Loading…
Loading…
6,300 results • Best match
Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing... for SHYAMSUNDAR its Adjoining Mouza WS Sch, Block -Raina-I within Burdwan Sub-Divn, PHE Dte. (Mouza- Gopinathpur)
Laying of HDPE Pipe line, Construction of Pump House cum chlorine room, Construction of Pump House and Toilet at head work site and Boundary wall under Augmentation of BARJORA Water Supply Scheme (Left out mouzas of Barjora Block
Laying Distribution System, Providing FHTC, Const.of Office cum Guard room, Land development and Switch cum Chlorine Room, Boundary wall, Surface drain at Zonal Head work site Z-VI under Habra-Gaighata surface based PWSS under Barasat Division, PHED
Sinking of 150 mm X 100 mm Dia deep tubewell, const.100 CuM capacity OHR with soil Investigation, Pump,Chlorine room ..... FHTC and different works related to SEKUPUR and adjoining mouzas WS scheme under BIRBHUM Division, PHE Dte.
Annual maintenance of pipeline pipeline track from near Pipli Dara to Algarah Pedong Army establishments including operation of pressure filter at Algarah 20th Mile and 21st Mile including chlorine dosing for the period of 365 Days under NKWSMD,
Carrying out preventive as well as breakdown maintenance of automatic chlorine machines for ascertaining disinfection of different piped water supply scheme of Dantan-I, Dantan-II and Mohanpur block in the dist of Paschim Medinipur under Midnapore Me
Electro mechanical works
Electro mechanical works
Electro mechanical works
Hydrochloric acid, Nitric Acid, Sodium Hydroxide, Potassium Hydroxide, Ammonium Thiocyanate, Sodium Carbonate, Carbon Tetrachloride, Furfural, Pet. Ether 60- 80 C, Toluene Rectified, Chloroform, Potassium Chromate Indicator, Ferric Ammonium Sulphate ... Anhydrous, Sulphuric Acid , ...
O and M of 9.8 MLD WTP, 0.512ML CWR and 500 Kva substation at Cooch Behar Municipal area for the period of 36 months including supply of all materials to be used daily like Cl, Alum, etc. and Guarding of WTP campus round the clock.
ANNUAL RE-TENDER(4th CALL) FOR ERECTION OF PANDAL, STAGE, FURNITURE, SITTING ARRANGEMENT, DECORATION, CHEMICAL TOILET ETC. ON HIRE BASIS I.C.W THE VARIOUS PROGRAMME OF KOLKATA POLICE IN DIFFERENT PLACES
Non-Destructive test of reinforced concrete member including concrete strength, corrosion of reinforcement and damage due to chemical attack at Jalasampad Bhawan, Block-DF, Sector-I, Salt Lake, Kolkata-700091
Net Work Monitoring of water level and collection of water samples for chemical analysis in the District of Purba Burdwan for 187 nos PHS for the year 2025 to 2026
Payment for Enhance Monthly Remuneration of District laboratory for Physical Chemical and Bacteriological Test of Water Sample under Siliguri Water Supply Scheme, Dist. Darjeeling under Siliguri Water Supply DivisionP.H.Engineering Dte
Replacement of miscellaneous defective electrical accessories at Chemical House and its adjoining State Referral Laboratory of Dakshin Roypur water supply project 34MGD under South 24-Pgs Mechanical Division, PHE Dte.
Repair and renovation modification and Electrification at Filter House, Chemical House and Guard room at Mathurapur WTP Northern Sector in the district of Malda under Malda Mechanical Division, PHE Dte.
Procurement of 41 nos. of Analytical Reagent for testing operational parameter for Chemical Labratary and SWAS of Make- Merck or Fisher Scientific or Rankem for U 1-6, MTPS, DVC.
