Loading…
Loading…
4,773 results • Best match
Thin walled electron beam irradiated flexible elastomeric cable with copper conductor for working voltage above 750V and upto 1.8 KV/3 KV grade, size 19 X 2.5 sq mm to RDSO Specn No. ELRS/SPEC/ELC/001
Set of Harting kitting part no 8490024109 as below 1) Han 3HPR M20 screw locking limiting temperature - 40 to 125 0c - 10 nos. 2) Han 8D female insert crimp conductor cross section 0.14 to 2.5 sq.mm r
FUSE SEMI CONDUCTOR 1000Amps,1000 volts SUITABLE FOR WAG-5 SILICON RECTIFIER BLOCK make bussman type 170 L 7299 (both side link)or ferraz type C 220250 /10000 CA URB 73 ESP 1000D 110 (both side link )
LED Bulb 07 Oblique 09 Watt, LED tube light 18 Watt assy 2 feet, LED tube light 18 Watt assy 4 feet, Electronic Fan regulator dimmer type, Exhaust fan single phase 230 Oblique 240 Volts AC 1350 RPM Size 6 inch, Switch P type 5A Oblique 6A 240 V, ... PVC electric wire copper ... PVC electric wire copper ... PVC electric wire copper ... PVC electric wire copper ... Green, PVC insulated copper ... copper conductor wire, ... PVC electric wire copper ... PVC electric wire copper ...
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days Bid Number : GEM/2025/B/6213582 Dated : 05-06-2025 Bid Document 1/7 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 3 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Director, DPS Directorate Of Purchase And Stores, Department of Atomic Energy, Directorate of Purchase and Stores, PMO (The President Of India, Acting Through The Director, Dps) Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6632227 Dated : 09-09-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6509559 Dated : 01-08-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6821684 Dated : 31-10-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6505050 Dated : 01-08-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6492780 Dated : 01-08-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3), XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2), LED Batten (Q2)
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3), XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2), LED Batten (Q2)
Supply installation testing and commissioning of 50 Sqmm 3 Core copper armoured XLPE cable extension of terminal box for 75 HP Motor 1 No at Worli Koliwada Pumping station under AE MaintWWCityII section
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3), XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2), LED Batten (Q2)
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3), XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2), LED Batten (Q2)
122056/2019-20 Prov 100 KVA DTC and LT Service Cable for B Wing District Court Sangli
LED Street Light 36 Watt With Clamp Service cable Navagaon V P Navagaon Tal Navapur Dist Nandurbar
1st Called
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6855750 Dated : 07-11-2025 Bid Document 1/9 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7044377 Dated : 04-01-2026 Bid Document 1/8 Number of Auto Extension count 2 Past Performance 30 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Estimated Bid Value 1252000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Power Cable 4 Core 25 Sqmm Aluminium, Power Board 5 A with 2 x switches, Nylon Cable Tye, OFC Joint Encloser, ISO Propane
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from ... category XLPE Cable for ...
PROVN OF BOLLARDS LIGHT WITH UG CABLE AND CONNECTED WORKS , PROVN OF LIGHTIENING CONDUCTOR FOR CONF HALL AND SPECIAL REPAIR / REPLACEMENT OF LT PANELS, LT POLES, STREET LIGHTS AND CONNECTED WORKS AT FORT AREA NAGPUR UNDER GE KAMPTEE
Copper Tubular Terminal ends size 95-100 sq mm with hole dia 10.2 sq mm. for Solderless Crimping to copper conductor as per CLW Specification No. CLW/ES/S-25(Material to be procured from CLW sources o
COPPER TUBULAR TERMINAL ENDS FOR SOLDERLESS CRIMPING TO COPER CONDUCTOR FOR CABLE SIZE : 120 MM SQUARE FOR EMU's AND LOCO'S. SPEC/DRG.NO.: AS PER CLW's SPEC NO.: CLW/ES/SK-1/S-25, ALT. I TYPE-7. MAKE/
EARTHING DISCHARGE ROD ASSEMBLY FOR 25 KV AC TRACTION TO BE SUPPLIED ALONG WITH TWO RAIL CLAMP, TOP CLAMP OF SIZE SUITABLE FOR 10MM TO 20 MM DIA CONDUCTOR AND CABLE Total 10 METER LONG WITH CANVAS BAG
EARTHING DISCHARGE ROD ASSEMBLY FOR 25 KV AC TRACTION TO BE SUPPLIED ALONG WITH TWO RAIL CLAMP, TOP CLAMP OF SIZE SUITABLE FOR 10MM TO 20 MM DIA CONDUCTOR AND CABLE Total 10 METER LONG WITH CANVAS BA
EARTH DISCHARGE ROD ASSEMBLY FOR 25 KV AC TRACTION TO BE SUPPLIED ALONG WITH TWO RAIL CLAMP (10MM TO 20 MM DIA CONDUCTOR) AND CABLE 9 METER LONG WITH CANVAS BAG AS PER RDSO SPECIFICATION No:ETI/OHE/51
