Loading…
Loading…
6,299 results • Best match
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Sailpur Piped Water Supply Scheme at Englishbazar Block of Malda District under Malda Division, PHE
Supply and delivery of 100kg empty chlorine cylinder at site for HIRBANDH IBS of Khatra, Hirbandh,Ranibandh Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under Khatra Block,Dist- Bankura under Bankura Mechanical Division P.H.E. Dte
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Goranbose W/S Scheme, Block-Basanti under Canning Sub-Division, PHE Dte.(PH No. - 4)
Repairing and renovation of switch room cum chlorine room (5.4m x 3.6m) with boundary wall and plant machineries painting at Gosaba Pond Base W/S Scheme, under Gosaba Block of Canning Sub-Division of Alipore Division, PHE Dte.
Carrying out preventive as well as breakdown maintenance of automatic chlorine machines for ascertaining disinfection of different piped water supply scheme of Ramnagar-I and Egra-I Block in the Dist. of Purba Medinipur under Midnapore Mechanical Div
Supply and delivery and installation of Sign Board for displaying Pump House details including proper dosing of chlorine at different WS Schemes under Matiali Jalpaiguri Sadar and Rajganj Block in the dist of Jalpaiguri under NMD PHE Dte
Laying of DI rising main..Providing FHTC..Protection works for different dia.UPVC/DI distribution pipeline ..Const. of 200 cum capacity OHR...Const. of switch room cum chlorine room..for Bargan Gopalpur W/S scheme , under Hasnabad Sub-Division,
Construction of OHR (1600 cum capacity),Guard Room, Chlorine Room, Boundary Wall, Internal Road, Laying of distribution system at mouja Keutia of Zone-XXXI for arsenic affected areas of Habra-Gaighata and adjoining moujas under Barasat Division,PHED
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Srinagar W/S Scheme, Block-Canning-II under Canning Sub-Division, PHE Dte. (PH-4).
Construction of switch room cum chlorine room with sanitary and water supply arrangement including plinth protection at PH No.-1 and PH No.-2 within Rampur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte.
Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental for PALSIT its Adj Mouza W/S Scheme, Block -Bardhaman-II within Burdwan Sub-Division, PHE Dte. (Mouza- KARANA)
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Dakshin Brindabanbati Piped Water Supply Scheme at Habibpur Block of Malda District under Malda Div
Charges for Carrying of empty tonners from Different Gaseous Chlorination Plant under Malda Arsenic Area W/S Scheme (Northern and Southern Sector) and Balupur Water Supply Scheme to to authorised chlorine filling station as per availability and retur
Construction of 1 (one) no. switch room cum chlorine room (4.88m.x3.66m) including Sanitary arrangement as per departmental drawing at the Site of Choto Mollakhali Water Supply Scheme (Zone-II), Block-Gosaba under Alipore Division, PHE Dte. (PH-IV)
Charges for Carrying of empty baby cylinder (0.1 MT capacity) from Different Distribution Zone under Malda Arsenic Area W/S Scheme (Southern Sector) within Kaliachak-I Block to authorized chlorine filling station as per availability and returning bac
Laying of Rising main , Distribution System, FHTC, construction of OHR Capacity 200 cum, Sinking of Tube Well , and Construction of Pump house cum chlorine Room , Boundary wall and approch road for Augmentation of Basuvevpur Zone-II PWSS i
Repairing renovation of Construction of Switch Room cum Chlorine Room with water supply sanitary arrangement (as per Deptt. drawing) at 1st 2nd tube well site of Dakshin Gumai Water Supply Scheme under Tamluk Sub Division of Tamluk Division,
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Dahara Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Divisio
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at 2nd Tube Well site. of RAJARAMCHAK Water Supply Scheme at Gazole Block of Malda District under Malda Division, PHE Dte.
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Uttar Kumedpur Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda
Construction of Pump House (Switch Room cum Chlorine Room) with Sanitary and Water Supply arrangement (size 5.0 m x 4.0 m) for INDAS Water Supply Scheme wihin Indas block under Bishnupur Sub Division of Bankura Division P.H.E. Dte.
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Dakshin Gouripur Piped Water Supply Scheme at Harishchandrapur-I Block of Malda District under Mald
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Moukhali W/S Scheme, Block-Canning-I under Canning Sub-Division, PHE Dte. (PH-6).
