Loading…
Loading…
2,449 results • Best match
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6677698 Dated : 12-09-2025 Bid Document 1/9 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7128091 Dated : 20-01-2026 Bid Document 1/9 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6600041 Dated : 25-08-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Multicore Cable as per IS 694 (Q3), XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2), Electrical Plugs as per IS 1293 (Q3), Electrical Plug (Q3)
Supply and Inst Electric Panel, Revamping of networking switc and shifting, OFC cable 12 core and 24 core armoured, Supply and lying Cat 6 networking cable, Air compressor PLC work, SITC 5 core 2.5sqmm armored cable, AC Replacement of Out Door Units of Carrier and Voltas, AC Indoor Repair Stabilizer change, AMC Service general check
1 CAT 6 UTP patch cord, 2 CAT 6 UTP patch cord, 3 CAT 6 UTP patch cord, 4 CAT 6 UTP patch cord, 5 CAT 6 UTP, 4 pair copper cable
Split Air conditioner, Inverter Type Split Air Conditioner, Stabiliser, Copper Pipe, Clamps, UPVC Drain pipe, Suitable UPVC Drain Pipe, Copper cable, Copper power and control cabling Between stabilizer, MS Frame, Coating paint
Work A) Replacement of existing 220kV Bidnal-Harti-Gadag DC line of Drake conductor by High Performance Conductor (HPC) from 220KV Bidnal sub-station to 220KV Gadag sub-station via 220KV Harthi Sub-station for a distance of about 53.207Kms in ... Moose conductor on ... Performance Conductor from ...
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6361051 Dated : 19-06-2025 Bid Document 1/8 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 99900 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 6 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Sr.Divisional Materials Manager SOUTH WESTERN RAILWAY, Indian Railways, South Western Railway, Ministry of Railways (Mahendra Singh) Splitting
Custom Bid for Services - Item No 1 of BOQ for Providing services of Electrician Semi Skilled 1 No per Shift of 8 hours Total 900 Shifts, Custom Bid for Services - Item No 2 of BOQ Providing services of Helper Unskilled 1 No per Shift of 8 hours ... only PVC insulated PVC ... copper conductor cable ... only PVC insulated PVC ... copper conductor cable ... only PVC insulated PVC ... copper conductor cable ... only PVC insulated PVC ... copper conductor cable ... only PVC insulated flexible ... flexible copper cable 2300052 ... proof PVC insulated multi ... copper conductor cable ...
CERTAIN B/R REPAIRS TO BUILDINGS AT KADAMBA VANAM AND CHENDIYA AT NAVAL BASE KARWAR AND REPAIR AND MAINTENANCE OF LIGHTING CONDUCTOR ALONG WITH CONNECTED ITEMS FOR DBM IGLOO AT NAD AND VAJRAKOSH AT NAVAL BASE KARWAR UNDER GE(SB) KARWAR
8666REPAIR MAINT OF INTERNAL WIRING LIGHTINING CONDUCTOR CHEMICAL AND CONVENTIONAL EARTHING AT ETI MI ROOM No 2 AFDC CWE OFFICE E ITI 16 TS IW SCHOOL SIGNAL SECTION AND LOGISTICS SECTION IN EAST AREA UNDER UNDER GE M AF JALAHALLI BANGALORE
Providing and shifting of Transformers, Poles and HT AND LT Cables, Rabbit Conductor and other materials in ward no.01,03,07,10,12,13,15,16,19 & 22 and Supplying, Fixing and Commissioning of High mast Street light in ward no.28 & 30 at CMC Hebbagodi Limits
2-conductor fuse terminal block with pivoting fuse holder for 5 x 30 mm miniature metric fuse without blown fuse indication for DIN-rail 35 x 15 and 35 x 7.5 4 mm2 Cage Clamp (R) 4,00 mm2 gray,as per
Supplying & Installaion of Networking Copper Cable (NCB), LAN Nodes, New optical fiber line (OFC) from Main building top floor network room to Judges Bungalow J1 to J6 with pvc white pipe line with allied accessories to Honble Judges Bungalows and Supplying and Installation of New RO Water Purifier, New Geyser (15Litre) to B1 & B2 Block and New Geyser (25Litre) to Honble Judges Bungalows J1 to J6, ARG & R1 to R3 with allied accessories in the premises of High Court Bench Kalaburagi for the year 2024-25
5P, 0.75 SQ. MM, annealed tinned copper conductor, 10P
CONTROL BOARD SP12(PWM) SERIES'G', DIODE(CONV) 147- 3171 ANODE BASE, EMA WATER COOLED LEAD-10 MTR LONG BRAIDE, HF POWER CABLE WITH END CONNECTORS
1. PTFE insulated Wire, ASH GREY Color of size 22 AWG, 2. PTFE insulated Wire, BLACK Color of size 22 AWG, 3. PTFE insulated Wire, GREEN Color of size 22 AWG, 4. PTFE insulated Wire, RED Color of size 22 AWG, 5. PTFE insulated Wire, BLACK Color of size 18 AWG, 6. PTFE insulated Wire, RED Color of size 18 AWG, 7. PTFE insulated Wire, GREEN Color of size 18 AWG, 8. PTFE insulated Wire, ASH GREY Color of size 24 AWG
power cord-Flexible electric cable Heating cables or Wire cotton Power for Heater, power cord- Flexible electric cable Heating cables or Wire cotton Power for Heater, power cord-Flexible electric cable Heating cables or Wire cotton Power for Heater ... for PVC insulated cable ... for PVC insulated cable, ... 3 Conductor material ... the conductor 4.00 ... of conductor Stranded ... for PVC insulated cable ... for PVC insulated cable, ... 3 Conductor material ... the conductor 06 ... of conductor Stranded ... for PVC insulated cable ... for PVC insulated cable, ... 3 Conductor material ... the conductor 1 ... of conductor Stranded ... for PVC insulated cable ... for PVC insulated cable, ... 3 Conductor material ... the conductor 2.5 ... of conductor Stranded ... 3 Conductor material ... the conductor 0.75 ... of conductor Stranded ...