Thin Walled Flexible Elastomeric (E-Beam) Cable, With Copper Conductor, Size 6 Sq. Mm Up To 750 V As Per Rdso Specification No. ELRS/SPEC/ELC/0019-REV.4. Feb- 2018. Note: RYBB to be supplied in equal
Copper Tubular Terminal ends size 95-100 sq mm with hole dia 10.2 sq mm. for Solderless Crimping to copper conductor as per CLW Specification No. CLW/ES/S-25(Material to be procured from CLW sources o
COPPER TUBULAR CRIMPING SOCKET FOR E-BEAM CONDUCTOR SUITABLE FOR SIZE OF CABLE 150 SQ. MM, STUD M 16. ITEM-1 AS PER EDTS-200 REV-NIL, AM-2, CORR-1,2,3 OR LATEST(EXTRA HEAVY DUTY) Make KI
Motor Pump, PVC Pipe, Nozzle Sprinkler, UPVC Pipe, Elbow, Thread Valve, MCB box, Electric Wire, Flower pots with iron frame, Display board, carpet BOQ Title BOQ UPKEEP AND MAINT OF OFFICE COMPLEX
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6618882 Dated : 30-08-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Supply of Weatherproof fixed cameras, Supply of 16 Channel NVR Server, Supply of 10 TB harddisk, Supply of POE switch, Supply of HD LED Display, Supply of 4 U Rack, Supply of CAT6 Armoured cable, Install n Comm INST COMM CCTV
Releasing Mechanism MFZ-420, Clutch Release Bearing, Clutch Plate, Coolant Water Tank, Speedometer Cable, Clutch Cable Assy, Cable Assy speedometer, Arense Control Cable, Timing Belt, Accelerator Cable
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6487601 Dated : 24-07-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 60 Quality Assurance Plan document 1753267387.pdf Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Aluminium Conductors For Overhead Transmission Purposes (V2) Conforming To IS 398 (Q3) MSE Exemption for Years Of Experience Yes Startup Exemption for Years Of Experience Yes Document required from seller Additional Doc 1 (Requested in ATC), ... Aluminium Conductors For ...
Supplying Erecting Testing and Comissioning of New infrastructure (HT Line, LT Line with AB cable and Transformer) For electrification and rehabilitation of village Mouza Bhon (Jigaon Project) at Mouza Hingane Kawathal in Gut No. 49,50,51,67,70,71 an
Design, Manufacture, Supply, Erection, Testing and Commissioning Of new Swtichgear Panel in New DG Set Room, Power Cables And street lighting in New DG room area at Sapan River Project Tal. Achalpur Dist. Amravati.
Miniature Circuit Breakers-IS 60898-1:2002, Power Cable For Direct Burial Xlpe Ugac Cable-IS: 10418, Electrical Plugs-IS 1293, electrical box extension
Providing of Ring main unit associated foundation power cable trench etc at 6.6 KV side of Transformer at Pundi LIS Stage 1 and 2
Testing of 6 6 KV Power cable and providing of 6 6 KV Jointing kit for Mhaisal Lift Irrigation Scheme Stage I and II
((1) Construction of road from Kalubaimandir to Geetanagar at Pandare Tal Baramati, (2) Construction of road from Shivaji Conductor Wasti to Shrinivas Pawar Home at Pandare Tal Baramati, (3) Construction of road from Narayan Shinde Home to Anil Jagta
Custom Bid for Services - Work of supplying and installation of 30 nos lightning protection system comprising an air termination system down conductor system and earthing system as per scope of work at various locations of Adasa OCM Nagpur Area
Thin walled E-beam irradiated ,single co [Thin walled E-beam irradiated ,single core cable with copper conductor 3000V,2.5 Sq.mm,conforming to RDSO Spcn ELRS/SPEC/ELC/0019,Rev 4 Feb-2018. (Red and Black in equal quantity).]
8372 SPECIAL REPAIR TO STREET LIGHT FITTINGS AND ALLIED ITEMS FOR ELLIOT LINES AND OTHER AREAS OF 41 ADSR AND SPECIAL REPAIRS REPLACEMENT OF OH CONDUCTOR TO LT UG CABLES AT AIPT AND APTC DEPOT UNDER GE (CENTRAL) PUNE
Running Contract for Supply of Underground Jelly Filled 6 Quad x 0.9 mm Dia Copper Conductor Cable for Railway Signalling and Telecom installations conforming to RDSO Specification No IRS:TC-30/2005 (Ver-1) with Amendment Nos 1 to 5
Renovation of toilets, retrofitting, external finishing, internal finishing and structural repairs including providing IEI and Fans i/c LED fittings, FA system and lighting conductor to the Safety Centre at CLI, Sion, Mumbai(SH- Providing split type Air Conditioners.)
THIN WALLED E-BEAM IRRADIATED FLEXIBLE CABLE SIZE 95 SQMM WITH COPPER CONDUCTOR WORKING VOLTAGE ABOVE 750V & UPTO 1.8/3.0 KV GRADE, AS PER RDSO SPEC. NO. ELRS/SPEC/ELC/0019 REV.4 OF FEB.2018. as per D
EARTH DISCHARGE ROD ASSEMBLY FOR 25 KV AC TRACTION TO BE SUPPLIED ALONG WITH TWO RAIL CLAMP (10MM TO 20 MM DIA CONDUCTOR) AND CABLE 9 METER LONG WITH CANVAS BAG AS PER RDSO SPECIFICATION No: ETI/OHE/5