Loading…
Loading…
3,258 results • Best match
Hariparvat Zone, Ward No. 28 (Veer Nagar) Road construction work using hot-mix asphalt, extending from the Veer Nagar culvert, passing by Ajay Nath Sharma house and Gautam Ji house, up to Rahul Malik house.
Stone Work and Labour Work for Laying of Mix at site received from Dept. Hot Mix Plant Panwaria for Renewal / Repair work of different Roads under the jurisdiction of AE-3rd in F.Y. 2026-27.
1. Ward 14 me Mukesh ke makaan se Pabarsaa road tanki ke saamne Nagar Panchyat ki dukaan tak hot mix ka karya aur side patari par ISI rubber moleded CC interlocking tiles ka nirmaan karya
Road construction work by Hot Mix Plant in Ward 60, Phoolbagh Colony, Lane No. 01, M.L. Jewellers and 02, Nehru Nagar Lane No. 1.5, 3 and Lane No. 5 and the lanes connected to it.
Collection of Grit at Dept. Hot Mix Plant Bisauli for Renewal of Gram Nagla Barah to Sarkari Godown hokar Islamnnagar Chandausi Marg par Hajari Baba tak Link Road Under General Repair in Year 2025-26
Widening and strengthening work in 02 Lanes of Ghatampur to Sadh road (ODR) from Chainage 0.000 to Chainage 14.000 and from Chainage 0.000 to Chainage 0.900 in Development Block Bhitargaon Road (By Hot Mix Plant)
Collection of Grit and Dust at Dept. Hot Mix Plant for Renewal of Shahbad Bisauli Kachhla Gangaghat Road SH-109 Km 23 24 33 35 36 37 39 40 and 41 in Year 2023-24
Special Repair of Kaiserganj Huzoorpur Payagpur EIkauna SH 157 KE ARJUNPUR CHAURAHE SE GANGWAL VISHESHWARGANJ NETHIYA HOTE HUE BFA ODR Road Km13 150 in Financial Year 2025-26.Vidhan Sabha Payagpur With Hot Mix Plant
Renewal work with General Repair by Hot Mix Plant and Machinary of Rest Urban portion of NH-28 (Kalesar to Jagdishpur road) (Urban road) km 21(600), 22,23,24,25,26,27,28,29(150) Length 7.750 km LOT 2/29
Renewal work with Annual Repair from PC and type-C seal coat from hot mix plant and paver finishers(with 8 percent plastic waste) at Km 2, 3(915) of Parasai Bachhouni Link road (VR).
Stone Work and Labour Work for Laying of Mix at site received from Dept. Hot Mix Plant Panwaria for Renewal / Repair work of different Roads under the jurisdiction of AE-4th in F.Y. 2026-27.
Renewal Work of Harduaganj to Jalali Road (ODR) KM-1(400), 2, 3(775), 4(980), 5, 6(665), 7(850), 8, 9, 10(950), 11(825), 12(975), 13(750) (By Hot Mix Plant)
REPAIRING OF PATCH WORK THROUGH HOT MIX IN DELHI GATE SITUATED GOVARDHAN HOTEL TO NAWAL KISHORE TIRAHA , CHURCH ROAD , STATE BANK OF INDIA A.T.M TO R.B.S COLLEGE SR NO 94 HARIPARWAT ZONE SR NO 94
Renewal of Sagra Rajvaha Kadar Beer Baba to Babooganj Via Dubey ka purwa Shitalmau, Laloopur, mathaha, Itaila, Pure Noti, Madipur Bhadrikala Road (Length 7.500 Km) (O.D.R.) (Year 2023-24) P.C. By Hot Mix Plant (5)
Stone Work and Labour Work for Laying of Mix at site received from Dept. Hot Mix Plant Panwaria for Renewal / Repair work of different Roads under the jurisdiction of AE-2nd in F.Y. 2026-27.
Special Repair Work Of Bhagadiya Chaurahe To Rajanwa Ssb Chauki Link Road In Km. 1 To 5 Cc And Pc Work With Cc Drain In Disrict Bahraich Using Departmental Hot Mix Plant (Vidhan Sabha-Balha)
Stone Work and Labour Work for Laying of Mix at site received from Dept. Hot Mix Plant Panwaria for Renewal / Repair work of different Roads under the jurisdiction of AE-1st in F.Y. 2026-27.
Renewal of Kaiserganj Huzoorpur Payagpur Ikauna Road (SH-157) to Bahraich Faizabad Azamgarh Road via Arjunpur Chauraha to Gangwal Road (O.D.R.) Km.-1 to 4(250) in Financial Year 2024-25. (With Hot Mix Plant)
CONSTRUCTION OF BITUMINOUS ROAD FROM KM 12.000 TO 15.350 OF RAMNAGAR THUTHIBARI BUND IN DISTRICT- MAHARAJGANJ.
Upgradation of existing balance portion of bituminous road to Cement Concrete road at FSD Chandari, Kanpur
Under District Hardoi, Construction of Bituminous Road on Anna to Sura Harpalpur Road Lot No 10
Construction of internal bituminous road from gate No. 1 to 2 at ICAR Langol Farm Imphal.
