Loading…
Loading…
14,646 results • Best match
Provisions for mobilization soil investigation of 3 nos of boreholes with an average depth of 60 m for oneborehole and 40m depth for2boreholes in all class of soil 3boreholes with 1msoft rock 1mhard rock SPT and collection of soil for lab test
Provisions in the estimate for soil investigation details of 3 nos of boreholes with an average depth of 57 m in all class of soil 3 boreholes with 1 m for soft rock 1m for hard rock conduction of SPT and collection of soil samples for lab test
PCC, RCC, Random Rubble Masonry Solid Block Masonry, Plastering, steel windows and doors , Grill Works, door frame and 30 mm shutter of Solid PVC, Aluminium Works, Tile, Putty, Painting, Railing, Interlock plumbing and electrical
Provisions are providing access to site mobilization of tools and plants soil investigation details of 3 nos of boreholes with depth of 20m in all class of soil soft rock hard rock collecting DS conducting SPTand collectionof soil samples for labtest
PCC, RCC, Random Rubble Masonry, Solid Block Masonry, Plastering, steel windows and doors , Grill Works, factory made door frame and 30 mm shutter of Solid PVC, Aluminium Works, Tile, Putty, Painting, Railing, Interlock, Plumbing and electrical
Building is of G plus 2. The Building proposed is of RCC framed structure . The super structure is proposed with laterite masonry in cement mortar
PCC RCC Random Rubble Masonry Solid Block Masonry Plastering steel windows and doors Grill door frame and 30 mm shutter of Solid PVC Aluminium Tile Putty Painting Railing Interlock plumbing and Electrical network and Furniture
PCC, RCC, Random Rubble Masonry, Solid Block Masonry, Plastering, steel windows and doors , Grill Works, Providing door frame and 30 mm shutter of Solid PVC, Aluminium Works, Tile, Putty, Painting, Railing, Interlock plumbing and electrical works
PCC, RCC, Random Rubble Masonry, Solid Block Masonry, Plastering, steel windows and doors , Grill Works, factory made door frame and 30 mm shutter of Solid PVC, Aluminium Works, Tile, Putty, Painting, Railing, Interlock, Plumbing and electrical
New building works
PMJVK 2018-19 Construction of working Womens Hostel building in Edamulackal GP
Construction of compound wall on the south west side of Administrative building compound Kalpeta
Re-E-Tender for Construction of Room in the Second Fllor of Administrative Building
REPLACEMENT OF OLD ELECTRICAL FITTING IN ADMINISTRATIVE BUILDING CR-63 AT CRYO,LPSC VALIAMALA
NABARD RIDF - XXVII - Additional Infrastructural facilities at Chellanam Fishing Harbour- Construction of Administrative Building
WEST KALLADA GP SMART ANGANWADI BUILDING CONSTRUCTION ,ANGANWADI NO 48-SMART ANGANWADI BUILDING CONSTRUCTION ,ANGANWADI
Design, Supply, Installation and Commissioning of 10kWp Grid Connected SPV Power Plant at Elavanchery Gramapanchayath Office Building, Palakkad.
CONSTRUCTION OF RESIDENTIAL BUILDING UNDER THE REHABILITATION PROIECT
PHC NEW BUILDING COMPLETION
MCF New Building Electrification
45/2022-23 VETERINARY HOSPITAL BUILDING MAINTENANCE,CHENNEERKKARA GP
Annual Plan-Kannur DP- PROJ NO-13/2025- CONSTRUCTION OF BUILDING FOR GHSS CHITTARIPARAMBA IN CHITTARIPARAMBA GP-General Civil Work(Re-tender)
Special Repairs And Maintenance Of Deep Bhavan Gandhi Nager, Kadavanthra, Kochi
Electronics Works at Additional Floor of Pareeksha Bhavan -SITC of LAN
GENERAL-Urgent Special Repair to APP Office Building for Providing Mediation Center at Munsiff Magistrate Court, Payyoli.-Urgent Special Repair-General Electrical Work
Name of Work S. BATHERY BLOCK PANCHAYATH 2021-22 (CFC-PRO.NO.123) CONSTRUCTION OF OFFICE BUILDING FOR BLOCK PANCHAYATH Asst.Exe.Engineer Asst.Engineer Rs.1235000
Building Work
Construction of Entrance Gate Compound wall and Road at Govt Pratheeksha bhavan Thavanur Malappuram District
PWD Roads Section Office Building - Maintenance of PWD Roads Section Office Building, Nileshwaram
Annual Plan-Kannur DP PROJ NO. 22/24-25 CONSTRUCTION OF BUILDING FOR GHSS KUTTYERI IN PARIYARAM GP- General Civil Work
Annual Plan-Kannur DP - Project No. 17/2024- 25-Construction of Building for GHSS Koyyam in Chengalayi GP -General Civil Work
Annual Plan-Kannur DP - Project No. 20/2024- 25-Construction of Building for GHSS Kurumathur in Kurumathur GP -General Civil Work
LAC-ADS 2018-19 Kuthuparamba LAC Construction of building for Moozhivayal Anganvadi (Center No 89) in Pattiam GP General Civil Work
Building Construction
BUILDING CONSTRUCTION
Electrification of operation theatre in veterinary hospital building
114/25 Veterinary Hospital Building Renovation Ward 12
RAJAKKAD G P - AYURVEDA HOSPITAL BUILDING (89/20)
Pro No 602/27-GENERAL HOSPITAL BUILDING MAINTANANCE
LAC-ADS-2018-19-IRINJALAKUDA LA- CONSTRUCTION OF BUILDING FOR KSEB NO.2.SECTION IN IRINJALAKUDA MUNCIPALITY
Construction of Building
01/2020/21/MLA SDF / CONSTRUCTION OF ANGANWADI BUILDING AT MOUNT 12 WARD
Wayanad Development Package-Gov Polytechnic college Meppadi- Retaining wall- Construction retaining wall at rear side of girls hostel building and workshop building for Govt.polytechnic college Meppadi-General Civil Work -1
Building Construction (Multi Year Project)
Design, Supply, Installation and Commissioning of 8kWp Grid Connected SPV Power Plants at Meenangadi Grama Panchayat Building, Wayanad.
GENERAL-School building-Construction of the school building for Govt.Welfare L P School Cheruvakkara-General Civil Work
Pro No_SO268/23 Construction of Anganwadi building in LPS Compound Anamugham ward
DEPOSIT-Construction of Class room and Office building for Co-operative Training centre Karani Wayanad-Co-operative Training centre Karani Wayanad-Electrification-General Electrical Work