Loading…
Loading…
100 live52 closing this weekmost from Panchayats And Rural Housing Department Gujarat and Ahmedabad Municipal Corporation
100 results • Best match
Camera for CCTV System (V3) (Q2), Video Recorder for CCTV System (V2) (Q2), Television (V3) (Q2) (3 (3 ))
Camera for CCTV System (V3) (Q2), Video Recorder for CCTV System (V2) (Q2), Ethernet Cables (Q2) ( ( 3 3 ))
Camera for CCTV System (V3) (Q2), Video Recorder for CCTV System (V2) (Q2), Television (V3) (Q2) (3 (3 ))
Video Recorderfor CCTV System (V2) (Q2)
Video Recorderfor CCTV System (V2) (Q2)
Video Recorderfor CCTV System (V2) (Q2)
Camera for CCTV System (V3) (Q2), Video Recorder for CCTV System (V2) (Q2), Ethernet Cables (Q2), Television (V3) (Q2) (3 (3 ))
Camera for CCTV System (V3) (Q2), Video Recorder for CCTV System (V2) (Q2), Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
Camera for CCTV System (V3) (Q2), Ethernet Cables (Q2), Cables, Converters and Adapters (Q3), Video Recorder for CCTV System (V2) (Q2) (3 (3 ))
Video Recorder for CCTV System (V2) (Q2), Camera for CCTV System (V3) (Q2), Optical Fibre Cable for Networking (Q3) (3 (3 ))
Camera for CCTV System (V3) (Q2), Video Recorder for CCTV System (V2) (Q2), Television (V3) (Q2), Optical Fibre Cable for Networking (Q3) (3 (3 ))
Camera for CCTV System (V3) (Q2), Optical Fibre Cable for Networking (Q3), Television (V3) (Q2), Video Recorder for CCTV System (V2) (Q2) (3 (3 ))
Camera for CCTV System (V3) (Q2) (3 (3 ))
Video Recorder for CCTV System (V2) (Q2) (3 (3 ))
Supply, Installation, Testing and Commissioning of CCTV System at HAPA Wagon Depot.
SUPPLY AND INSTALLATION OF CCTV VIDEO MANAGMENT SYSTEM WITH SERVER (SECOND TRY)
Facility Management Services - LumpSum Based - Commercial; CCTV Installation, Fitting, Configuration & Comprehensive Maintenance Services; Consumables to be provided by service provider (inclusive in contract cost)
Camera for CCTV System (V3) (Q2) MSE Relaxation for Turnover Yes | Complete Startup Relaxation for Turnover Yes | Complete
Camera for CCTV System (V3) (Q2) MSE Relaxation for Turnover Yes | Complete Startup Relaxation for Turnover Yes | Complete
Camera for CCTV System (V3) (Q2) MSE Relaxation for Turnover Yes | Complete Startup Relaxation for Turnover Yes | Complete
Camera for CCTV System (V3) (Q2) MSE Relaxation for Turnover Yes | Complete Startup Relaxation for Turnover Yes | Complete
Camera for CCTV System (V3) (Q2) MSE Relaxation for Turnover Yes | Complete Startup Relaxation for Turnover Yes | Complete
Camera for CCTV System (V3) (Q2) MSE Relaxation for Turnover Yes | Complete Startup Relaxation for Turnover Yes | Complete
CCTV Desilting Work of Existing Drainage line and Storme Water Line at diff roads in Ambali area and diff area in bodakdev ward NWZ.(ARC)
CCTV Desilting Work of Existing Drainage line and Strome Water Line at diff roads in Vastrapur area and diff area in bodakdev ward NWZ.(ARC)
CCTV Desilting Work of Existing Drainage line and Strome Water Line at diff roads in Memnagar area and diff area in bodakdev ward NWZ.(ARC)
CCTV Desilting Work of Existing Drainage line and Strome Water Line at diff roads in Ambali area and diff area in bodakdev ward NWZ.(ARC)
CCTV Desilting Work of Existing Drainage line and Storm Water Line at diff roads in Tp-50 area and diff area in bodakdev ward NWZ.(ARC)
Custom Bid for Services - TENDER FOR ADDITIONAL CCTV INSTALLATION & STORAGE BACKUP TO 180 DAYS AT SURAT LPG PLANT Similar Category ANNUAL MAINTENANCE SERVICE - VIDEO/DATA WALL
CCTV Desilting Work of Existing Drainage line and Strome Water Line at diff roads in Tp-50 area and diff area in bodakdev ward NWZ.(ARC)
CCTV Desilting Work of Existing Drainage line and Storm Water Line at diff roads in Bopal area and Ambali area and diff area in bodakdev ward NWZ.(ARC)
CCTV Desilting Work of Existing Drainage line and Strome Water Line at diff roads in Bopal area and Ambali area and diff area in bodakdev ward NWZ.(ARC)
Erection of 66KV equipment, structures, control wiring, yard Lighting, Control-Room Electrification & CCTV Installation etc at 66KV Rancharda S/S under Nadiad construction division office under Nadiad TR circle.
