Loading…
Loading…
6,299 results • Best match
Construction of 01 (one) nos. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site Augmentation of Gosaba (Zone-II) W/S Scheme, Block-Gosaba (Pump House No.-I).
Repairing and painting of Over Head Reservoir (Capacity 400 Cum., staging height 20 Mtr.), CWR, Pump House cum Chlorine Room and Construction of Boundary Wall and Guard Room with all allied works of Augmentation works for Dhanara
Construction of 01 (one) nos. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site Augmentation of Gosaba (Zone-II) W/S Scheme, Block-Gosaba (Pump House No.-V).
Construction of 250,150 CuM. capacity OHR Pump room/ Chlorine room with sanitary arran. with FHTC including different works related to SANTOSHPUR / NAWADA PALANDI/ PAPURI/SAJNOR/ RAYEN PIPED WS SCHEME (5 Nos Scheme) within Birbhum Division,PHE DTE
Construction of Pump House Cum Chlorine Room with boundary wall at 2nd Tube Well Site of KASBAGOAS ZONE - II PWSS under Jal Jeevan Mission within Raninagar -I Block under Berhampore Division -I, PHE.Dte.in the district of Murshidabad.
Construction of 01 (one) nos. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site Augmentation of Gosaba (Zone-II) W/S Scheme, Block-Gosaba (Pump House No.-XII).
Construction of 150 CUM capacity OHR,including Soil Investigation, 5.09mX4.1 m Pump House,Chlorine Room with Sanitary...Laying of Rising Main and Distribution System FHTC and const.Boundary Wall...Ulandi PIPED WS SCHEME within Birbhum Divn, PHE Dte
Construction of 1 (one) no. switch room cum chlorine room 4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Harekrishnapur Water Supply Scheme , Block - Basanti under Alipore Division, PHE Dte.(PH- III)
Const. of 200 CuM. capacity OHR with Soil Investigation, 5.90mX4.10m Pump/Chlorine room with sanitary arrangements Laying of Rising Main, Distribution System with FHTC incl. diff. works related to FEUGRAM PIPED WS SCHEME within Birbhum Division,PHED
Construction of 2 Nos. OHR .. Pump House cum Chlorine Room (7 nos.), Boundary Wall along with Laying of Distribution System .. for Augmentation of TILPI (ZONE-I), TILPI (ZONE-II), KHAKURDAHA, DHOSA Mouza PWSS of JOYNAGAR-I Block
Augmentation of Barabil Raghunathpur Zone-II PWSS to accommodate Construction of Pump House cum Chlorine Room (5.90m 4.1m with sanitary and Water Supply Arrangement) 1 no Pump House (4.10m 3.5m without sanitary and Water Supply Arrangement) 1no,
Construction of 01 (one) nos. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site Augmentation of Gosaba (Zone-II) W/S Scheme, Block-Gosaba (Pump House No.-XIII).
Construction of 5.40 mtr.X 3.6 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work Site of RAJARAMCHAK Water Supply Scheme at Englishbazar Block of Malda District under Malda Division, PHE Dte.
Const of Pump,Chlorine room with sanitary arrangts,200 CuM OHR, Boundary wall, Soil Investigation, Land development,Rising main,Laying distribution,Providing FHTC connection related to WS scheme at CHHORA its adjoining mouzas under BIRBHUM Divn,PHED
Construction of Pump House Cum Chlorine Room with boundary wall at 3rd Tube Well Site of MUKTARPUR ZONE - II PWSS under Jal Jeevan Mission within Raninagar -I Block under Berhampore Division -I, PHE.Dte.in the district of Murshidabad.
Construction of 5.40 Mtr. X 3.60 Mtr. Switch Room cum Chlorine Room with water supply and sanitary arrangement for Head work site Tube well of Dhaneswarpur Water Supply Scheme in Pingla Block under Midnapore Division PHE Dte.
Construction of 5.40 mtr.X 3.6mtr Switch Room cum chlorine room with Water Supply and sanitary arragement at Head Work site of DAUDPUR its adjoining mouza Water Scheme under Malda Division,PHE Dte. In the District of Malda.
Sinking of 2 nos. deep Tubewell...Laying of DI rising main...Construction of switch cum chlorine room with sanitary... Providing FHTC... Protection works ...Construction of 150 cum capacity CWR...of Chaital WS scheme... under Hasnabad Sub-Divis
Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Harekrishnapur Water Supply Scheme , Block - Basanti under Alipore Division, PHE Dte.(PH- IV)
Construction of 5.40 mtr.X 3.6 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work Site of DILALBATI Water Supply Scheme at Gazole Block of Malda District under Malda Division, PHE Dte.
Construction of 1 (one) no. switch room cum chlorine room (4.88x3.66m) including Sanitary arrangement as per departmental drawing at the site of Parbatipur Water Supply Scheme, Block-Basanti under Canning Sub-Division, PHE Dte. (PH No.-III)
Laying of DI rising main, distribution pipe line, Providing FHTC...Const.of 250cum capacity RCC Over Head Reservoir.Const. of switch room cum chlorine room with sanitary water supply arrangement for Khariberia WS scheme under Hasnabad Sub-Divn,PHED
Laying Distribution System,Rising Main Connection, Construction of OHR (Capacity 600 and 350 cum) ,Pump house cum chlorine Room , Boundary wall, Office cum Godwan, approch road and Pushing of casing pipe by Hydraulic Jacking Technique method across
Laying distribution System, Accommodate FHTC (1012 nos) Construction of Switch Room cum Chlorine Room I , II and Interconnection of Risisng main with allied works under JJM for Ramchandrapur and its Adjoining Mouzas PWSS in Moyna Block including
Construction of 5.40 mtr.X 3.6 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work Site of JIGIN Water Supply Scheme at Gazole Block of Malda District under Malda Division, PHE Dte.
