Loading…
Loading…
6,660 results • Best match
Construction of 1 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap connec
Construction of 2 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap connec
Laying of 100mm, 150mm and 200mm i.d DI pipe line in village Mandothi, Repair of Existing 3 Nos. S.S Tanks at, 2 Nos. Clear Water Tanks, 4 Nos. Filter beds, Repair of Existing Boundary Wall, Repair of Existing Pump chamber of 13ftx28ft
Construction of 1 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap connec
Drilling of tubewell 400 mtr Depth and Pumping machinery, Construction of Pump chamber size 10 BY 12and scour Haudi, Construction of Boundary wall 60 mtr Laying of 150 mm id DI Rising main 50 mtr., Construction of CC Path Drilling of tubewel
Construction of 2 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap connec
Construction of 1 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap conn.
Construction of 3 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber, providing and fixing of Functional water tap connec
Construction of 2ACR in GGMSPS Ghirai,Construction of 1ACR and Boundary wall in GMSPS Farm Hansi,Construction of 2ACR and Boys Toilet in GMSPS Kulana,Construction of 2ACR in GPS Anipura,Construction of 2ACR in GPS Kutubpur (Under DEE 2025-26) Block
Construction OF school building in GPS GHESPUR, REPAIR OF CLASS ROOMS IN GMS CHHOTABANS(6269),REPAIR OF CLASS ROOMS IN GPS SIKANDARA , REPAIR OF CLASS ROOMS ,CONSTRUCTION OF TOILET and REPAIR OF BOUNDARY WALL IN GMS MT KRERA, AND ,CONST. OF GIRLS TO
Salimsar Marja- DNIT for the work of laying of D.I. pipeline, Providing 203 Nos. FHTC, Const. of 5 Nos. Sluice valve hodies , repair of 3 Nos.S/S Tank, Pumping Machinery, repair of boundary wall, washing of Filter media in Village Salimsar Majra
Construction of 1 No. Pump Chamber of Size 10x12, Construction of Boundary Wall 60 Mtr. Laying of 100mm i/d DI Water Supply Pipe Line including DI/CI Specials and Functional House Hold Tap Connection in village Panchayat Kanwara Kalan Distt. Fari
Annual Maintenance Estimate for R/C/E for balance Hort. works (Phase-II) for const. of boundary wall with grills fencing, C.C. Path, main gate, turning gate, providing and fixing of rain shelter, garden benches and dustbins etc. in the 06 Nos. parks
A/mtc of road in Sector-2, Faridabad. Construction of Boundary wall with RCC plank on HSVP vacated land in front of house No. 1548A to 1548 IP and 2515 to 2519P in Sector-2, Faridabad and all other works contingent thereto.
Construction of 4 Additional Classrooms in Govt Sr Secondary school Bighana, 2. Construction of 03 ACR and Boundary wall at GSSS Khanda 3. Construction of 02 ACR, 10 KW Solar and Iron Shed at GGSSS Alewa, Block Alewa, Distt Jind (Under DSE)
Priming, painting with exterior quality paint at main gate, lily pool, PUS platform of Atal Ji Statue, selfie point boundary wall, motor chamber, cleaning and repairing of main water body lily pool, repair of path and selfie point P/F of MS board
Const. of Inlet RCC NP2 pipe channel, repair of1 Nos. Brick lining S.S tank, rep.3 Nos. Filter bed, rep. 2 Nos. Clear water tank, rep. of Pump Chamber, rep. Boundary wall 561 mtr above DPC, Replacement PM, Laying of Distribution system, Restoration
Construction of 1 No. T/well chamber of size 3.05x3.66 Mtr. (10x12), Const. of Boundary wall length 61 Mtr. Iron Gate 1 No. Laying of Distribution pipe line and FHT connections and all other works contingent thereto at village Dhani Bachan Singh
Construction of 3 No. Pump Chamber of Size 10x12 Construction of Boundary Wall 180 Mtr. and Laying of 100mm i/d DI Water Supply Pipe Line including DI/CI Specials and Functional House Hold Tap Connection in village Panchayat DHAUJ Distt. Faridabad un
Repair of Clear water Tank Boundary wall 4 Nos Sluice Valve Houdi Laying of 4 inch DI pipe line and making functional House hold Tap Connection including CI DI special and GI special and all other contingent thereto Under JJM Cat III
