Loading…
Loading…
8,333 results • Best match
Repairs and raising of compound wall, providing chain link mesh, Gate to Park in Rukmini estate near Over head tank in Ward No. 132, Jeedimetla, Quthbullapur Circle - 25, GHMC (Period of completion 2 months) (Reserved to Waddara / Sagara Communities only) 2nd call
Engaging of labours for cutting of jungle, bushes, trees and Construction of Compound wall at Lungi wale Galli 18-8-126/1 & Ameena Bai Galli 18-8-128/A/B graveyard in Abdul Raheem Sardhar Galli at Kanchanbagh Div-41 - Rs. 2.75 Lakhs
Development of grave yard (construction of compound wall Providing toilets water supply & electricity )at mudiraj sangam near singapur road at ward no 7. under 14th FC 2015-16.in W No 12 under 14th FC 2015-16 in Metpally Municipality. (2nd Call).
Construction of Burning Platform (3 Nos), Construction of compound wall and Drilling of 6 1/2 dia bore and fixing of 1 HP submersible motor pump set at SRSP Beside Grave Yard at Reddypuram Road in Div. No. 02 (Reserved for SC Community)
Cutting of scrub jungle and clearing bushes and white washing to compound wall in view of Diwali Festiva for the year 2025 at Amber Nagar grave yard and Anajaiah Nagar grave yard in Adikmet Ward, Division 15, Sec-bad Zone, GHMC (Rs. Lakh)
Jungle Cutting and white washing to compound wall of Takiya Bibi Peer Shah, Grave yard-Bagh-e-Lashkar Jung in Dabeerpura Div-30, Santosh Nagar circle-7, GHMC. Bit 2(left side)(Reserved for SC Contractors / Proprietorship Firms / Partnership Firms) Rs. 5.72 Lakhs
1). Repair and Renovation of wash rooms pipe lines, drainage lines, building pipelines and seepage issue of the building at ICAR-NBPGR, Rajendranagar, Hyderabad. 2). Providing and fixing Concertina Coil Fencing on the compound wall (back & IGMRI side) at NBPGR, Rajendranagar, Hyderabad.
Providing barbed wire fencing with precast RCC posts and MS gate to unprotected BSNL Repeater station No.3(BTS), and reconstruction of collapsed compound wall on two sides at BSNL Repeater station located at RS No. 46(BTS) under Mahabubnagar OA, MED
Providing of Y angle, barbed wire & Helical fencing to the road side compound wall and and providing of chain link mesh fencing for 220/132KV SS Shapurnagar and replacing of roofing sheets to the shed and providing flooring at TLC stores shapurnagar.
Jungle Cutting & whiite washing to compound wall of Grave yard at mama nek khadam, Beside Jawahar nagar community hall, St moses school and Dargah Syed Abbas Ali sahib in 39-Santosh Nagar in Santosh Nagar Circle-7, Charminar Zone, GHMC. Rs. 1.60 Lakhs
Construction of Compound Wall around the Open Place LP.No.72/97 (Opp.Poll No.22 and 105) at TNGO's colony in Ward No.9 of Jangaon under 14th Finance Commission Grants (This work is Reserved for SC, ST, Waddera Labour Societies and Individuals only)
Construction of Compound wall, providing of walking track and childrens play equipment to parks at P.no 116 & P.no.27 RK Layout in Ward No. 125, Gajularamaram, Gajularamaram Circle 26 GHMC (Park 1, Park 2, Park 3,Park 4 & Park 5)(3rd call)
Construction of Compound wall and SS flooring to avoid flood water entering in to temple at Bairava Maisamma Temple at Achaya nagar in 35-Gowlipura in Santosh Nagar Circle-7, CRZ, GHMC. (Reserved for SC Contractors / Proprietorship Firms / Partnership Firms) Rs. 4.08 Lakhs
Jungle Cutting and White Washing to compound wall of Graveyard at Entrance of Masjid Moiniya (Peeli Dargah) and Dr Yaseen Graveyard in 39-Santosh Nagar in Santosh Nagar Circle-7, CRZ, GHMC in view of Shab E Barath Festival 2021Rs.1.00 Lakhs
Replacement of damaged tandoor stone flooring with tile flooring & providing partitions at Estate department and providing Chain link mesh fencing around the vacant land at front side compound wall(outside) of epi-centre building at Kothagudem Corporate, Bhadradri Kothagudem District, Telangana State.
