Loading…
Loading…
6,303 results • Best match
Sinking of 250X150 mm Dia, 150m deep Tubewell. Const of Pump room/Chlorine room with sanitary arrangnts,350 CuM OHR, Boundary wall, Soil Invest, Laying distribution..Providing FHTC, at Mahesha its adjoining mouzas ws scheme under BIRBHUM Div PHEdte
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Bipradaspur W/S Scheme, Block - Gosaba under Canning Sub-Division of Alipore Division, PHE Dte. (Pump House-II)
Laying of DI rising main..Providing FHTC..Protection works for different dia.UPVC/DI distribution pipeline ..Const. of 250 cum capacity OHR...Const. of switch room cum chlorine room..for Bamanpukuria W/S scheme , under Hasnabad Sub-Division, PHE Dt
Construction of 3.6mtr.X 3.0mtr Switch Room cum chlorine room with Water Supply and sanitary arragement at 2nd Tube Well site of Alipur Piped Water Supply Scheme under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda.
Construction of 3.6mtr.X 3.0mtr Switch Room cum chlorine room with Water Supply and sanitary arragement at 3rd Tube Well site of Uttar Jadupur Piped Water Supply Scheme at English Bazar Block under Malda Arsenic Area W/S Division, P.H.E.Dte.
Supply fitting fixing installation testing and commissioning of horizontal end Suction radial split casing chlorine pump having capacity of 29.16 m3/hr discharge at the head of 54.5 meter with 415 volt, three phase TEFC squirrel cage induction motor
Construction of Pump house cum Chlorine room (Two nos) at KHARUPATALIA water supply scheme to accommodate FHTC in BARUIPUR BLOCK under South 24 Parganas W/S Division-I, PHE Dte for augmentation of Surface Water Based Water Supply Scheme
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Adhna Piped Water Supply Scheme at Gazole Block of Malda District under Malda Division, PHE Dte.
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at 2nd Tube Well site. of KHARBA Water Supply Scheme at Chanchal-I Block of Malda District under Malda Division, PHE Dte.
Construction of 5.40 mtr. X 3.60 mtr. Switch Room cum Chlorine room with Water Supply and Sanitary arrangements at Head Work Site of RANGHAT Supply Scheme at CHANCHAL - II Block under Malda Division, P.H.E.Dte. In the district of Malda.
Construction of switch room cum chlorine room with sanitary and water supply arrangement including plinth protection at PH No.-1 and PH No.-2 within Bhangha Tushkhali w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte.
Over all repairing of 5.40 mtr.X 3.60 mtr Switch Room cum chlorine room corresponding to Tube Well No. 2 at BULBULCHANDI Piped Water Supply Scheme at Habibpur Block under Malda Division, PHE Dte, Govt. of West Bengal.(2nd Call)
Repairing of chlorine machine at Napara,TW No.-02 Birudiha, TW No.-02 and other allied Electrical works at various pump house (Gopalpur, Bistupur, Kanchanpur, Kanksa Zone-II/B etc) under Block- Kanksa, Dist- Paschim Bardhaman, Asansol Mechanical Di
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Bhabuk Piped Water Supply Scheme at Habibpur Block of Malda District under Malda Division, PHE Dte.
Construction of 3.6mtr.X 3.0mtr Switch Room cum chlorine room with Water Supply and sanitary arragement at 2nd Tube Well site of Sadipur Piped Water Supply Scheme under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda.
Construction of 01 no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at Amlamethi Water Supply Scheme, Block-Gosaba under Canning Sub-Division of Alipore Division, PHE Dte. PH-III (2nd Call)
Supply delivery and installation of Sign Board for displaying Pump House details including proper dosing of chlorine at different W/S Schemes under Mal Maynaguri and Kranti Block in the dist of Jalpaiguri under Northern Mechanical Division PHE Dte
Laying of proposed Rising main line and inter connection including repairing renovation of switch room cum chlorine room at Head work site of Kapasaria Water Supply Scheme within Mahishadal Dev. Block under Haldia Sub Division of Tamluk Division, P
Construction of 3.6mtr.X 3.0mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Gour-Mahadipur Piped Water Supply Scheme in English Bazar Block under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda.
Construction of 1 (one) no. switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Tilkumar Water Supply Scheme (Zone-I), Block - Basanti under Alipore Division, PHE Dte.(PH- II)
Construction of 5.40 X 3.60 Mtr. and 3.60 X 3.00 Mtr. Switch Room cum Chlorine Room with or without WC and Bath_Laying rising main_Supply of sluice valve for Augmentation of Debra Water Supply Scheme under Midnapore Division PHE Dte.
Construction of 5.40 mtr. X 3.6mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work site of SANJAIL its adjoining mouza Water Supply Scheme under Malda Division, PHE Dte. In the District of Malda.
