re Rig Machine And Development of Tube By Air Compressure And O.P. unit in moh. Peerzadgan Ward 03 Jhalu
Strengthening of Water Supply( Erection of 03 No. New Tubewell for Water Supply Network Sector-75 ) (Construction of Pump House, P/L Tube wells rising main line, erection of pumping plant for Tubewells, electrification of TWs)
Handpump anurakshan hetu india mark II hand pump ke chain 4000 nag ki apoorti as per tender
Supply, installation, Commission and maintenance of India Mark-II Hand pump of Construction of Bore-well of suitable depth by suitable method of drilling by rig m/c, development of borewell including all, material T and P required for proper completi
Tube well rebor work located in Ward No. 09 Punjabi Colony.
Ward no. 10 in Nagar Panchayat Pisawa. Tube well installation work.
Ward no. in Nagar Panchayat Pisawa. 02 Tube well installation work.
Work of installation of 12 inch tube well in Dwarkapuram Colony
Installation of a tube well in Ward 19, Aryapuri Nala Patari.
2- Tubewell near Ganesh Nagar RC Chaudhary Rebor work of tube well near Chaudhary.
THANA MOD MANDIR KE PASS WARD NO 15 ME HANDPUMP REBOUR KA KARYA