Widening of Bituminous road and construction of drain work in C.B.Ganj Industrial area in distt. Bareilly
Const. of Bituminous Road from Sikandarpur link road to Lalpur Fatak Nahar puliya. Lot No 2
Patch Repair Work of bituminous Road On Karahi Dy. KM 1.220 To KM 5.200 (Left Bank)
Patch Repair Work of bituminous Road On Pakdi Dy. KM 10.700 To KM 13.200 (Left Bank)
Supply of grit of all sizes at Departmental Hot Mix Plant Simaria for Renewal/Repair works on different roads in area of legislative Assembly Bilaspur under the financial year 24-25. roads in area of legislative Assembly Swar under the financial
From Girand Rathores house in the village Tiliyanpurwa a CC road towards the main road blacktop and a drain as needed
Construction of Bitumen Road on Left Bank of Dahirpur Dy. From Km. 0.000 to km. 4.785 in Distt. Bijnor. Lot-02 (Retender)
Renovation (Bitumen Road) work on the service road of the canal from km 32.000 to km 34.450 of the Mant Branch Canal
Renovation of Bitumen road on barawaripur dy Dy service Road (Right Bank) From km. 10.900 to km 11.400 km 12.800 to 13.500
SPECIAL REPAIR OF ROAD AT ZONE 6 AND BITUMEN ROAD AT BLDG NO P1, ZONE 7 AT BABINA CANTT UNDER GE BABINA
CA NO. CWE BLY /GE(W)/68 OF 2021-2022 SPECIAL REPAIRS TO BITUMINOUS ROAD FROM ASHA SCHOOL TO BI CHOWK AND INTERNAL ROAD OF MH AND BITUMINOUS ROAD OF FAFA AND LOKHART LINES UNDER GE (WEST) BAREILLY
Ward-35, Shambhunagar, from Mahendra Guptas house to Surendra Gupta and Vinay Agarwal to S.N. Mittal and road improvement work by bituminous concrete in subsidiary lanes.
Strengthening of Road (Providing and laying Bituminous Concrete and CC Pavement on internal Road and C/o Kitchen shade in E.W.S. (Janta Flat) Sector-71), Noida
Road improvement work by bituminous concrete from Ashok Guptas house in Shambhunagar, ward-35, to Siddharth Jain and Rakesh Maheshwari to Subhash Garg and subsidiary lanes.
Providing and laying 30mm Bituminous Concrete in Km.116, 117, 131 AND 132 of NH-227A in the State of Uttar Pradesh (Renewal work under O.R.)
Renovation work including routine repairs using Bituminous Concrete BC on the Firozabad Shikohabad Mainpuri State Highway at Km 22 300 23 800 24 400 and 25
Renewal work with General repair of Doharia to Bhandaro link road km-1 2 3 by Hot Mix Plant under Rajya Sadak nidhi yojna in Gorakhpur District in Financial year 2022-23 (Lot no-02/06)
Supply of stone ballast, compaction and laying of Mix from Dept. Hot Mix Plant by Labour for Pot Holes/Patch Repair of different roads in block Milak/Bilaspur in the year 2022-23 in Distt. Rampur
Supply of stone grit/ballast (13.2/11.2/6.7mm/Stone Dust) at Hot Mix Plant Panwaria and Labour Work for laying of mix from HMP for Renewal/ Special Repair of roads in block Shahbad in 2022-23
Renewal work by B.C. Upgrade work with hot mix plant In Aligarh Raya Mathura Road (S.H.- 80) in Km. 4 (300), 5 (475), 6, 7, 8 (800), 11, 12, 13, and 14 (800) in Aligarh district.
WARD NO 33 ME ASHIRVAD MEDICAL SE RAMDAS VISHWAKARMA KE GHAR TAK HOT MIX PLANT SE SADAK INTERLOCKING PATARI WA NALI MARAMMAT KARYA TATHA PAPPU CHAY SE SHRAM VIBHAG OFFICE KE PASS TAK SADAK NAVINIKARAN KARYA.
REPAIRING OF PATCH WORK THROUGH HOT MIX ON ROAD IN AWAS VIKAS COLONY SEC-7 IN FRONT OF SHIVALIK SCHOOL , KARKUNJ CHOURAHA TO JAIN TEMPLE ROAD , KELA DEVI CHOURAHA TO JAIN TEMPLE HARI PARWAT ZONE-4
Work of interlocking tiles and drain repair work on the road from Shanidev Temple to Mayur Vihar Gate through hot mix plot in Ward 04 E Block and on the side plate till Puneet jis house.
Ward number 42 Maharana Pratap Nagar Mein lagn Palace se Durga Kunj Singh Nivas hari bhavan se Hote hue Transformer Tak CC Sadak aur hot mix plant dwara Sadak Nirman aur RCC Nali ka Nirman Karya
ward number 04 madan mohan malviy nagar me rudra butik se siwam hotal hote huye pramod shukla ke makan tak hot mix plant dwara sadak ka sudhar tatha dono taraf side patari par interlocking ka kary
Construction Work Of Newada-Khasha-Tamachpur In Km. 5 To Maingla Link Road In Km. 2 To Right Chandanpur Maingla (Rajaswa Gram Maingla) Link Road In District Bahraich (Vidhan Sabha- Matera) Using Dept. Hot Mix Plant
Supply of stone grit/ballast (13.2/11.2/6.7mm/Stone Dust) at Hot Mix Plant Panwaria and Labour Work for laying of mix from HMP for Renewal of NH-24 Dhaneli Poorvi to Patia Road via Bhopatpur.
Road work by hot mix plant from Shastri Nagar sec-2 to house no. 23/2, 141/2, 98/2, 103/2, 111/2 and in front lanes of house no. 30/2 in ward 53.