Chemical Stock register, Brown bopp tape, BOPP transparent packaging Tape, Plastic magnetic Pin clip dispenser, Note Book cover roll, Summer outdoor sun protection cap, Dettol liquid handwash, Thick brown envelops
REPAIR/ MAINT OF MECHANICAL LAUNDRY PLANT, BOILER PLANT AND AUTOCLAVE MACHINE, DRY CLEANING MACHINE WITH SUPPLY OF CHEMICAL SOLUTION INCLUDING OUTSOURCING OF BOILER AT CH (EC) UNDER GE ALIPORE KOLKATA
CONSTRUCTION OF WOMENS TOILET COMPLEX CUM BABY CARE ROOMS UNDER KOLKATAR 10 DIGANTA SCHEME NEAR 33, CANAL CIRCULAR ROAD, NEAR BENGAL CHEMICAL METRO STATION IN WARD NO 32 BOROUGH-II
PLANTATION OF 1500 NOS (ONE THOUSAND FIVE HUNDRED) DEPARTMENTALLY SUPPLIED SAPLINGS INCLUDING 1000 NOS BAMBOO TREE GUARD ALONG E M BYPASS FROM BENGAL CHEMICAL TO BELIAGHATA CROSSING IN BR-III.
REPAIRING OF ROAD DISTURBED BY SEWERAGE AND DRAINAGE DEPTT. AT E. M. BYPASS FROM BENGAL CHEMICAL METRO STATION TO ULTADANGA DRAINAGE PUMPING STATION IN WD NO- 32 UNDER BR- III.
Operation and maintenance of 18 nos. Integrated water supply scheme supply of chemical, Micron cartridge filter and other consumable in Sandeshkhali-I and II Block under Barasat Division, PHE Dte
Thorough Repair and Renovation work at the residential quarter _Block A and B_ from ground to forth floor within the complex of Bengal Excise Chemical Lab_ 46_ Christopher Road_ Kol_700046
REPAIRING AND REPLACEMENT OF WIRINGS, LIGHTS, FANS,IS, PANEL, ETC. ALONG WITH ALLIED ELECTRICAL WORKS AT BENGAL CHEMICAL, DESHBANDHU PARK, B.K. PAL RD.(WD-20) COMPACTOR STATION UNDER SWM/KMC.
REPAIR MAINT OF MECHANICAL LAUNDRY PLANT, BOILER PLANT AND AUTOCLAVE MACHINE, DRY CLEANING MACHINE WITH SUPPLY OF CHEMICAL SOLUTION INCLUDING OUTSOURCING OF BOILER AT CH (EC) UNDER GE ALIPORE KOLKATA
Supply and Delivery of different types of Chemical for Chemistry Laboratory at Pandit Raghunath Murmu Adarsha Abasik Uchha Vidyalaya at Ratulia under Panskura-I Dev. Block in Purba Medinipur District
Hire charges of Bio Chemical toilet with 4 nos attendant 47 days each including Transportation charges with loading and unloading from nearest location to the approved location under Chandannagar SD
Upgradation of bituminous road by Paver blocks from Labony island to E.M. Bye pass Bengal Chemical metro station within ward no. 38 under Bidhannagar Municipal Corporation. (Fund- U.D. M.A Fund)
Construction Of Chemical Room Cum AIRP Room (5.4m X 3.6m) Including Sanitary Arrangemen at Hw Site at Teinpur Zone-IV Water Supply Scheme Under RWS Nadia Sub-Division PHE Dte.
Air Freshener Liquid (V2) (Q3), Air Freshener Solid and Gel (Q4), Stable Bleaching Powder (V2) for Household and Industrial use conforming to IS 1065 (Part 1) (Q3), Sweeping Broom (V3) (Q4), Glass Cleaner, Liquid (V2) as per IS 8540 (Q4), Toilet Cleaner Liquid (V2) conforming to IS 7983 (Q4), Naphthalene (V2) as per IS 539 (Q4), Dishwashing Products (V2) as per IS 6047 (Q4), Toilet Soap as per IS 2888 (V2) (Q4), Toilet Soap, Liquid (V2) as per IS 4199 (Q4), Disinfectant Fluids, Phenolic Type (V3) conforming to IS 1061 (Q3)
Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Hiranmoypur W/S Scheme, Block - Basanti under Canning Sub-Division of Alipore Division, PHE Dte.
