Loading…
Loading…
1,470 results • Best match
Balance work of Repair and Maintenance of road from Sunhara to Tadoli km. 0/0 to 1/0 SH Construction of PCC Retaining wall at RD 0/450 to 0/465 0/705 to 0/715 and 0/840 to 0/855 and cement concrete pavement at RD 0/780 to 0/889 Under Chief Ministe
Restoration of rain damage on Kapahra to Karloti via Seenbehal km 0/0 to 2/190 SH P/L Cement concrete pavement and G-I at RD 1/540 to 1/640, C/o R/wall at RD 0/075 to 0/105, 1/540 to 1/570 and 0/390 to 0/411 Under PDNA Year 2023
C/o link road kularu,Puhai,jeor Ballu in GP Panol SH Providing and laying cement concrete pavement at RD 0/00 to 0/176.50,R/wall at RD 0/450 to 0/465,B/wall at RD 0/310 to 0/360 and hume pipe culvet at RD 0/250 and at RD 0/450 SDP Deposit
Improvement of Bharmour Badgram Road Pallani Ghar SH P/L CC pavement at Rd 19/200 to 19/390 and B/wall at Rd 19/230 to 19/360
Completion and strengthening of Berthin Chatt Karloti Dangar Targhel Taroun Ladraur road (Portion Taroun Barota road ) ( SH Providing and laying Paver blocks, C/o CC pavement , road furniture etc
Const of Ambulance road from Kaka Di Talai to village in km 0300 in GP Upper Lohara SH Const of CC pavement between km 000 to 0250 under MMGSY
RRD on Kaloha Pragpur Dhaliara Dada Siba Sansarpur Terrace road Km.0/0 to 9/0 (SH C/o CC Pavement at RD 3/600 to 3/640) PDNA
Construction of Pucca path from Jakhbar road to house of Ram Singh Manohar Lal in Village Kutlahar GP Pollian Under MLALAD Deposit Work SH Providing and laying CC Pavement
R/M of Path from Bhagsunag Parking to Dharamkot in Ward No.2 Sub head - P/L 900mm dia hume pipe NP2 RCC pipe, boulder filling and CC pavement
Construction of road Darati to Bharthadi Bridge (SH - Providing and laying G-II and CC Pavement at RD 0/00 to 0/150 alongwih edge wall to road (MMGSY)
Restoration of rain damages on link road from Saloi to Fanged km 000 to 300 SH CO Retaining wall and CC Pavement in km 2860 to 300 Under PDNA2023
Const of Ambulance road from Kamta Sidh to Abadi Brahmana Thanikpur in km 0300 in GP Upper Lohara SH CO CC pavement between km 000 to 0250 under MMGSY
Construction of Road to ward No.03 in GP Babehar Km Babehar KM 00 to 1000 SH Providing and laying CC pavement between Km 000 to 0200 under MMSY
C/o road near the house of Paras Ram to the house of Ramesh Chand Ward No. (GP Lalhla) (SH- Providing laying Stone soling and CC pavement (Under MMGPY)
Co link road to Sardaran Harizan Basti from Boul Jhamber Lam road SH Co CC Pavement in Km 1200 to 1450 and Co Rwall in Km 1915 to 1932
C/o Ambulance road from Tek Chand House to Dinesh Kumar Cow Shed village Barota GP Loharwin SH P/l CC pavement at RD 0/00 to 0/038
R and M Cement Concrete road from H/o Mr. Ahuja to Mr. Mittal, around Patwarkhana and Govt. Ayurvedic Dispensary, H/o Dr. Behl to Mr. Tarun house at Khaliyar in W. No. 1
Construction of 200 seated Boys Hostel at Visva Bharati SH: Construction of cement concrete road, wpc jali for shaft covering, metal false ceiling, fixing of stainless steel railing and providing and installation of furnitures
(Sub Head - Providing and laying Cement Concrete Pavement at km 0/760 to 0/920) under PDNA 2023.
Sub Head - Providing and Laying Kharanja Soling and Cement Concrete Pavement at Km 0/850 to 0/915).
P/L Cement concrete pavement and V-shape drain at Rd 2/800 to 2/905.50) (Deposit work)
P/L soling, WMM P/L cement concrete pavement in Km 0/00 to 0/350 ) (under MMGSY)
Construction of Cement Concrete Pavement at RD 6/900 to 6/920 and 7/150 to 7/215
P/L cement concrete pavement at RD 0/090 to 0/140 and 0/420 to 0/485
Providing and Laying Cement Concrete pavement and road side drain in between RD. 2/225 to 2/500
P/L cement concrete pavement for parking way near public toilets in ward no. 4 and 6 , Talai.
Providing and laying WBM GII WBM GIII and 20 mm thick premix carpet surfacing and cement concrete pavement
Construction Formation cutting, Passing places, Retaining walls, Missing CD, , Side Drain, Parapets, Cement concrete pavement and tarring work
Providing and Laying Cement Concrete pavement and road side Drain in between RD. 5/750 to 5/845
(Sub Head - Providing and laying Kharanja soling and Cement Concrete Pavement in Km. 2/0 to 2/048)
P/L of cement concrete pavement at RD 0/210 to 0/285 , 0/500 to 0/700
C/O Cement concrete Pavement at RD 4/010 to 4/050 and 4/670 to 4/960
(Sub Head - Providing and laying Cement Concrete Pavement at km 5/000 to 5/160 under PDNA 2023)
P/L cement concrete pavement for parking way near path towards Sariyali Khad in ward no. 4 , Talai.
P/L cement concrete pavement for parking way near Dugh Khad in ward no. 6 and 7 , Talai.
(Sub Head- Providing and laying cement concrete pavement at km.0/0 to 0/175 under PDNA 2023
Providing and Laying Cement Concrete pavement and road side Drain in between RD. 1/100 to 1/240
Providing and Laying Cement Concrete pavement and road side Drain in between RD. 2/810 to 2/945
Providing and Laying cement concrete pavement from RD 0/800.50 to 1/045 along with drain ( Kakira Bazar).
Construction of PCC retaining wall, Edge wall, P/L M/T, cement concrete pavement and crash barrier) (BASP)
Construction of Cement concrete pavement from RD 0/607 to 0/840 and 1/300 to 1/365
Construction Formation cutting, Passing places, Retaining walls, Missing CD, , Side Drain, Parapets, Cement concrete pavement and tarring work
Construction of cement concrete pavement at RD 3/825 to 3/860 and 4/200 to 4/300
(Sh. Providing and Laying cement concrete pavement in between Km. 0/0 to 0/500) under OTMNP Head
Providing and laying cement concrete pavement at RD 0/320 to 0/590, 1/135 to 1/165
Removal of formation deficiencies, construction of retaining/breast walls, cross drainage works, metalling and tarring, cement concrete pavement
under Village Roads (Providing and Laying 30 mm thick Bituminous Concrete with Paver Finisher and Cement Concrete Pavement
CC Pavement Road
PROVN OF PCC ROAD FROM PLAY GROUND TO MT GATE OF EME BN AT YOL CANTT
RRD on Kotla Ghatti Bilwan road to Khanore Chowki Di Bar Km. 0/0 to 2/200 (SH C/o CC Pavement at RD 1/800 to 2/0) PDNA