Loading…
Loading…
3,174 results • Best match
Construction of AWC building proposed to be constructed in convergence mode with MGNREGA 2016,Malda. In Various GP under Manikchak Dev. Block, Malda Construction materials supply Only.
Construction of AWC building proposed to be constructed in convergence mode with MGNREGA 2016,Malda. In Various GP under Manikchak Dev. Block, Malda Construction materials supply Only.
Construction of AWC building proposed to be constructed in convergence mode with MGNREGA 2016,Malda. In Various GP under Manikchak Dev. Block, Malda Construction materials supply Only.
Construction of AWC building proposed to be constructed in convergence mode with MGNREGA 2016,Malda. In Various GP under Manikchak Dev. Block, Malda Construction materials supply Only.
Construction of AWC building proposed to be constructed in convergence mode with MGNREGA 2016,Malda. In Various GP under Manikchak Dev. Block, Malda Construction materials supply Only.
Construction of AWC building proposed to be constructed in convergence mode with MGNREGA 2016,Malda. In Various GP under Manikchak Dev. Block, Malda Construction materials supply Only.
Construction of AWC building proposed to be constructed in convergence mode with MGNREGA 2016,Malda. In Various GP under Manikchak Dev. Block, Malda Construction materials supply Only.
Construction of AWC building proposed to be constructed in convergence mode with MGNREGA 2016,Malda. In Various GP under Manikchak Dev. Block, Malda Construction materials supply Only.
Construction of AWC building proposed to be constructed in convergence mode with MGNREGA 2016,Malda. In Various GP under Manikchak Dev. Block, Malda Construction materials supply Only.
Construction of AWC building proposed to be constructed in convergence mode with MGNREGA 2016,Malda. In Various GP under Manikchak Dev. Block, Malda Construction materials supply Only.
Construction of Moorum Inspection Path on canal bank from Ch. 1590 to 1709 (3.63 K.M) and from Ch. 1876 to 1939 (1.92 K.M) including renovation and improvement of existing Inspection Path from ch. 1532 to 1590 (1.76 K.M) of Panagarh Branch Canal
Bitra Health Centre Road from 0.00 km to 2.10 km for restoration of flank by Jhama metal with moorum and protection of flank by ballah piling with carried earth in three ponds in different location of Kalna Highway Sub Division under BSHD
Restoration work of Singerkone to Pandua Kulti Road via Badla from 0.00 km to 2.90 km (in stretches) damaged due to laying of underground water pipe line by PHE with box cutting and Jhama with moorum consolidation under Kalna Highway Sub Division
Emergent repair work of Joypur-Pundag-Karkara Road from 25.00kmp to 28.00kmp and 29.00kmp to 30.50kmp providing by Patch Potholes Patches WBM Gr II and 20mm Premix carpeting and Seal Coat and moorum consolidation etc under PCSD PWD Purulia of 21-22
Urgent restoration to communication by repair of Moorum Inspection Path over Rampura Ex-Zamindary Embankment from Rampura Primary School to House of Sri Rabi Jana for a length of 965.00 meter at Mouza- Rampura, GP- 5 No Sarta in Block PS-Sabang
Bankura Khatra Road 11.20 to 21.00 Kmp and 32.0 to 45.00 Kmp (all are In Stretches) by Repair Pothole, Premix Surfacing, Seal Coat (Type-B), moorum topping at shoulder Clearing and grubbing road land etc under PWD Bankura Division in the (2nd Call)
Restoration work of Kalna-Baidyapur Road to Akalpush H.C. road from 0.00 km to 1.50 km (in stretches) damaged due to laying of underground water pipe line by PHE with box cutting and Jhama with moorum consolidation under Kalna Highway Sub Division
Maintenance and repair work of Tamna Hesla Arsha road from 14 kmp to 16 kmp and protection of embankment including moorum shoulder in stretches from 0.00 kmp to 12.00 kmp of Damda Chakoltore Daradi Kenda Manbazar road (SH-5) under PHD 2nd call
Emergent repair Joypur-Pundag-Karkara Road from 0.00 kmp to 13.00 kmp and 29.00 km providing by Patch Potholes patches WBM Gr-II and 20 mm carpeting Premix carpeting and Seal Coat and moorum consolidation etc under PWD Purulia Division 2nd call
Sarda-Bujung Road from 0.00 Km to 3.20 Km under BHD-I Restoration work of hard shoulder with Jhama Metal Consolidation and moorum damaged by the PHE Dte. for their pipe line laying during the year 22-23 Funded by PHE Department
Carrying of Distribution Main (DI,K-7), Road Repairing by Brick bats Moorum and Supply Delivery of different dia DI Specials, sluice valve for Laying of Distribution Main (K-7), M.S. UPVC Pipe line due to uncovered area of this Zone-III
Construction Work
