Loading…
Loading…
6,660 results • Best match
Construction of 1 No. RCC Sump well of size 6 m x4m x4.50 m, const. of Screening Chamber of size 2.00 mtr x 2.00 mtr, Const. of pump chamber of size 4 m x 3 m, boundary wall , Supply, erection and commissioning of 2 No. 3500 LPM x 15 Mtr. and 1 No.
Const. of Open inlet channel 2 No. Bricks Lining SS Tank 2 No. RCC SS Well for Raw and Clear Water 2 No. RCC HLT 4 No. RCC FB 2 No. RCC CWT Filter Media sand washing platform Pump Chamber Boundary Wall Path at water works Const. of RCC NP2 pipe chann
Const. of 1 no. RCC S/S tank, Cosnt. Of C.C Road and Path at W/W, Const. and Repair of B/Wall, Const. of S.S. Well for Raw water and Clear water, Const. of 0.50 MLd WTP, Rep. of 3 Nos. C.W.T., Rep. of Boundary wall at B/S, Dismental 5 nos. F.B and
A/mtc of road in sec-2, Fbd. Pro. Fixing of RCC planks of size 1800 x 300 x 50 mm fencing with bars and 2400 x 1500 fixed in CC blocks (with clear height of 1.50 Mtr etc for boundary wall the HSVP vacated land in front of house no. 2514 to 2519
Const. of 4 no. RCC Filter bed, Const. of 2 Nos. Clear water Tank, C.C Road and Path at W/W, Const. of S.S. Well for R/W and C/W, Rep. of 5 Nos. Brick linning S and S tank, Rep. of 4 Nos. C.W.T., Rep. of PC., Rep. of Boundary Wall 704 mtr. Above DPC
At old WW Repair of B.Wall at w w, const. of Path and raod at w w, repair of boundary wall at b stn, repair of pump chamber at b stn, At 2nd Water works Laying of 400 mm id RCC NP2 pipe channel, Cosntt. of 1 No. S S Tank, Suction etc. as per subject
CCTV solution For Perimeter and Boundary Wall for 20 camera, Camera 2MP, Hard Disk 4 TB, Fiber Cabel 6 core sup. quality, Outdoor Cat 6, Power Cable, 05 MTR HDMI 4 k, POE Switch GIGA 8 Pot sup quality, Clips, Media Converter sup. quality, Out door Rack, Fiber Patch cord, Electric Power Board, RJ45 sup quality, NVR, Fiber Box, Installation Charges
TENDER ARE BEING INVITED FIRST TIME FOR CONTRACTORS/AGENCIES/SOCIETIES
(i)Repair to flooring, roofing, door & windows, sanitary fittings and drainage & sewerage system in staff quarters at GILL, QRP, AHH, KUP, MET, HMI & DUI and roof replacement of toilet and bathroom at Guard colony at DUI in the section of SSE/W/DUI ... to Boundary wall in ...
(i)Repair to flooring, roofing, door & windows, sanitary fittings and drainage & sewerage system in staff quarters at GILL, QRP, AHH, KUP, MET, HMI & DUI and roof replacement of toilet and bathroom at Guard colony at DUI in the section of SSE/W/DUI ... to Boundary wall in ...