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2024/B/5649696 Dated : 13-12-2024 Bid Document 1/5 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2026/B/7142296 Dated : 23-01-2026 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6329039 Dated : 11-06-2025 Bid Document 1/9 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate ... category XLPE Cable for ...
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate ... category XLPE Cable for ...
PVC Insulated (Heavy Duty) Electric Cables (V2) as per IS 1554 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7103349 Dated : 19-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 116850 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 32 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/8 Beneficiary : Sr.Divisional Finance Manager SOUTH WESTERN RAILWAY, Indian Railways, South Western Railway, Ministry of Railways, Bangalore Division. (Shreyas G Hosur)
PVC Insulated (Heavy Duty) Electric Cables (V2) as per IS 1554 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7103628 Dated : 19-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 163450 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 32 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/8 Beneficiary : Sr.Divisional Finance Manager SOUTH WESTERN RAILWAY, Indian Railways, South Western Railway, Ministry of Railways, Bangalore Division (Shreyas G Hosur)
PVC Insulated (Heavy Duty) Electric Cables (V2) as per IS 1554 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7090358 Dated : 19-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 65910 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 32 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/8 Beneficiary : Sr.Divisional Finance Manager SOUTH WESTERN RAILWAY, Divisional Office, DRM Office Bldg, Bangalore-560023. (Shreyas G Hosur)
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 10 Bid Number : GEM/2025/B/6686473 Dated : 16-09-2025 Bid Document 1/7 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 66284 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 30 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Sr.Divisional Materials Manager SOUTH WESTERN RAILWAY, Indian Railways, South Western Railway, Ministry of Railways (Sreedhar M Iyer) 2/7 Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6656165 Dated : 10-09-2025 Bid Document 1/8 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 99900 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 30 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : 2/8 Sr.Divisional Finance Manager SOUTH WESTERN RAILWAY, Indian Railways, South Western Railway, Ministry of Railways (Sr.dfm/swr/ubl) Splitting
03 Ton capacity Motorized Winch Machine, Sagging Winch Machine 5 T Motorised, Compressor Machine Motorised 120 T with 50 Mtr Hose Pipe, Die For Pulling Eye for steel as per Moose HTLS conductor specification and for Compressor machine above, Die For ... HTLS conductor specification ... For Conductor steel ... HTLS conductor specification ... For Conductor Aluminium ... HTLS conductor specification ...
1251810200 EXTERNAL HARD DISK 2 TB, 1251810211 KEYBOARD WIRELESS, 1251810184 MOSUE FOR COMPUTER WIRELESS, 1251810062 KEYBOARD USB, 1251810057 MOUSE USB OPTICAL, 1251810044 SMPS FOR P4 PC ATX AC, 1251810152 CAT 6 UTP COPPER CABLE
Camera, NVR, Harddisk, Switch, OFC Cable, Power Cable, CAT6 cable, HDPE, Display1, Display2, Rack, Accessories, patch chords, SFP Module, HDMI over ethernet extender, UPS, LIU, SITC
Service connector of 2.5 sq.mm cross section for connecting Railway Carriage Fan and Light Fittings as per item No.WAGO Make or equivalent as per the technical data: (1) Type of wiring: Side-entry wiring. (2) Total number of connection points: 2. (3) ... Connectable conductor material: ... Solid conductor : ... stranded conductor : ...