Estimate for providing sewerage facilities in balance street in Barwala town Distt Hisar construction of mini disposal near Syani Pond one No Brick masonary collecting tank one No PC Boundary wall with iron gate laying of DI Rising main and AC risin
Estimate for laying of Rising main in New Rishi Nagar Booster Balance distribution pipe line replacement of old GI PVC pipe line in Hisar Town Construction of RCC under ground clear water tank Boundary wall DI rising main laying of distribution syste
Prov. and Laying of 400mm i/d RCC Pipe Inlet Channel, Construction of 1 No. S/S Tank, 2 No. RCC HLT, 2 No. RCC Filter Bed, 1 No. RCC CWT, Pipeline at Head Works, Repair Raising of Boundary wall, Distribution Pipe Line
Rough Cost Estimate for renovation/ raising of toewall in green belt along Safidon Road, Sector - 9, Jind Rough Cost Estimate for renovation/ raising of toewall in green belt along Safidon Road, Sector - 9, Jind
Block Madlauda
Rectification of deficiencies i.e. Providing and Fixing of 15 HP Induction Motor, Repair of Pannel 1, Repair of ACB 1 and 2, Repair of Gear Box,Air Blower at 18 MLD STP of Bahadurgarh Town and all other works contingent thereto
Drilling of tubewell on 400 mtr Depth and Pumping Machinery, Construction of Pump Chamber size 10 by 12 Construction of Boundary Wall 80 mtr Laying of D.I rising main 150 mm id 100 mtr. 100 mm id 200 mtr Construction of CC Path. Drilling
Repair of 2 No. S S Tanks, 2 No. S S Well, 10 no. SV Hodies, C.Conc. path road, Pump chamber, 1 No. CWT, Filter beds, boundary wall, laying of pipe line an functional house hold connection in street of village Sultanpur Distt. Hisar
Const. of MPS RCC Collecting tank and Screen chamber, sluice gate valve, pen stock, RCC Slab, Const. Pump Chamber, Const. C.C. Road, Boundary wall, Supply erec. Sub. Motor P. Set 5 no. 5 Nos. LT Panel Board, Supply of Gantry with chin pulley block,
1. Repair, Maintenance and White Washing of NRB at 66 KV S/Stn Babyal 2. Repair, Maintenance and White Washing of NRB at 66 KV S/Stn Pilkhani 3. Repair, Maintenance and White Washing of Boundary Wall of NRB at 66 KV S/Stn Nalvi
Construction / repairing of boundary wall (brick work) of tubewell E-1 Sector 25, Panchkula and cleaning of jungle of various tubewell in sector 25, Panchkula Extension (A/Mtc. of PH Services in sector 1 to 6 MDC and Sector 23 to 28, Panchkula Extens
Const of 1 No. SS Tank , Const. of Washing of Filter Media platefarm, Repair of 2 No. S S Tanks, Repair of F. beds, Repair of boundary wall, distribution system,CI DF PE Specials, F.H.T.C. at Village Kheri Gagan and all other works contingent ther
Raw Water Arrangement by pumping from Depal Minor 1. Retention Tank of Size 7.00 mtr i/d 2. Pump Chamber 3.05x3.66 mtr. 3. Pumping Machinery 4. Rising Main 200 mm i/d to Water Works 1250 mtr. 5. Boundary Wall Independent Canal Based Water Wor
Canal Based Water Supply Scheme Const of Brick Lining S/S tank, S/S Well for RW and CW, 1 MLD WTP Clear Water Tank Pumping Machinery Boundary Wall Pump Chamber 3 No Boosting Stations Distribution System and Rising Main for 3 No Villag
Laying of DI pipe 100 mm i/d and providing 92 No. new functional household tap connection , construction of IPB road and path , renovation of 2 No. pump chamber , PandF GI pipe 80 mm , earth filling around the boundary wall, P and F submersible cable
Laying of 100 mm and 150 mm i/d D.I. Pipe line, construction of 1 No Pump Chamber size 3.05 mtr x 3.66mtr, 60 mtr Boundary Wall, sluice valve chamber, providing and fixing of Functional household tap connection in village Moolthan and all other work
Construction of 4 no. brick masonry pump chamber of size 3.05 mtr. x 3.66 mtr., construction of brick masonry boundary wall, Laying of 100 mm i/d DI pipe line, construction of sluice valves chamber,1 No. UGT, providing and fixing of Functional water
Estimate for the replacement of old pumping machinery and repair of existing W/W structure i.e. UGT, Boosting Chamber and Boundary wall etc. at Head work near Village Banswa and B/S in SDE Office Campus of W/S Scheme Hodal Town Distt. Palwal.