Construction of 01 (one) nos. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site Augmentation of Gosaba (Zone-II) W/S Scheme, Block-Gosaba (Pump House No.-IV).
Construction of Pump House (Switch Room cum Chlorine Room) with Sanitary and Water Supply arrangement (size 5.40 m x 3.6 m) for Augmentation of Joypur Water Supply Scheme under Bishnupur Sub Division of Bankura Division P.H.E. Dte.
Paschim Purnopara Zone - I PWSS to accommodate Construction of Pump House cum Chlorine Room (5.90m 4.1m with sanitary and Water Supply Arrangement) 1 no Pump House (4.10m 3.5m without sanitary and Water Supply Arrangement) 2nos, Construction of
Const. of 200 CuM. capacity OHR with Soil Investigation, 5.90mX4.10m Pump/Chlorine room with sanitary arrangements Laying of Rising Main, Distribution System with FHTC incl. diff. works related to MADDA PIPED WS SCHEME within Birbhum Division, PHED
Charges for Carrying of empty tonners from Different Gaseous Chlorination Plant under Malda Arsenic Area W/S Scheme (Northern and Southern Sector) and Balupur Water Supply Scheme to authorized chlorine filling station as per availability and returnin
Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Siteto departmental drawing ......... PALASON its Adj. Mouza WS Scheme, Block-Raina-I,within Burdwan Sub-Division, PHE Dte. Mouza- PASCHIM PARA.
Construction of 1 (one) no. Switch Room cum Chlorine Room (4.88 m x 3.66 m) including sanitary arrangement as per departmental drawing at the site of Chunakhali Water Supply Scheme (Zone-I), Block-Basanti. (P.H. No.-3)
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room corresponding to Tube Well No 2 at BHALUKA FATEPUR Piped Water Supply Scheme under Harishchandrapur-I Block under Malda Division, PHE Dte, Govt. of West Bengal.
Sinking of 2 nos. deep Tubewell...Laying of DI rising main...Construction of switch cum chlorine room with sanitary... Providing FHTC... Protection works ...Construction of 150 cum capacity CWR...of Bamanpukuria ws scheme... under Hasnabad Sub-Divis
Construction of 01 (one) nos. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site Augmentation of Gosaba (Zone-II) W/S Scheme, Block-Gosaba (Pump House No.-III).
Construction of 01 (one) nos. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site Augmentation of Gosaba (Zone-II) W/S Scheme, Block-Gosaba (Pump House No.-IX).
Construction of 01 (one) nos. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site Augmentation of Gosaba (Zone-II) W/S Scheme, Block-Gosaba (Pump House No.-II).
Carrying out preventive as well as breakdown maintenance of automatic chlorine machine for ascertaining disinfection of different piped water supply schemes of Tamluk, Sahid Matangini, Panskura, Nandigram I and II block in the dist. of Purba Medinipu
Carrying out preventive as well as breakdown maintenance of chlorine machines ( Hydaulic Diaphragm based or other ) for ascerting disinfection of different rural piped water supply schemes at MAL, MAYNAGURI Block Block in the dist of JALPAIGURI. Un
Carrying out preventive as well as breakdown maintenance of automatic chlorine machines for as certaining disinfection of different piped water supply scheme of Pingla, Salboni and Midnapore Sadar Block in the Dist. Of Paschim Medinipur under Midnapo
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Parameswarpur Piped Water Supply Scheme at Bamangola Block of Malda District under Malda Division,
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room corresponding to Tube Well No 2 at ALAL ZONE-III Piped Water Supply Scheme under Gazole Block under Malda Division, PHE Dte, Govt. of West Bengal.
Construction of Boundary Wall, Pump House cum Chlorine Room along with Laying distribution, Rising main, Functional Household Tap Connection (FHTC) for PASCHIM MADHABPUR PWSS of BARUIPUR Block for Augmentation of surface water based W/S scheme in
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Amtali W/S Scheme (Zone-II), Block - Gosaba under Canning Sub-Division, PHE Dte.
Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing... for AJHAPUR its Adjoining Mouza WS Scheme, Block -Jamalpur within Burdwan Sub-Division, PHE Dte. (Mouza- SALMULA)
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Amtali W/S Scheme (Zone-I), Block - Gosaba under Canning Sub-Division, PHE Dte.
Construction of 01 no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at Amlamethi Water Supply Scheme, Block-Gosaba under Canning Sub-Division of Alipore Division, PHE Dte. (2nd Call)
Providing FHTC all complete with Laying of Distribution System ...Construction of Boundary Wall, Chlorine Room, and Approach Road ....Repair of 450 cum capacity Over Head Reservoir Painting and Pump House..for Baganchara...under NAD-I,PHE Dte
Sub-Soil investigation, Design, Engineering, Supplying Construction of Electrical Sub-Station building and Construction of Chlorine room within the WTP site and Electrical substation building near Intake of 51 MLD capacity Surface Water Based W/S s
Electro mech works