Loading…
Loading…
6,299 results • Best match
Operation and maintenance of 28 nos. Integrated water supply scheme including supply of chemical, Micron cartridge filter and other consumable in Hingalganj Block under Barasat Division, PHE Dte
INSTALLATION OF LIGHTING ARRANGEMENT WITH ENERGY EFFICIENT LED LIGHT FITTINGS and ALLIED ELECTRICAL WORKS AT BENGAL CHEMICAL METRO STATION TO BELIAGHATA CROSSING (E.M. BYEPASS) UNDER BR-III, KMC
INSTALLATION OF LIGHTING ARRANGEMENT WITH ENERGY EFFICIENT LED LIGHT FITTINGS and ALLIED ELECTRICAL WORKS AT HUDCO MORE TO BENGAL CHEMICAL METRO STATION (E.M. BYEPASS) UNDER BR-III, KMC.
Day to day Operation and Maintenance of 34 MGD Capacity Water Treatment Plant at Dongaria including supply of required chemicals with deployment of requisite manpower under Surface Water based Water Supply Scheme
Supply of chemicals and glassware for the 15 (fifteen) nos. of water testing laboratories in the district of South 24 Parganas under Alipore Division, PHE Dte for the period of 365 days.
Supply of Plant Protection Chemicals Thiomethoxum 12 point 6 percent plus Lamda Cyhalothrin 9 point 5 percent ZC at different block of Nadia District Each Packet size should be 100 ml RKVY
Supply and delivery of water quality parameter testing Chemicals, Reagents, Consumables and Glassware for 19 laboratories for the period of 6 months under Murshidabad Division, PHE Dte. in the District of Murshidabad.
Repairing of damages at Panagarh-Silampur road (between Ch. 2.5 km to 3.5 km) caused by Matrix Fertilizers and Chemicals Ltd. for repairing of underground pipe line under Durgapur Highway Sub-Division
Electro mechanical works
Electro mechanical works
Repairing and painting of Over Head Reservoir (Capacity 45 Cum., staging height 20 Mtr.) including by pass arrangement, guard room, chlorine room, pump house, CWR and boundary wall with other allied works for Augmentation of Mukutmanipur, Khatra
Construction of 01 (one) nos. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site Augmentation of Gosaba (Zone-II) W/S Scheme, Block-Gosaba (Pump House No.-X).
Construction of 01 (one) nos. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site Augmentation of Gosaba (Zone-II) W/S Scheme, Block-Gosaba (Pump House No.-VI).
Const of Chlorine Room, Approach road, Cable Trench,Beautification and allied works at Ashoknagar G.L.R sites Ws scheme for arsenic affected areas of Habra-Gaighata adjoining moujas in the district North 24Parg under Barasat Divi P.H.E Dte
Paschim Purnopara Zone - II PWSS to accommodate Construction of Pump House cum Chlorine Room (5.90m 4.1m with sanitary and Water Supply Arrangement) 1 no Pump House (4.10m 3.5m without sanitary and Water Supply Arrangement) 2nos, Construction of
Construction of 250 Cum. capacity OHR (20 mtr. staging height), Boundary Wall, Pump house cum Chlorine Room along with Laying of Distribution System .. for Augmentation of RAJPUR KORABEG MOUZA Piped Water Supply Scheme of JOYNAGAR-I Block
Laying of Rising main , Distribution System, FHTC, construction of OHR (Capacity 1250 cum), Sinking of Tube Well , and Construction of Pump house cum chlorine Room , Boundary wall and approch road for Augmentation of Lalgola Zone -III PWSS
Transportation of Chlorine Baby Cylinder from different Water Supply Scheme and O.H.R. Sites to Searsole Boosting Station and return back the filled Cylinder to same O.H.R. Sites and Water Supply Scheme Under Asansol Mechanical Division, P.H.E. Dte.
Construction of 5.40 Mtr. X 3.60 Mtr. Switch Room cum Chlorine Room with WC and Bath for 1st Tube well cum Head Works Site of Nona Madhabchak Water Supply Scheme within KSD under Midnapore Division PHE Dte.
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room at Pump House No. 2 of Tulshihatta Zone-II Piped Water Supply Scheme under Harishchandrapur-I Block under Malda Division, PHE Dte, Govt. of West Bengal.
Augmentation of Teghari zone II PWSS Construction of 500 Cum OHR with subsoil investigation, Construction Pump House cum Chlorine Room (5.90m 4.1m with sanitary and Water Supply Arrangement) (1no) Pump House (4.10m 3.5m without sanitary and Wate
Construction of 5.40 mtr.X 3.6 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work Site of JIBJALSAR Water Supply Scheme at Gazole Block of Malda District under Malda Division, PHE Dte.
Sinking of 250 X 200 mm Dia deep tubewell , 250 CuM capacity CWR, Pump/Chlorine room Distribution System (Zone-I and II) FHTC and different works SAHAPUR its adjoining mouzas ws scheme under BIRBHUM Division, PHE Dte
Const. of 250 CuM. capacity OHR with Soil Investigation, 5.90mX4.10m Pump/Chlorine room with sanitary arrangements Laying of Rising Main,Distribution System with FHTC incl. diff. works to RAMKRISHNAPUR PIPED WS SCHEME within Birbhum Divi.,PHE Dte
Construction of Pump House (Switch Room cum Chlorine Room) with Sanitary and Water Supply arrangement (size 5.40 m x 3.6 m) for augmentation of Kotulpur Water Supply Scheme under Bishnupur Sub Division of Bankura Division P.H.E. Dte.