7242 Mtr. 200mm, 696 Mtr. 250mm, 535 Mtr. 300mm SW pipe, 1 No. IPS complete, Rising Main 2900 Mtr. 150mm DI pipe, 542 No. Manholes, 15 KVA Transformer, 10 KVA DG Set, Pump Chamber (4.50 x 3.65) Mtr. Boundary wall- 122 Mtr. CC Path
Providing 1 X 7 2 MVAR Capacitor Bank alongwith allied Equipments and steel str at 132 KV Sub-Station Mudlana Providing lighting arrangements along with boundary wall of yard at 132 KV Sub-station Sector 3 Rohtak and Augmentation of 132 KV Sub-stati
Repair of 1 No. Brick linning S and S tank, Repair of 3 Nos. F.B., Repair of Pump Chamber, Rep. of Boundary Wall 580 mtr above DPC, const. of sluice valve Hodies and Replacement, providing, supply, erection, testing and commissioning of 2 Nos. for R/
Laying of 250mm i d rising main 1 No. S S Tank , 2 Nos. RCC Suction Scour Well , ,2 No. RCC Clear Water Tanks, 4 Nos. RCC Filter Beds , 1 No. Pump Chamber, Boundary Wall, const. of c.c. path , Exist. B Stn., Rising Main, FHTC
work of providing and laying of 450mm OD HDPE PN 10 pipe from Sector 13 to Sewerage disposal in Sector 37 and construction of pump house including providing and fixing of pumping machinery sump well and boundary wall etc in green belt sector 13 bgarh
Sirsa Town- Providing and laying of D.I. Rising Main from Canal to Main W/W, Renovation of S/S Tank, Re-construction of Boundary Wall, Repair of Structures at Main Water Works on Chattargarh Patti Road and Renovation of Mini-Sectt. W/W Sirsa, Distt.
Work of barbed wire fencing on boundary wall of SLDC Complex, Chd and of replacing of existing PVC flooring in control room/corridor/server room at SLDC Complex, Chd and of control rooms at 66KV, S/S, Chd and at 220KV S/S, DKT
Laying of 350 mm id RCC NP2 inlet channel, construction of 1 No. SS Tank of size 40x26.2.44 mtr., Renovation of 1 No. SS Tank, boundary wall, pump chamber, clear water tank and HLT, 3 No. filter bed, construction of IPB road and path, Construction
GORKHA Providing 1 No. New T W in place of failed T W and laying of DI pipeline and FHTC under Jal Jeevan Mission Repair of Staff quarter and Pump Chamber White Washing Painting Const of Boundary wall at village Gorkha Distt Kurukshetra and all
Laying of 100mm i/d and 150 mm i/d DI pipeline including 141 nos. Functional Household Tap Connections to household an 4 No. House hold tap connection for Govt Building, Construction of boundary wall with RCC pillar tubewell No. 1, renovation of exis
Construction of boundary wall of old age home site in Sector 32 Urban Estate Ambala Cantt Supply and laying of CC 1 4 8 RCC works 1 15 3 brick work and earth filling etc complete in all respect and all other works contingent thereto