Construction Work
Construction Work
Sale with disposal of different building materials listed in Annexure A after demolition of existing 3 nos. buildings including felling and disposal of 4 (four) number of trees within the compound of Primary Health Centre at Dakshin Chatra under Ba
SUPPLY OF CONSTRUCTION MATERIAL FOR CONSTUCTION OF RURAL HAT AT KULBONI JL 87 PLOT 207 IN BAGHASTY GP UNDER KESHIARY
Construction Material Recovery Facility (MRF) for Dry / Plastic waste of Aiho GP under Habibpur Dev. Block, Malda. FUND- SBM(G)
Construction Material Recovery Facility (MRF) for Dry / Plastic waste at Block Premises under Habibpur Dev. Block, Malda. FUND- SBM(G)
Construction Material Recovery Facility (MRF) for Dry / Plastic waste of Bulbulchandi GP under Habibpur Dev. Block, Malda. FUND- SBM(G)
Repairing work of Kuli-Moregram Road from 1.00 Km to 2.00 Km by mending potholes and depressions by stitching picked jhama bricks (in stretches) under Murshidabad Highway Division No.II during 2022-23
Estimate for Improvement Of Footpath By Interlocking Decorative Colour Bricks from Rintu Saha house to Lakshman Pal, Sudhir Dutta to Narayan Dutta house Booth No-105 Ward No-06 under Rampurhat Municipality
WB/HOW/SHY-II/NIT-20/2025-26
Supply only or Supplying, Fitting and Fixing of various building construction materials at various work site under MGNREGA Fund for Hatora GP within Sainthia Dev. Block. 3rd Call
Supply only or Supplying , Fitting and Fixing of various building construction materials at various work site under MGNREGA Fund for Fulur GP within Sainthia Dev. Block. 3rd Call
Supply of Construction materials for construction of AWC(Centre No-122 at Kandarole Mouza-Kandarole JL No-160 Plot No-156 at GP-9 under Keshiary Panchayat Samity.
Supply only or Supplying , Fitting and Fixing of various building construction materials at various work site under MGNREGA Fund for Harisara GP within Sainthia Dev. Block.4th Call.
Supply only or Supplying , Fitting and Fixing of various building construction materials at various work site under MGNREGA Fund for Banagram GP within Sainthia Dev. Block. 3rd Call
Supply only or Supplying , Fitting and Fixing of various building construction materials at various work site under MGNREGA Fund for Mathpalsa GP within Sainthia Dev. Block. 3rd Call
Supply only or Supplying , Fitting and Fixing of various building construction materials at various work site under MGNREGA Fund for Deriapur GP within Sainthia Dev. Block. 3rd Call
Supply only or Supplying , Fitting and Fixing of various building construction materials at various work site under MGNREGA Fund for Harisara GP within Sainthia Dev. Block. 3rd Call
Construction Work
Under water diving job for Construction bricks sewer seal breaking by Deploying under water diver of 1400 mm and 1600 mm dia of pipe in your project site (Ward No. 20 and 22)
Estimate for Improvement Of Footpath By Interlocking Decorative Colour Bricks from Debashree cloth via Hiralal Gupta to Sankar Das, Srihari shop to Manoj Bhakat Booth No-104 Ward No-05 under Rampurhat Municipality
Estimate for Improvement Of Footpath By Interlocking Decorative Colour Bricks from Dilip Bhakat to Manik Bhakat,Bama hotel to Binapani hotel,Arabinda Milan Mandir Booth No-103 Ward No-05 under Rampurhat Municipality
Sherpur-Bishnupur Road from 8.30 to 8.50 Km......11.30 Km to 11.60 Km (in stretches) by mending potholes and depression by stitching picked jhama bricks under Murshidabad Highway Division No.II during 2023-24
Construction of Lab for construction material test at Block campus within Atharakhai G.P under Matigara Panchayat Samity. Fund 15th FC Untied
Link Road from Arbelia on Kalna Baidyapur Road to Dhapaspara Road via Chagram H.C. from 1.00 kmp to 1.50 km and 2.60 km to 4.50 km (in stretches) for restoration of flank by Jhama metal with moorum of Kalna Highway Sub Division under BSHD
Pre-Monsoon Repairing work of Bankura Town Road (1st feeder Road 0.0 to 1.65 km and 2nd Feeder Road 0.0 to 0.63 km) with Bituminous Potholes 20 mm Premix Carpet Seal Coat (Type B) and Moorum Consolidation (All are in patches) under Bankura Divisio
Singerkone to Pandua Kulti Road via Badla Road from 1.60 km to 3.60 km (in stretches) for restoration of flank by Jhama metal with moorum under of Kalna Highway Sub Division under Burdwan South Highway Division, P.W.(Roads) Dte. during the year 23-24
Construction of Brojolaltola AWC building proposed to be constructed in convergence mode with MGNREGA 2016,Malda under DAKSHIN CHANDIPUR GP under Manikchak Dev. Block, Malda (Construction materials supply Only).