Jungle cutting and white washing to compound wall 1) Roshan Dil Takiya 2) Brahmanwadi 3) Masjid E Almas 4) Sonte Peer Dargah in 30-Dabeerpura in Santosh Nagar Circle-7, CRZ, GHMC. in view of Shab E Barath Festival 2022) Rs.2.54 Lakhs
Invited under earmarked works-Individuals and societies belonging to SC category are only eligible to participate "laying of CC road, construction of ladies toilet, raising of compound wall, providing cover slabs and other miscellaneous civil works at 220/132/33KV Moulali SS
Providing precast compound wall to open lands at Khaitalapur (V) KPHB Colony Kukatpally (M) M M District under Package No 3 under Juridiction of SEHC-I of Telangana Housing Board of Sy.No's 912 (P) 913 (P) 926 to 930 935 936 and 971
Providing GI chain link mesh to GHMC park from Plot No.26 of Huda enclave to the existing compound wall at Road No.70, Jubilee Hills Ward-95, Cir-18 (KZ) GHMC (Item No.2) 2nd RECALL (Reserved for SC LCCS societies /Contractors)
C/O NEW ANGANWADI CENTER WITH BABY TOILET ,ADULT TOILET,COMPOUND WALL,NUTRIGARDEN (POSHAN VATIKA) BALA PAINTINGS,ELECTRICITY & PLUMBING WORKS AND BOREWELL WITH MOTOR AT BESTHAGUDEM-I (V) IN RAMANUJAVARM SECTOR IN MANUGURU MANDAL, BHADRADRI KOTHAGUDEM DISTRICT,EST COST RS. 15.00 LAKHS
Painting of compound wall on arrangements of Diwali festival and All Souls day festival at Adarshnagar Hindhu Grave yard, Kharkhana gadda grave yard and Christian grave yard & Doctor Street SC grave yard (Two sides) in Div No.42 and 43 of MCK
Construction of compound wall , Providing of Gate and arch to open park space in Hastinapuri Colony of Ward 01, Kapra, Circle 01, Kapra , LB Nagar Zone, GHMC.(Reserved for Individual Waddera/Sagara Contractors/Proprietorship Firms / Partnership Firms/ Waddera/Sagara LCCS)(Rs.21.50 Lakhs)
Development of Dumping yard by constructing compound wall, compost yard construction, tank construction, bore point drilling and installation of motor and electrification to the site in devarakonda Municipality under 14th FCG 2018-19 Basic grant Reserved for SC/ST/Waddera & Sagara societies
Development of Hindu SC grave yards at Parsigutta by construction of compound wall in place of damaged ones, constructing ash storage room, providing new pathways and other maintenace works in Musheerabad Ward 86, Circle 15, Sec-bad Zone, GHMC (rs. 45.00 Lakh)
Laying Of Interlocking Precast Cement Concrete Blocks For Footpath Flooring From Beside Markfeed Compound Wall To Main Road Division No 16 Of Municipal Corporation, Karimnagar. (Old Division NO. 42 of MCK Reserved for Waddera Division Level LRS EST Cost of Rs. 4.00 Lakhs
Construction of Circle office building for SE/OMC/Khammam (G+2) and Construction of balance compound wall, protection wall and laying of CC Road in the switch yard and for circle office in the premises of 132/33KV SS Khammam in Khammam District.
Laying of CC Road from Mangali Vijay house Manohar Reddy house compound wall and Construction of Sullage drain with RCC NP-2 Pipes from Mangali Vijay house Ambati Jangaiah house in W.No. 11 in Shadnagar Municipality under Municipal General Funds 2018-19
Laying of CC platform, water harvesting pit at tankers filling point and construction of compound wall to damaged portion beside Mee-seva sulab complex and laying of impervious coat, repairs, painting to existing building at nakkalagutta GLSR premises in div no.48, GWMC
Maintenance of Traingular Bit Opp. Kalanjali opp. Control Room opp. GHMC Head Office Green Curtain Way Side Veiw Adarshnagar & Green Curtain from Durgamatha temple basheerbagh along with Nizam College compound wall and mahaboobia grils high school, gunfoundry in Cir-14 for 12 months
Jungle Cutting & whiite washing to compound wall Brahmanwadi, Sonte Peer Dargah, Ashraf Ali, Kotle Hassanullah(2No's) & H.No- 17-7-645 in 30-Dabeerpura in Santosh Nagar Circle-7, Charminar Zone, GHMC(Reserved for Sagara/ Waddara community Individuals and Societies) Rs. 2.08 Lakhs
Jungle cutting and white washing to compound wall of Graveyard from Dargah Burhane Shah Sahib to Bakshi ka Nal, in 39-Santosh Nagar in Santosh Nagar Circle-7, Charminar Zone, GHMC. (Reserved for SC Contractors / Proprietorship Firms / Partnership Firms) Rs. 3.60 Lakhs
Construction of Compound wall & laying of chain link fencing at theme park huda colony in ward No.19,Saroornagar C-05 ,GHMC. (Recall) (Reserved for Individual/ SC LCCS Contractors, Proprietaryship/ Partnerships.) as per G.O. MS No.59, I&CAD(Reforms) dept, dt:21.05.2018
