Loading…
Loading…
5,458 results • Best match
SH Providing and laying 30mm thick bituminous concrete including profile correction layer, V-shape drain in Km 7.00 to 9.00
SH- Providing and laying 30 mm thick Bituminous Concrete laying with Paver Finisher in km 2/500 to 3/000
SH Providing and laying 30mm thick bituminous concrete including profile correction layer, V-shape drain in Km 15.00 to 16.780
(SH- P/L 30mm thick bituminous concrete in km. 0/0 to 1/0 and 1/0 to 2/0).
SH P/L 25mm thick bituminous concrete in km 0/0 to 1/0 and 2/0 to 3/500
(SH- P/L 30mm thick bituminous concrete in km. 0/0 to 1/0 and 1/0 to 1/500).
SH Providing and laying renewal coat by providing Bituminous concrete in Km 4/0 to Km7/500 including road marking
Providing and Laying BUSG for correction of surface Bituminous concrete in kilometer 6-0 to 9-0 and edge line
Providing and laying 25 mm thick Bituminous Concrete in between km. 0/00 to 1/00) under AMP 2024-25
Providing and laying30mm thick bituminous concrete pavement in Km 3/000 to 4/000 and 4/000 to 4/500
Providing and laying Tack coat and Bituminous Concrete in Km 0/0 to 1/0, 2/0 to 3/0
(SH- P/L 30mm thick bituminous concrete in km. 12/0 to 13/0 and 13/0 to 14/0).
Providing and Laying 30mm thick bituminous concrete in KM 0/0 to 1/0 and 1/0 to 2/0
Providing and laying of 25mm thick Bituminous Concrete in km 0/00 to 2/300) including 5 year Post DLP
SH Providing and laying renewal coat by providing Bituminous concrete in Km 4/0 to 7/0 including road marking
SH- Providing and laying 30 mm thick Bituminous Concrete laying with Paver Finisher in km 11/000 to 12/000
(SH- P/L 30mm thick bituminous concrete in km. 0/0 to 1/0 and 1/0 to 1/770).
SH P.L WBM G.III and 30mm thick bituminous concrete surfacing, missing Km. Stone, edge strip in Km. 12.000 to 15.250
SH- Providing and laying 30 mm thick Bituminous Concrete laying with Paver Finisher in km 1/000 to 1/410
P/L 30 mm thick Bituminous concrete at Km 6/00 to 7/00 and 8/380 to 8/580
(SH- P/L 30mm thick bituminous concrete in km. 0/0 to 1/0 and 1/0 to 1/890).
SH Providing and laying 30 mm bituminous concrete including profile correction in K.M. 4/00 to 9/00 (MDR-54)
P/L 30 mm thick bituminous concrete in km 102/00 to 110/00 including construction of road side drain
SH- Providing and laying 25 mm thick Bituminous Concrete laying with Paver Finisher in Km. 0/0 to 1/880
SH Providing and laying 30mm thick bituminous concrete including profile correction layer, V-shape drain in Km 6.00 to 8.300
P/L 30 MM Bituminous Concrete,Thermoplastic paint strip and construction of drain in km 7.00 to 9.00) (Village Road )
Providing and laying 30mm thick bituminous concrete, hot applied thermoplastic reflective paint strip in K.M. 0/0 to 1/0
Providing Annual Surfacing with 25mm Bituminous Concrete in Km. 4/00 to 5/00) (Under AMP 2025-26). (PMGSY Road
SH- Providing and laying 30 mm thick Bituminous Concrete laying with Paver Finisher in km 1/000 to 2/000
Providing and laying Bituminous Concrete 25mm thick and thermoplastic road marking strip at RD 0/00 to 1/00 (HP0306VR00192)
SH- Providing and laying 30 mm thick Bituminous Concrete laying with Paver Finisher in km 0/000 to 2/000
SH- Providing and laying 30 mm thick Bituminous Concrete laying with Paver Finisher in km 1/000 to 1/500
SH- Providing and laying 25 mm thick Bituminous Concrete laying with Paver Finsiher in Km. 1/307 to 4/500
Providing and laying 30mm single layer bituminous concrete (HP0404NC002316112) km. 1/0 to 2/0, 2/0 to 2/200
SH- Providing and laying 30 mm thick Bituminous Concrete laying with Paver Finisher in km 0/000 to 1/600
SH P.L G.III and 30mm thick bituminous concrete surfacing, edge stip in Km. 36.000 to 38.000 and 41.000 to 43.000
SH- Providing and laying 30 mm thick Bituminous Concrete laying with Paver Finisher in km 0/000 to 1/000
Providing and Laying GSB, G-II, G-III, 30 mm thick Bituminous Concrete in Km 1/255 to 3/025
SH P L Bituminous concrete 25mm thick in Km 9 0 to 10 0 under incentive post maintenance plan PMGSY
Providing and laying 25mm thick bituminous concrete 1/0 to 1/700 and 2/0 to 2/510(VR-037).
SH- Providing and laying 30 mm thick Bituminous Concrete laying with Paver Finisher in km 0/000 to 3/000
SH- Providing and laying 30 mm thick Bituminous Concrete laying with Paver Finisher in km 0/000 to 0/850
SH- Providing and laying 30 mm thick Bituminous Concrete laying with Paver Finisher in km 0/000 to 0/930
SH- Providing and laying 30 mm thick Bituminous Concrete laying with Paver Finisher in km 6/000 to 9/000
Providing and Laying G-II, Tack Coat and 30 mm thick Bituminous concrete at Km 0/00 to 1/00)
SH- Providing and laying 30 mm thick Bituminous Concrete laying with Paver Finisher in km 2/000 to 2/680
Providing and laying Hume piep culovert G-I G-II and Bituminous Concrete in km. 0/00 to 1/00
Providing and laying 30 mm thick bituminous concrete in km. 5/00 to 6/00, 6/00 to 7/00
Providing and Laying G III Primer Coat Tach Coat 25mm thick Bituminous Concrete in Km 0/000 to 3/910
Providing and laying bituminous concrete 30mm thick at various RD providing paved shoulders and thermoplastic road marking strip) Under OTMNP