Carrying out preventive as well as breakdown maintenance of automatic chlorine machines for ascertaining disinfection of different piped water supply scheme of Contai-I,II and III Block in the Dist. of Purba Medinipur under Midnapore Mechanical Divi
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Sadlichak Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Divi
Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing... for SAGRAI its Adjoining Mouza W/S Scheme, Block -Khandaghosh within Burdwan Sub-Divn, PHE Dte. (Mouza- Jubila)
Construction of switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Dhuri W/S Scheme, Block - Basanti under Canning Sub-Division. PHE Dte.(PH No.-I)
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site for Retrofitting of Char Baidyarabad W/S Scheme, Block-Basanti under Canning Sub-Divn, PHE Dte. (2nd Call)
Supply delivery and installation of Sign Board for displaying Pump House details including proper dosing of chlorine at different W/S Schemes under Dhupguri and Banarhat Block in the dist. of Jalpaiguri under Northern Mechanical Division PHE Dte
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Daria W/S Scheme, Block-Canning-I under Canning Sub-Division, PHE Dte. (PH-5).
Charges for Carrying of empty tonners from Water Treatment Plant (Capacity of 8.01 MLD) of Sub surface water based piped water supply scheme at Gangarampur Western Sector to authorised chlorine filling station as per availability and returning back
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Singheswar W/S Scheme, Block-Canning-II under Canning Sub-Division, PHE Dte. (PH-3).
Construction of switch room cum chlorine room with sanitary and water supply arrangement including plinth protection at PH No.-1 and PH No.-2 within Daudpur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte.
Construction of OHR, chlorine room, service road, repairing of boundary wall, store room, and restoration of bituminous road, land improvement etc. of Surface Water Based Water Supply Scheme for Zone- V / A (Northern Sector Part-II) in Nakashipara.
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Chimta W/S Scheme (Zone-I), Block - Gosaba under Canning Sub-Division. PHE Dte.(PH No.-II)
Construction of 5.40 mtr.X 3.6mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work site of MIANAGAR Water Supply Scheme of Habibpur Block under Malda Division, PHE Dte. in the District of Malda.
Sinking deep tubewell , Pump, Chlorine room with sanitary arran.350,300,150 CuM capacity OHR. 300 CuM CWR, and Soil Investigation, Laying distribution..Zone-I,II,III , Providing FHTC related to ws scheme AYAS its adj.mouzas under BIRBHUM Divn,PHEDte
Sinking of 250mm.X 150mm.Dia Tubewell (2 nos) Drilling by Direct Rotary method ,Const of Chlorine room with sanitary arrangements, 150 CuM OHR, Boundary wall, Soil Invest..Providing FHTC related to WS at Tilai..under BIRBHUM Division, PHE Dte
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Narayanpur W/S Scheme, Block-Canning-II under Canning Sub-Division, PHE Dte. (PH-4).
Construction of Pump House Cum Chlorine Room with boundary wall at 2nd Tube Well Site of RAMPARA FARIDPUR ZONE - II PWSS under Jal Jeevan Mission within Beldanga-II Block under Berhampore Division -I, PHE.Dte.in the district of Murshidabad.
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Atharabeki W/S Scheme, Block-Canning-II under Canning Sub-Division, PHE Dte. (PH-5).
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at 2nd Tube Well site. of DILALBATI Water Supply Scheme at Gazole Block of Malda District under Malda Division, PHE Dte.
Augmentation of Ground Water Based Loknathpur zone-I PWSS to accommodate FHTC of 922 nos household Laying Rising Main ,Construction Pump House cum Chlorine Room (5.90m 4.1m with sanitary and Water Supply Arrangement) Pump House (4.10m 3.5m with
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Homrapolta W/S Scheme, Block-Canning-II under Canning Sub-Division, PHE Dte. (PH-3).
Laying of DI rising main,distribution pipe line, FHTC Construction of 150 cum capacity CWR...Construction of switch room cum chlorine room with sanitary, water supply arrangement for Phulbari Abad WS scheme under Hasnabad Sub-Division, PHE Dte
Allied work for Construction of Boundary Wall, Chlorine room cum Operator shed, Land Development Service Road at Head Work Site of Bhurkunda (Zone-XII) under Balia Surface Based Water Supply Scheme of Jangipur Sub Division under Murshidabad Divisi
Construction of switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Bibir Abad W/S Scheme, Block - Canning-II under Canning Sub-Division, PHE Dte. (PH No.-I)
Construction of switch room cum chlorine room with sanitary and water supply arrangement including plinth protection at PH No.-1 and PH No.-2 within Sukhdoani w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte.
Construction of Chlorine cum Switch Room Guard Room with sanitary and plumbing arrangment with approach road, plinth protection, surface drain, Land development etc. complete at Joypur OHR Site,of Joypur W/S Scheme under Purulia Sadar Sub-Division
Sinking of deep tubewell, Chlorine room with sanitary arrangements.. 300,150 CuM OHR,200 Cum CWR...Boundary wall with Gate, Soil Inves., Rising main, Laying dis. road restoration, Providing FHTC at Bautia WS Scheme under BIRBHUM Division, PHE Dte