Loading…
Loading…
5,458 results • Best match
Providing and Laying 30mm thick Bituminous concrete with paver finisher Km 0/000 to 0/500 and 0/500 to 1/000).
Providing and Laying G-I,G-II in extended protion and 25mm thick bituminous concrete in km. 0/00 to 0/900
(SH- Providing and laying WBM G-III and 25mm thick bituminous concrete surfacing in Km. 10.000 to 11.000 and 11.000 to 12.000).
P/L GSB, WMM and 25mm thick Bituminous Concrete in Km 0/00 to 0/360 and 0/448 to 0/600
Providing and laying built up spray grout layers for pot holes, 30mm thick bituminous concrete in km 4/100 to 05/600
P/L 30mm thick Bituminous Concrete with Paver Finisher in KM 11/00 to 12/00 and 12/00 to 13/00
SH Providing and laying renewal coat by providing 30mm thick Bituminous concrete in Km0/0 to Km4/0 along with road marking
Providing and laying built-up spray grout layer for pot holes, 30mm thick bituminous concrete in Km 7/500 to 9/00
Providing and laying 30mm thick bituminous concrete, PCC drain in K.M. 0/0 to 1/0 and 1/0 to 2/0
P/L 30mm thick bituminous concrete in kms 0/0 to 0/800 I/c paver block, G-III in pot holes.
Providing and laying built up spray grout layers for pot holes 30mm thick bituminous concrete in Km 0/00 to 1/500
Providing and laying built up spray grout layer for pot holes, 30mm thick bituminous concrete in km 09/000 to 10/00
Providing and laying 30mm single layer bituminous concrete (HP0404VR006615201-202) km. 0/0 to 1/0 and 1/0 to 1/250
SH Providing and laying 30mm thick bituminous concrete including profile correction layer, V-shape drain in Km 13/600 to 15/0.
SH Providing and laying renewal coat by proving 30mm thick bituminous concrete and road marking in km 0/0 to 2/0
Providing and laying built-up spray grout layer for pot holes, 30mm thick bituminous concrete in Km 5/00 to 6/00
Providing and laying 25 mm thick Bituminous Concrete in between km. 2/00 to 3/00 ) ADDL. KMS under AMP 2024-25
Providing and laying 30mm single layer bituminous concrete (HP0404VR05615303) in km. 2/0 to 3/0 and 3/0 to 4/0
P/L 30mm thick bituminous concrete in km 0/0 to 1/0 I/c paver block, G-III in pot holes.
P/L 30mm thick Bituminous concrete in kms 9/500 to 10/500 I/c paver block, G-III in pot holes
Providing and laying built up spray grout layers for pot holes 30mm thick bituminous concrete in Km 3/000 to 4/500
PROVIDING AND LAYING TACK COAT AND BITUMINOUS CONCRETE BETWEEN KM 84/0 TO 86/0 INCLUDING PROFILE CORRECTION ) (YEAR 2022-23 MDR)
Providing and laying 25 mm thick Bituminous Concrete in between km. 0/00 to 1/000) ADDL. KMS under AMP 2024-25
Providing and laying 30mm single layer bituminous concrete (HP0404VR010015301-302 km. 0/0 to 1/0 and 1/0 to 1/150
P/L 30mm thick bituminous concrete in kms 0/0 to 1/800 I/c paver block, G-III in pot holes.
Providing and laying renewal coat by providing 25mm thick Bituminous concrete and thermoplastic edge line in km. 10/00 to 13/00
Providing and laying built up spray grout layer for pot holes, 30mm thick bituminous concrete in km 0/00 to 1/00
SH Providing and laying renewal coat by providing 30mm thick bituminous concrete and road marking in km 2/0 to 4/0
P/L 30mm thick bituminous concrete in kms 0/0 to 2/0 I/c paver block, G-III in pot holes.
Providing and laying built up spray grout layer for pot holes, 30mm thick bituminous concrete in km 0/500 to 2/00
P/L 30mm thick bituminous concrete in kms 0/0 to 2/0 I/c paver block, G-III in pot holes.
Providing and laying built-up spray grout layer for pot holes, 30mm thick bituminous concrete in Km 0/00 to 1/00)
Providing and laying 30mm thick Bituminous Concrete with Paver Finisher on Km 0/00 to 1/00 , 1/00 to 2/00).
SH- Providing Renewal coat by 30 mm thick Bituminous concrete in km 0/00 to 2/00 ) AMP 2022-23 (VILLAGE ROAD)
SH Providing and laying renewal coat by providing 30mm thick Bituminous concrete in Km 1/500 to 3/330 including road marking
Providing and laying 30mm single layer bituminous concrete (HP0404VR007815101-103) km. 0/0 to 1/0 and 1/300 to 2/0
P/L 30mm thick bituminous concrete in kms 0/800 to 1/500 I/c paver block, G-III in pot holes.
Providing and laying 30mm single layer bituminous concrete (HP0404VR012415301-302) km. 0/0 to 1/0 and 1/0 to 2/0
Providing and laying built up spray grout layers for pot holes 30mm thick bituminous concrete in Km 1/500 to 3/00)
P/L 30mm thick bituminous concrete in kms 1/0 to 1/600 I/c paver block, G-III in pot holes
Providing and laying BUSG for correction layer, bituminous concrete in Km0-0 to 3-0 and construction of PCC Hill side drain
P/L 30mm thick Bituminous Concrete on Gutkar Behna Tikkar Malwana Road Km 0/0 to 2/380) (HP0810VR007231101 to HP0810VR007231102 (MDR).
SH- Providing renewal coat by 30 mm thick bituminous concrete in between km. 0/00 to 2/00 for AMP 2022-23.
P/L 30mm thick bituminous concrete in kms 0/0 to 0/500 I/c paver block, G-III in pot holes
Providing and laying renewal coat by providing 25mm thick Bituminous concrete and thermoplastic edge line in km. 0/0 to 2/00
Providing and laying built-up spray grout, bituminous concrete in Km. 0/000 to 1/000 and 0/00 to 2/000)
Providing and Laying G-III 53to22.4mm BUSG for correction layer Bituminous Concrete in kilometer 0-0 to 3-0 and edge line
P/L 30mm thick bituminous concrete in kms 0/0 to 0/525 I/c paver block, G-III in pot holes.
Periodical Maintenance i/c P/L 25 mm thick bituminous concrete and thermoplastic paint lines between km. 0/00 to 1/645).
Periodical Maintenance i/c P/L 25 mm thick bituminous concrete and thermoplastic paint line between km. 0/00 to 8/100).