Providing civic amenities of in view of DIWALI festival (2022) by clearing light jungle flush pointing white washing to compound wall debris lifting and painting to pathway in Devunikunta Graveyard under Vijaya Nagar Colony 73 Mehdipatnam Cir-12 Kz GHMC (Item No.1)
Jungle Cutting and white washing to compound wall of Graveyard at Razathul Hadis and Diamond Sweet Shop back side, opp Rein Bazar Chaman and opp Decaution Zam Zam in 37-Kurmaguda in Santosh Nagar Circle-7, Charminar Zone, GHMC Rs. 3.72 Lakhs
Jungle cutting and white washing to compound wall of Graveyard at Mama Nek Khadam, beside Jawahar Nagar Community Hall, St. Moses School and Dargah Syed Abbas Ali Sahib in 39-Santosh Nagar in Santosh Nagar Circle-7, Charminar Zone, GHMC. Rs. 2.00 Lakhs
Jungle Cutting & white washing to compound wall of Grave yard at Masjid Ambiya and Madina Masjid opposite side at Bhanu Nagar in 37-Kurmaguda in Santosh Nagar Circle-7, Charminar Zone, GHMC(Reserved for SC Contractors / Proprietorship Firms / Partnership Firms) Rs. 3.06 Lakhs
Clearing of Jungle cutting, bushes and painting to Graveyard compound wall on occasion of Shab-E-Meraj and Ramzan festival at Vinoba Nagar, Shaikpet, Cir-18(Jubilee Hills), (CZ), GHMC. (Item No.13) (Reserved for SC,ST & Wadder Labour co-operative Societies)
Jungle cutting and white washing to compound wall of Graveyard from Dargah Burhane Shah Sahab to Bakshi ka Nal, Electrical substation road (Dr Yaseen) in 39-Santosh Nagar, Santosh Nagar Circle-7, SZ, GHMC (in view of Shab E Bharat 18-19)
Jungle cutting and white washing to compound wall Almas (2 nos ) , Mashroof Ali Shah, Roshan Dil Takiya, 17-4-113/115(Imli), Syed sadath (17-7-512) in 30-Dabeerpura in Santosh Nagar Circle-7, Charminar Zone, GHMC (Recall) Rs. 2.50 Lakhs
Repair to office building and painting to office building and compound wall and water pipe line repair and toilets repair to office building and Repair to RO Plant room and Painting to RO plant Buidling at Thirumalagiri undrer AMC., Thirumalagiri of Suryapet District
Construction of District Police Office Building (Balance work), Main Gate, Security Room, Front Side Compound Wall to the Complex at Wanaparthy of Wanaparthy District. Sub work: Providing Cassette type Air Conditioning System (GF+FF) for DPO Building at Wanaparthy of Wanaparthy District. (STN)
Construction of compound wall to the open space adjacent to H.No.10-3-734/1,2 & 3 (Corresponding to LIGH 279/3RT, 280/3RT and 281/3RT) situated in 73-Vijay Nagar colony Division, Circle-12, KZ, GHMC (Re-call) (Item No.04)
CONSTRUCTION OF CONFERENCE HALL WITH SOLAR ENERGY INSTALLATIONS ON FIRST FLOOR, COMPOUND WALL AND CERTAIN REPAIRS TO TOILETS AND LEAKAGES AND PROVIDING CASSETTE TYHPE ACS, GYP BOARD FALSE CEILING TO CONFERENCE HALL AND CDERTAIN ELECTRICAL REPAIRS TO RUSA, RESOURCE CENTRE, NAMPALLY, HYDERABAD
Maintenance of triangular bit Opp: Kalanjali opp: GHMC Head Office, green curtains way side view Adharshnagar & green curtains from Durgamatha temple Basheerbagh along with Nizam college compound wall and mahaboobia girls high school, gunfoundry in Cir-14, KZ, GHMC for 12 months
Cutting of bushes and shrubs Clearing the Graveyards, and white washing to Compound Wall at 1. Idare e miliya graveyard 2.Padma nagar graveyard 3.Jaferia Grave yard 4.syed Mohammed Grave yard Old Malakpet , Div-26, Circle-6, GHMC. (Moosarambagh Circle-29)
Development of park by Constrution of compound wall to a) park near MIG 69, APHB Colony in Balaji Nagar b) park 1 and c) Park 3 park 3 at Power nagar in Balaji Nagar ward no.115 of GHMC, Moosapet Circle 23.
Construction of Compound wall for open space at Green Hills Colony in ward No.20 R.K.Puram of Saroor Nagar Circl-5,GHMC (Reserved for Individual/ ST LCCS Contractors, Proprietaryship/ Partnerships.) As per G.O. MS No.59, I&CAD(Reforms) dept, dt:21.05.2018
Providing chain link mesh along katcha nala from Ashok Nagar Main Road opp. Srinivasa Hotel along NFC compound wall to Nehru Nagar culvert in Mallapur Ward No.5, Mallapur of Kapra Circle-1, GHMC (Reserved for S.C and S.C Societies)(Rs.19.60 Lakhs)
Construction of Balance work of stilt floor, Compound wall, Providing Lift, Generator and Audio & Video system to Conference Hall of DCP Malakajgiri Office Complex of RR District-Sub work:Supply, Installation, Testing and Commissioning of 160KVA DG Set with AMF Panel to DCP Malakajgiri.
Construction of RCC Compound wall around the land admeasuring Ac.540.00 Gts in Sy.Nos 1024 to 1030, 1036 to 1042, 1066 to 1070, 1010/1 to 1010/15 situaed at Kukatpally (V&M), Medchal Malkajgiri District of Sri Udasin Mutt, Hussainialam, Hyderabad