Loading…
Loading…
5,458 results • Best match
Providing and laying built up spray grout layers for pot holes 30mm thick bituminous concrete in Km 4/500 to 06/210
Providing and Laying built-up-spray grout,Tack Coat and 30 mm thick Bituminous concrete at Km 0/00 to 1/00
P/L 30mm thick bituminous concrete in kms 0/0 to 2/150 I/c paver block G-III in pot holes.
P/L 30mm thick bituminous concrete in kms 0/0 to 0/500 I/c paver block, G-III in Pot Holes
P/L 30mm thick bituminous concrete in kms 0/0 to 0/750 I/c paver block G-III in pot holes.
Providing and laying built up spray grout layers for pot holes 30mm thick bituminous concrete in Km 0/0 to 1/500)
Providing and laying 25 mm thick Bituminous Concrete in between km. 7/00 to 10/00 ) under PMGSY ROADS AMP 2024-25
Providing and laying built-up spray grout layer for pot holes, 30mm thick bituminous concrete in Km 0/00 to 1/780
Providing and laying built up spray grout layers for pot holes, 30mm thick bituminous concrete in km 10/00 to 11/500
Providing and laying Tack coat and Bituminous Concrete in Km. 0/0 to 1/0 and Km 2/0 to 3/0
P/L 25mm thick Bituminous Concrete with Paver Finisher in KM 0/0 to 1/00 and 1/00 to 2/00
Providing and laying 25 mm thick Bituminous Concrete in between km. 3/00 to 7/00) ADDL. KMS under AMP 2024-25
Providing and laying built up spray grout layers for pot holes 30mm thick bituminous concrete in Km 1/500 to 3/000
Providing and laying built-up spray grout layer for pot holes, 30mm thick bituminous concrete in Km 4/500 to 6/00
Providing and laying 30mm single layer bituminous concrete (HP0404VR009415301) in km. 0/0 to 1/0 and 1/0 to 2/0
P/L 30mm thick bituminous concrete in km 10/0 to 11/0 I/c paver block, G-III in pot holes.
P/L 30mm thick bituminous concrete in kms 0/0 to 1/0 I/c paver block, G-III in pot holes
Providing and laying 30mm single layer bituminous concrete (HP0404VR012516189) in km.0/0 to 1/0 and 1/0 to 1/960
P/L 30mm thick bituminous concrete with paver finisher in Km. 3/520 to 5/0 and 8/0 to 10/800
P/L 30mm thick bituminous concrete in kms 0/0 to 1/0 I/c paver block G-III in pot holes.
Providing and laying built up spray grout layers for pot holes 30mm thick bituminous concrete in Km 3/00 to 4/500)
P/L 25mm thick Bituminous Concrete with Paver Finisher in KM 1/00 to 2/00 and 2/00 to 2/100
Periodical Maintenance i/c P/L 25 mm thick bituminous concrete and thermoplastic paint lines between km. 0/00 to 1/750).
Providing and laying built up spray grout layer for pot holes, 30mm thick bituminous concrete in km 35/000 to 36/00
P/L 30mm thick bituminous concrete in kms 0/0 to 0/380 I/c paver block G-III in pot holes.
Providing and Laying Bituminous concrete in Km.113/0 to 116/0 and 122/0 to 126/300 Under MDR-84 road.
Providing and laying 30mm single layer bituminous concrete (HP0404VR0226001-02) km. 0/0 to 1/0 and 1/0 to 2/0
Providing and laying built-up spray grout layer for pot holes, 30mm thick bituminous concrete in Km 6/00 to 7/00
C/O R/wall, embankment filling, P/L GSB, WMM, BM, 30mm thick bituminous concrete in km 4/210 to 4/425).
Providing and laying 30mm single layer bituminous concrete (HP0404VR012515302) in km.1/0 to 2/0 and 2/0 to 3/0
Providing and laying built-up spray grout layer for pot holes, 30mm thick bituminous concrete in Km 0/00 to 1/780
Providing and laying built-up spray gout, Tack coat, Bituminous Concrete 30mm thick and Thermoplastic Strip in Km 00 to 1/650).
Providing and laying 30mm thick bituminous concrete, PCC drain in K.M. 5/0 to 6/0 and 6/0 to 7/0
P/L 30mm thick bituminous concrete in kms 0/0 to 0/800 I/c paver block, G-III in pot holes
Providing and laying built-up spray grout layer for pot holes, 30mm thick bituminous concrete in Km 9/00 to 10/00
Loosening, GSB and WBM III primer Coat Tack Coat Bituminous concrete at various RD s at km 40 0 to 76 0
Providing and Laying G-II, Tack Coat primer coat and 30 mm thick Bituminous concrete at Km 2/300 to 3/300)
Providing and Laying built-up-spray grout,Tack Coat and 30 mm thick Bituminous concrete at Km 2/00 to 3/00
Providing and laying built up spray grout layer for pot holes, 30mm thick bituminous concrete in km 1/00 to 2/00
P/L Bituminous concrete in Km. 23/0 to 25/0 35/0 to 36/0 and 40/0 to 41/0
Providing and laying 25 mm thick Bituminous Concrete in between km. 1/00 to 2/130 ) under ADDL. KMS. AMP 2024-25
SH Providing and laying renewal coat by proving 30mm thick bituminous concrete and road marking in km 64/0 to 65/320
SH providing and laying renewal coat by providing 30mm thick bituminous concrete and road marking in km 4/0 to 4/650
P/L 30mm thick bituminous concrete in kms 0/0 to 0/950 I/c paver block, G-III in pot holes.
P/L 25mm thick Bituminous Concrete with Paver Finisher in KM 1/00 to 2/00 and 2/00 to 3/00
SH Providing and laying renewal coat with 30mm thick bituminous concrete, P/L edge lines at RD 0/0 to 0/786.
Providing and laying built-up spray grout layer for pot holes, 30mm thick bituminous concrete in Km 5/00 to 6/00
P/L 30mm thick bituminous concrete in kms 10/500 to 11/500 I/c paver block, G-III in pot holes
P/L 30mm thick bituminous concrete in kms 0/0 to 0/300 I/c paver block, G-III in pot holes.
Providing and laying built-up spray grout layer for pot holes, 30mm thick bituminous concrete in Km 0/00 to 1/780