Renovation of Pump house, Chlorine room, Office room, Construction of Pathway at existing OHR site of Baragachhia Piped Water Supply Scheme to accommodate FHTC in Sonarpur Block under South 24-Parganas, W/S Division-I, PHE Dte. for Augmentation
Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing... for TALIT its Adjoining Mouza W/S Scheme, Block -Bardhaman-I within Burdwan Sub-Division, PHE Dte. (Mouza- TALIT)
Construction of 1 (one) no. switch room cum chlorine room (4.88x3.66m) including Sanitary arrangement as per departmental drawing at the site of Chunakhali Water Supply Scheme (Zone-II), Block-Basanti under Canning Sub-Division, PHE Dte. (PH No.-IV)
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Mallik Kati W/S Scheme, Block-Canning-II under Canning Sub-Division, PHE Dte. (PH-4).
Construction of 3.6mtr.X 3.0mtr Switch Room cum chlorine room with Water Supply and sanitary arragement at 2nd Tube Well site of Mosimpur Piped Water Supply Scheme under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda.
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Budhkhali W/S Scheme, Block-Canning-I under Canning Sub-Division, PHE Dte.(PH No. - 5)
Construction of 1 (one) no. switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Tilkumar Water Supply Scheme (Zone-I), Block - Basanti under Alipore Division, PHE Dte.(PH- I)
Construction of Office cum Guard room,Switch cum Chlorine Room, Boundary wall,Surface drain allied work Zonal Head work site - XV i.e.Bergum and Providing FHTC Surface WS Scheme Habra-Gaighata and Adjoining Mouzas under Barasat Division,PHE Block -D
Augmentation of Ground Water Based Kodla PWSS to accommodate FHTC of 2000 nos household Laying Rising Main ,Construction Pump House cum Chlorine Room (5.90m x 4.1m with sanitary and Water Supply Arrangement) Pump House (4.10m x 3.5m without sanitar
Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Sambhunagar W/S Scheme, Block - Gosaba under Canning Sub-Division of Alipore Division, PHE Dte.
All Items carriage and delivery of chlorine granulers from month of JANUARY 2025 to MARCH 2025 at different pump houses under Burdwan Sub-Division PHE Dte. from Divisional store at Borsul under Burdwan Sub-Division PHE Dte. within Burdwan
Construction of 1 (one) no. switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Kalugachi Water Supply Scheme, Block- Canning-II under Alipore Division, PHE Dte.(P.H No. I)
Construction of Pump House cum chlorine room and Sinking of 03 (Three) no. 200 mm X 165 mm dia.X 250 mtr. deep Rig bore Tube Well (by DTH Rig machine) with allied works for Augmentation of KENDBONI (Zone - P)
Construction of 3.6mtr.X 3.0mtr Switch Room cum chlorine room with Water Supply and sanitary arragement at 3rd Tube Well site of Alipur Piped Water Supply Scheme under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda
Sinking of 250X150 mm Dia, 150m deep Tubewell. Const of Pump room/Chlorine room with sanitary arrangnts,350 CuM OHR, Boundary wall, Soil Invest, Laying distribution..Providing FHTC, at Mahesha its adjoining mouzas ws scheme under BIRBHUM Div PHEdte
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Bipradaspur W/S Scheme, Block - Gosaba under Canning Sub-Division of Alipore Division, PHE Dte. (Pump House-II)
Laying of DI rising main..Providing FHTC..Protection works for different dia.UPVC/DI distribution pipeline ..Const. of 250 cum capacity OHR...Const. of switch room cum chlorine room..for Bamanpukuria W/S scheme , under Hasnabad Sub-Division, PHE Dt