Construction of (3.60 Mtr. X 3.00 Mtr.) Switch Room cum Chlorine Room with water supply sanitary arrangement including Plinth Protection at 3rt Tube Well site of Natshal Lakshya Zone-I Water Supply Scheme within Mahishadal Dev. Block
Construction of 01 (one) nos. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site Augmentation of Gosaba (Zone-II) W/S Scheme, Block-Gosaba (Pump House No.-XI).
Construction of switch room cum chlorine room with sanitary and water supply arrangement including plinth protection at PH No.-1 for Augmentation of Chandpur w/s scheme (Z-I), Hasnabad block under Hasnabad Sub-Division, P.H.E. Dte
Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site ......... for SEHARA its Adjoining Mouza W.S Scheme, Block -Raina-I within Burdwan Sub-Division, PHE Dte. (Mouza- Sehara) (2nd Call)
Construction of 01 (one) nos. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site Augmentation of Gosaba (Zone-II) W/S Scheme, Block-Gosaba (Pump House No.-VIII).
Land development, Construction of Office cum Guard room and Switch cum Chlorine Room, Boundary wall, Surface drain and related allied works at Nakpul including Laying Distribution of Zone-XVIII under Habra-I Block under Barasat Division, PHEDte
Construction of (3.60 Mtr. X 3.00 Mtr.) Switch Room cum Chlorine Room with water supply sanitary arrangement including Plinth Protection at 3rt Tube Well site of Natshal Lakshya Zone-II Water Supply Scheme within Mahishadal Dev. Block
Laying of Rising main , Distribution System, FHTC, construction of OHR (Capacity 450,400,250 cum), Reparing of existing OHR, Sinking of Tube Well , Reparing of pump house and boundary wall, and Construction of Pump house cum chlorine Room , Boun
Repairing of Switch room cum chlorine room with sanitary and water supply arrangement P.H-3 and Clearing compound premises, making temporary earthen road for Banpas and its adjoining mouzas water supply scheme under Durgapur Sub-Division, PHE.Dte.
Construction of Pump House (Switch Room cum Chlorine Room) with Sanitary and Water Supply arrangement (size 5.0 m x 4.0 m) for Bishnupur District Hospital Water Supply Scheme under Bishnupur Sub Division of Bankura Division P.H.E. Dte.
Laying of distribution system, Construction of Office cum Guard room, Land development and Switch cum Chlorine Room,Boundary wall,Surface drain and related allied works at Barnaberia of Zone-XXVIII under Gaighata Block under Barasat Division, PHE
Carrying out preventive as well breakdown maintenance of automatic chlorine machine for ascertaining disinfection of different piped water supply schemes of Tamluk, Sahid Matangini, Panskura, Nandigram-I and II Block in the dist of Purba Medinipur un
Repairing and renovation of Switch Room cum Chlorine Room at 2nd Tube Well site and Boundary Wall at Head Work site of Anantapur Zone-II Water Supply Scheme under Tamluk Sub-Division of Tamluk Division, PHE Dte.
Carrying out preventive as well as breakdown maintenance of automatic chlorine machines for ascertaining disinfection of different piped water supply scheme of Contai-I and Ramnagar-II Block in the Dist. of Purba Medinipur under Midnapore Mechanical
Carrying out preventive as well as breakdown maintenance of automatic chlorine machines for ascertaining disinfection of different piped water supply scheme of Contai-II and III Block in the Dist. of Purba Medinipur under Midnapore Mechanical Divisio
Carrying out preventive as well as breakdown maintenance of automatic chlorine machine Hydraulic Diaphram based or other for ascertaining disinfection of different piped water supply schemes of Chandipur, Moyna and Mahishadal block in the dist. of Pu
Construction of Pump House Cum Chlorine Room with boundary wall at 2nd Tube Well Site of ANDULBERIA ZONE-II PWSS under Jal Jeevan Mission within Beldanga-II Block under Berhampore Division -I, PHE.Dte.in the district of Murshidabad.
Sinking of deep tubewell , Pump, Chlorine room with sanitary arrangnts, 350,300,250 CuM capacity OHR for Zone-I,IIand III,300 CuM CWR,Laying distribution Providing FHTC ws scheme at DAKHALBATI its adjoining mouzas under BIRBHUM Divn, PHED
Const of 5.90 m X 4.10 m Pump Chlorine room with sanitary arrants, Boundary wall, Land development, Laying distribution, road restoration and Providing FHTC AUGMENTATION OF MARGRAM and adjoining Mouzas ws scheme under BIRBHUM Division,PHE Dte
Repairing Renovation of Switch Room cum Chlorine Room at 1st Tube Well site 2nd Tube Well site of Rangibasan Water Supply Scheme within Mahishadal Dev. Block under Haldia Sub Division of Tamluk Division, PHE Dte. Purba Medinipur.
Repairing and Renovation of boundary wall, guard room, chlorine room, drain, pathway and anciliary works at Tank No-14 within AA-II premises area under New Town Kolkata W/S Division-I, P.H.E. Dte. Sl. No. 02
Transportation of Chlorine Baby Cylinder from different Water Supply Scheme and O.H.R. Sites to Searsole Boosting Station and return back the filled Cylinder to same O.H.R. Sites and Water Supply Scheme under Asansol Mechanical Division, P.H.E. Dte.
Const. of 300 CuM. capacity OHR with Soil Investigation, 5.90mX4.10m Pump/Chlorine room with sanitary arrangements Laying of Rising Main, Distribution System with FHTC incl. diff. works related to DASKALGRAM PIPED WS SCHEME within Birbhum Divi.,PHED
Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Netra W/S Scheme, Block - Canning-II. (Pump House No. V) (2nd Call)
Construction of 01 (one) nos. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site Augmentation of Gosaba (Zone-II) W/S Scheme, Block-Gosaba (Pump House No.-VII).