Loading…
Loading…
1,469 results • Best match
Cement Concrete pavement at Rd 13/240 and Junction Point at RD 13/300
Job 3 Construction of Link Road Madya Marg to Village Palkwah from Palkwah Lalri Nangal Khurd road Tehsil Haroli Distt. Una Sub Head Providing and Laying GSB, WMM and BC in km. 0-0 to 0-600 and Cement Concrete pavement in km. 0-600 to 0-635 Under OTM
C/o link road from Baliana Lamber Basti to Suked Km. 0/0 to 2/0 (SH cement concrete pavement in Km. 0/0 to 0/060, retaining wall at RD. 0/005 to 0/060 and providing and laying premix carpet in Km. 0/510 to 0/710) under MMSY.
C.O M.T link road to village Bhoti towards house of Sh. Singh SH P.L interlocking paver block and CC pavement at RD 0.0 to 0.400
RRD on Saleti to Bhindla road Km. 0/0 to 2/820 (SH C/O CC Pavement at RD 2/555 to 2/685 ) PDNA
Balance work of C/o road from main road towards Bharari Mata Mandir (SW- P/L CC Pavement at Parking Area for Vehicles (MMGSY Deposit) .
SH- Providing and laying cement concrete pavement at RD 0/0 to 0/320) MMGSY
Construction of Protection Wall and Cement Concrete Pavement at RD 0/00 to 0/015
P/L Causeway in cement concrete pavement at RD 0/125 to 0/235) MNP
Providing and laying cement concrete pavement in Km. 0/0 to 0/100 under MMGSY
Construction of cement concrete pavement and R/Wall at RD 1/590 to 1/640
Providing and laying cement concrete pavement at RD 1/410 to 1/510) (Under PDNA
P/L cement concrete pavement leg No-4 at Rd 0/827 to 1/075
P/L cement concrete pavement at Rd 0/270 to 0/440 ) (under OTMNP Head)
C/O Retaining wall and Cement concrete pavement at RD 0.310 to 0.500 Under BASP
(SH- P/L cement concrete pavement in km. 0/180 to 0/540)(Under SCSP)
SH Providing and laying cement concrete pavement at km 0/270 to 0/510) SCSP
P.L Cement Concrete pavement at RD 8.0 to 8.025 and 8.240 to 8.327) Deposit work
P/L Cement Concrete pavement at Rd 0/500 to 0/750 (Under OTMNP Head)
P/L cement concrete pavement from RD. 0/00 to 0/070).(Deposit work MPLAD)
(Providing and Laying 30 mm thick Bituminous Concrete with Paver Finisher and Cement Concrete Pavement
Providing and Laying 30 mm thick Bituminous Concrete with Paver Finisher and Cement Concrete Pavement
Providing and Laying 30 mm thick Bituminous Concrete with Paver Finisher and Cement Concrete Pavement
Providing and Laying 30 mm thick Bituminous Concrete with Paver Finisher and Cement Concrete Pavement)
Construction of R.wall and P.L Cement concrete pavement at various RDs BSP.2024.478 under Deposit
P/L Khranja Soling and Cement Concrete pavement at various slushy reaches) Under SDRF 2024
Providing and Laying 30 mm thick Bituminous Concrete with Paver Finisher and Cement Concrete Pavement )
SPL REPAIR TO PCC ROAD, BERM AT MIL AREA NEAR CHANDPUR TCP AT PALAMPUR MIL STN
Job 5 Construction of link road Satian to Kutli in G.P. Heeran Thara SubHead C.O CC pavement at RD 0-0 to 0-185 Under MMSY
Link road to Village Gujredha Km 0/00 to 0/450 (SW- Providing and laying G-II, CC Pavement at RD 0/00 to 0/140)
Balance work Gehar Speru Kandwari Rajehar road Km 0/00 to 4/650 (SH- P/L GSB, G-II, G-III, CC Pavement (NABARD RIDF-XXIX)
Job 6 Construction of link road Harijan Basti Jalgran km.0-00 to 0-300 Sub Head C.O CC Pavement, Breast wall, CC overlay Under SCCP.
R/M of Path from Sagar House toward Nallah Shiwani house in Ward No.2 Sub head - P/L CC pavement to damaged portion of Path
Improvement of Nangal Chowk to Jambal Bassi road Km. 0/0 to 6/0 (SH. C/o cement concrete pavement at RD 0/090 to 0/155, 1/400 to 1/480, 1/590 to 1/620, 1/800 to 1/910, 3/565 to 3/600 and 4/970 to 5/190
C/o link road from Main road to the house of Sh.Tara Singh Rana in GP Kaloha km 0/0 to 0/500(SH Removal of Formation Deficiency C/o Edge wall, wire crate and providing and laying cement concrete pavement in between at RD 0/090 to 0/120) under MMSY.
Construction of link road HSC to Nanku Ram House and Others Band Vihar KM 0/00 to 0/150 (SH - Providing laying G-II, G-III and Cement Concrete road (MMGSY)
Construction of cement concrete road at I.A Nagri, Distt. Kangra (from end point of metteled portion to newly carved plots of Ph-II). (SH- C/o road, drains and RCC culverts).
Providing and laying GSB, Cement concrete pavement at RD. 0/800 to 0/880 ) ( DEPOSITE WORK
(SH- Providing and Laying Cement concrete pavement at RD 1/0 to 1/225) Under SCSP
P/L Cement concrete pavement at various RDs C/O PCC R/wall at various RDs
C/O cement concrete pavement and V-shape drain at RD 6/305 to 6/335)
Providing and laying Cement Concrete Pavement at km 1/800 to 2/040) under PDNA 2023
(SH- Providing and Laying GSB Cement Concrete Pavement at Various RD 0/050 to 0/193)
Providing and laying Kharanja soling and cement concrete pavement at km. 0/100 and 0/206 ).
Providing and laying Cement Concrete Pavement at RD 0/0 to 0/031 and Edge wall)
Formation cutting Cement concrete pavement V-shape drain wire crate R/wall B/wall under MMGSY
P/L GSB, G-II and Cement concrete pavement from RD 0/700 to 0/960
M/T and Cement Concrete Pavement in slushy reaches in Km 2/990 to 3/990
Providing and laying GSB, WBM and Cement concrete pavement at RD 2/300 to 2/450
Providing and laying Kharanja Soling and Cement concrete Pavement at Km. 2/100 to 2/350).