ALUMINIUM ANNEALED WIRE TWO AND HALF MM DIA, ALUMINIUM ANNEALED WIRE 2MM DIA, ALUMINIUM ANNEALED WIRE ONE POINT SIX MM DIA, CU WIRE 2 to 2 point 2 MM DIA, Copper WIRE point 3 to point 5 MM DIA
Creation of necessary electrical infrastructure for providing street light/ metering along with Timer switch on partial turnkey basis (ACSR rabbit conductor will be supplied by the BESCOM) under item wise fixed rate con tract on percentage quoting basis in Magadi sub-division
Creation of necessary electrical infrastructure for providing street light/ metering along with Timer switch on partial turnkey basis (ACSR rabbit conductor will be supplied by the BESCOM) under item wise fixed rate con tract on percentage quoting basis in Tavarekere sub-division
Creation of necessary electrical infrastructure for providing street light/ metering along with Timer switch on partial turnkey basis (ACSR rabbit conductor will be supplied by the BESCOM) under item wise fixed rate con tract on percentage quoting basis in Bevoor sub-division
Creation of necessary electrical infrastructure for providing street light/ metering along with Timer switch on partial turnkey basis (ACSR rabbit conductor will be supplied by the BESCOM) under item wise fixed rate con tract on percentage quoting basis in Channapatna Rural sub-division
Creation of necessary electrical infrastructure for providing street light/ metering along with Timer switch on partial turnkey basis (ACSR rabbit conductor will be supplied by the BESCOM) under item wise fixed rate con tract on percentage quoting basis in Chikkaballapura Rural sub-division
Creation of necessary electrical infrastructure for providing street light/ metering along with Timer switch on partial turnkey basis (ACSR rabbit conductor will be supplied by the BESCOM) under item wise fixed rate con tract on percentage quoting basis in Kolar urban sub-division
Creation of necessary electrical infrastructure for providing street light/ metering along with Timer switch on partial turnkey basis (ACSR rabbit conductor will be supplied by the BESCOM) under item wise fixed rate con tract on percentage quoting basis in Kanakapura urban sub-division
Work Of Re-conductoring Of 33 Kv Line (rabbit To Coyote) From Chowdapur Four Pole Structure To Ankalga 33/11 Kv Sub-station In C&m Division, Gescom, Kalaburagi On Partial Turnkey Basis In Which 20kms Coyote Conductor Will Be Supplied Departmentally
Creation of necessary electrical infrastructure for providing street light/ metering along with Timer switch on partial turnkey basis (ACSR rabbit conductor will be supplied by the BESCOM) under item wise fixed rate con tract on percentage quoting basis in channapatna urban sub-division
Creation Of Necessary Electrical Infrastructure For Providing Street Light/ Metering Along With Timer Switch On Partial Turnkey Basis (acsr Rabbit Conductor Will Be Supplied By The Bescom) Under Item Wise Fixed Rate Con Tract On Percentage Quoting Basis In Sathnur Sub-division
Strengthening Of F-11 Ganakallu Feeder By Replacing Existing Overhead Conductor To Htug Cable In Kengeri O&m Unit 22 Of K1 Sub Division Of Kengeri Division Of Bangalore West Circle, Bmasz, Bescom For A Period Of One Year Under Partial Turnkey Basis
10 SQ.MM, ELECTRON BEAM IRRADIATION CURING PROCESS THIN-WALLED FLEXIBLE ELASTOMERIC CABLE WITH COPPER CONDUCTOR SUITABLE FOR ROLLING STOCK APPLICATION CONFORMING TO RDSO SPEC.NO.ELRS/SPEC/ELC/0019, REV.4, FEB- 2018, 1.8 KV GRADE. ELECTRON BEAM IRRADIATED CROSS-LINKED CABLES ARE ONLY ACCEPTABLE.
10 SQ.MM, ELECTRON BEAM IRRADIATION CURING PROCESS THIN-WALLED FLEXIBLE ELASTOMERIC CABLE WITH COPPER CONDUCTOR SUITABLE FOR ROLLING STOCK APPLICATION CONFORMING TO RDSO SPEC.NO.ELRS/SPEC/ELC/0019, REV.4, FEB- 2018, 1.8 KV GRADE. ELECTRON BEAM IRRADIATED CROSS-LINKED CABLES ARE ONLY ACCEPTABLE.
10 SQ.MM, ELECTRON BEAM IRRADIATION CURING PROCESS THIN-WALLED FLEXIBLE ELASTOMERIC CABLE WITH COPPER CONDUCTOR SUITABLE FOR ROLLING STOCK APPLICATION CONFORMING TO RDSO SPEC.NO.ELRS/SPEC/ELC/0019, REV.4, FEB- 2018, 1.8 KV GRADE. ELECTRON BEAM IRRADIATED CROSS-LINKED CABLES ARE ONLY ACCEPTABLE.
10 SQ.MM, ELECTRON BEAM IRRADIATION CURING PROCESS THIN-WALLED FLEXIBLE ELASTOMERIC CABLE WITH COPPER CONDUCTOR SUITABLE FOR ROLLING STOCK APPLICATION CONFORMING TO RDSO SPEC.NO.ELRS/SPEC/ELC/0019, REV.4, FEB- 2018, 1.8 KV GRADE. ELECTRON BEAM IRRADIATED CROSS-LINKED CABLES ARE ONLY ACCEPTABLE.
Establishing 2x20MVA,110/11kV substation at K.Basavanahalli along with Construction of 110kV LILO line using Lynx Conductor for a distance of 11.958 kms from existing 110kV Yagati-Singatagere SC line to the proposed 110kV sub-station at K.Basavanahalli in Kadur Taluk,Chikkamagaluru District