CCTV Desilting Work of Existing Drainage line and Storm Water Line at diff roads in Rajpath Rangoli road to Sindhubhavan road Area and diff area in bodakdev ward NWZ.(ARC)
CCTV Desilting Work of Existing Drainage line and Strome Water Line at diff roads in Rajpath Rangoli road to Sindhubhavan road Area and diff area in bodakdev ward NWZ.(ARC)
Leasing in of Commercial Properties - Holiday Home at Vadodara; Wet Lease (maintenance to be borne by lessor); Not more than 15 Years; Any; Any; CCTV facility, Electricity back-up, As per ATC; yes; yes; yes; 19
CCTV Desilting Work of Existing Drainage line and Storm Water Line at diff roads in S.G.highway to SP ring road area and Bopal area and diff area in bodakdev ward NWZ.(ARC)
Erection of 66KV equipment, structures, control wiring, yard Lighting, Control-Room Electrification & CCTV Installation etc at 66KV Hirapur-II S/S and 01 No 66KV Feeder bay at 66KV Hirapur S/S.
Erection of 66KV SS equipment, structures, control wiring, yard Lighting, Control-Room with CCTV, staff Quarter Electrification etc at Proposed 66kV Trambo SS, Ta:- Rapar, Dist:- Kutch (Work Under Anjar Construction Division).
CCTV Desilting Work of Existing Drainage line and Strome Water Line at diff roads in S.G.highway to SP ring road area and Bopal area and diff area in bodakdev ward NWZ.(ARC)
Erection of 66KV SS equipment, structures, control wiring, yard Lighting, Control-Room with CCTV, staff Quarter Electrification etc at Proposed 66kV University SS Ta:- Bhuj, Dist:- Kutch (Work Under Anjar Construction Division).
Unmanaged L2 Ethernet Switch (PoE) (Q2), Ethernet Cables (Q2), Camera for CCTV System (V3) (Q2), Video Recorder for CCTV System (V2) (Q2) (3 (3 ))
Unmanaged L2 Ethernet Switch (PoE) (Q2), Ethernet Cables (Q2), Camera for CCTV System (V3) (Q2), Video Recorder for CCTV System (V2) (Q2) (3 (3 ))
Unmanaged L2 Ethernet Switch (PoE) (Q2), Ethernet Cables (Q2), Camera for CCTV System (V3) (Q2), Video Recorder for CCTV System (V2) (Q2) (3 (3 ))
CCTV Desilting Work of Existing Drainage line and Storm Water Line at bodakdev village,isckon ambli road connected area,Rajpath rangoli road connected area and diff roads in S.G.highway to SP ring road area and diff area in bodakdev ward NWZ.
Erection of 66KV SS equipment, structures, control wiring, yard Lighting, Control-Room with CCTV, staff Quarter Electrification etc at Proposed 66kV Vadala SS and 2 nos of Feeder bay at 220kV Mokha SS, Ta:- Mundra, Dist:- Kutch (Work Under Anjar Construction Division).
Erection of 66KV equipment, structures, control wiring, yard Lighting, Control-Room Electrification & CCTV Installation etc at 66KV Zank S/S & 02 Nos of 66KV Feeder bay at opposite end i.e 66KV Kadadara S/S and 66KV Vehlal S/Sunder Nadiad construction division office under Nadiad TR circle.
Leasing In of Residential Properties - Housing; Wet Lease (maintenance to be borne by lessor); 1/2/3 BHK; 0-10 years; any; Ground Floor; Electricity back-up, CCTV facility, Streetlights near the building; Yes; No; No; 3000 sqft
Construction of 150 Bedded Hospital for ESIC at Kalol, Gandhinagar, Gujarat. Sh: Planing, Designing and construction of buildnigs including internal water supply, sanitary installation and Drainage, Development work like UG sumps Terrace water Tanks, ... System, CCTV , ...