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Saiyadpur Piped Water Supply Scheme at Old Malda Block of Malda District under Malda Division, PHE
Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Puinjali W/S Scheme, Block - Gosaba under Canning Sub-Division of Alipore Division, PHE Dte
Laying of Rising Main , Distribution System, FHTC, construction of OHR (Capacity 300 100 cum), , Sinking of Tube Well , Reparing of pump house and Construction of Pump house cum chlorine Room , Boundary wall and approch road for Augmentation of Joy
Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Sambhunagar W/S Scheme, Block - Gosaba under Canning Sub-Division of Alipore Division, PHE Dte
Construction of 5.40 mtr.X 3.60 mtr Switch Room cum chlorine room at UTTAR HARISHCHANDRAPUR ZONE-II Piped Water Supply Scheme at Head Work Site under Harishchandrapur-II Block under Malda Division, PHE Dte, Govt. of West Bengal. (3rd Call)
Construction of 1(one) no. switch room cum chlorine room (4.88m. x 3.66m) including Sanitary arrangement as per departmental drawing at the Site of Tilkumar Water Supply Scheme (Untreated Water), Block-Basanti under Alipore Division, PHE Dte. (PH-II)
Laying of Rising Main , Distribution System, FHTC, construction of OHR (Capacity 450 cum), , Sinking of Tube Well , Reparing of pump house and Construction of Pump house cum chlorine Room , Boundary wall and approch road for Augmentation of Nagar Zon
Construction of switch room cum chlorine room, Laying of DI rising main and DI/UPVC distribution pipe line, providing FHTC, Protection works, Construction of 200 Cum capacity RCC OHR for Katakhali WS Scheme, under Hasnabad Sub-Division, PHE Dte.
Repairing renovation of switch Room cum Chlorine Room at 1st Tube Well site 2nd Tube well site of Chaitanyapur Zone-II Water Supply Scheme within Sutahata dev. Block under Haldia Sub Division of Tamluk Division, PHE Dte. Purba Medinipur.
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing on Augmentation of Canning PWSS (Zone-I, II, and III), Block - Canning-I under Canning Sub-Division of Alipore Division, PHE Dte.
Construction of 1 (one) no. switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Tilkumar Water Supply Scheme (Zone-II), Block - Basanti under Alipore Division, PHE Dte.(PH- II)
Construction of 3.6mtr.X 3.0mtr Switch Room cum chlorine room with Water Supply and sanitary arragement at 2nd Tube Well site of Khaschandpur Piped Water Supply Scheme under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda.
Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Chatrakhali Water Supply Scheme Block-Basanti under Alipore Division, PHE Dte. (Pump House No. II)
Construction of 5.40 mtr.X 3.6mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work site of SAIYADPUR Water Supply Scheme of Old Malda Block .under Malda Division, PHE Dte. in the District of Malda.
Construction of 5.40 mtr. X 3.60 mtr. Switch Room cum Chlorine room with Water Supply and Sanitary arrangements at Head Work Site of ADATALA Water Supply Scheme at Bamongola Block under Malda Division, P.H.E.Dte. In the district of Malda
Construction of 1 no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at Augmentation of Sabek Mahisahara and Adjoining Mouzas (Chunpuri) W/S Scheme, Block-Canning-II. (P.H No.-I) (3rd Call)
Construction of 3.6mtr.X 3.0mtr Switch Room cum chlorine room with Water Supply and sanitary arragement at 2nd Tube Well site of Hamidpur Piped Water Supply Scheme under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda.
Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Harbhangi Water Supply Scheme, Block-Basanti under Canning Sub-Division, PHE Dte. (PH No.-V)
Construction of switch room cum chlorine room, Laying of DI rising main and DI/UPVC distribution pipe line, providing FHTC, Protection works, Construction of 200 Cum capacity RCC OHR for Bhanderkhali WS Scheme, under Hasnabad Sub-Division, PHE Dte
Laying of Rising main , Distribution System, FHTC, construction of OHR Capacity 250 cum Reparing of existing OHR, Sinking of Tube Well , Reparing of pump house and Construction of Pump house cum chlorine Room , Boundary wall and approch road for
Construction of switch room cum chlorine room, Laying of DI rising main and DI/UPVC distribution pipe line, providing FHTC, Protection works, Construction of 200 Cum capacity RCC OHR for Ketarchak WS Scheme, under Hasnabad Sub-Division, PHE Dte.
Construction of 3.6mtr.X 3.0mtr Switch Room cum chlorine room with Water Supply and sanitary arragement at 2nd Tube Well site of Nabinagar Piped Water Supply Scheme under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda.
Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Harbhangi Water Supply Scheme, Block-Basanti under Canning Sub-Division, PHE Dte. (PH No.-IV)
Laying of Distribution System, FHTC, construction of OHR (Capacity 300 and 400 cum), Sinking of Tube Well , and Construction of Pump house cum chlorine Room , Boundary wall and approch road for Augmentation of MAHADEBNAGAR ZONE- IA,IB,IC ,IIA
Construction of 5.40 Mtr. X 3.60 Mtr. Switch Room cum Chlorine Room with WC and Bath for 1st Tube well cum Head Work Site for Mugbasan Water Supply Scheme within Keshpur Block of MSSD under Midnapore Division, PHE Dte.
Construction of 1 (one) no. switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Tilkumar Water Supply Scheme (Zone-II), Block - Basanti under Alipore Division, PHE Dte.(PH- I)
Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Kumarkhali Water Supply Scheme, Block-Basanti under Canning Sub-Division, PHE Dte. (PH No.-III)
Construction of switch room cum chlorine room with sanitary and water supply arrangement including plinth protection at PH No.-1, PH No.-2 and 3 within Joygopalpur w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, PHE Dte.i