Loading…
Loading…
6,303 results • Best match
Procurement of Instruments UV Spectrophotometer pH electrode and Pocket Multiparameter Tester required for Regional Chemical and Hydrological Laboratory RCHL Midnapore SWID under the Executive EngineerAI SWI Division No I SWID Midnapore
MAINTENANCE OF THE SURROUNDING AREAS OF CLARIFIER NO-4,5,6 , WESTERN SIDE CHEMICAL HOUSE AND 54 INCH INLET VALVE CHAMBER SURROUNDING AREA ALONG WITH NORTHERN ALIGNED PREMISES AT 60 MGD WTP , IGWTP.
AMC for various maintenance job of B and A equipments like FD,ID,PA, Rotary APH, Chemical Pump, compressor etc. of 2x 250 MW units of STPS ,WBPDCL for two years
Bio Medical Waste Management Service - Per bed basis - Collection, Disposal; Military Hospital; Needle Cutters, Face Mask, Gloves, Apron, PPE kits, Chemical disinfectants, Injections & needles, Syringes, Scalpels, Human Anatomical, Animal waste, Medi..
Construction of 5.40 mtr.X 3.6mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work site of PURBA BINODPUR Water Supply Scheme of Gazole Block .under Malda Division, PHE Dte. in the District of Malda. (2nd Call)
Const. of Pump,Chlorine room etc. with 200 CuM, capacity OHR and Soil test,Boundary wall,Rising main etc..Providing FHTC at MEHERPUR and its adjoining mouzas w/s scheme including supply of all labour materials under BIRBHUM Division, PHE Dte
Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Deuli Water Supply Scheme (Zone-I), Block-Canning-II under Canning Sub-Division, PHE Dte.(PH-III)
Sinking of 250 X 150 mm Dia (through) and 180 m deep tubewell , Chlorine room with sanitary arrangnts, 250 CuM OHR, Boundary wall, Laying distribution etc.. Providing FHTC at Budhigram its adjoining mouzas WS scheme under BIRBHUM Division, PHE Dte
Construction of 5.40 mtr.X 3.6mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work site of Daudpur Water Supply Scheme under Chanchal-I Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
Construction of switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Chatrakhali W/S Scheme (Zone-III), Block - Basanti under Canning Sub-Division. PHE Dte.(PH No.-I)
Laying of Rising main , Distribution System, FHTC, construction of OHR Capacity 300 and 900 cum Sinking of Tube Well and Construction of Pump house cum chlorine Room , Boundary wall and approch road for Augmentation of Arjunpur Zone- I,II a
Construction of Staff Room cum chlorine room, Construction of High lift Pump House and Crossing of Road by Jack pushing method for Augmentation of TELEBEDIA (Zone - M) under Bankura - I, II and Barjora Block W/S Scheme (BRGF Ph - I Project)
Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Netra Water Supply Scheme, Block-Canning-II under Canning Sub-Division, PHE Dte. (PH No.-II)
Construction of 600 Cum OHR, Rising Main, Pump House cum Chlorine Room with Sanitary and Water Supply Arrangement Boundary Wall with R.C.C. column at Head Work Site 2nd Tube Well Site for Augmentation of BHANDARA Ground Based Water Supply Scheme
Construction 1250 Cum OHR, Land development, Const. Office cum Guard room,Switch cum Chlorine Room,Boundary wall,Surface drain and related allied works at Zone-IX Head work site incl. Laying Dist. System and FHTC of Habra-Gaighata under Barasat Divi.
Construction of 5.40 Mtr. X 3.60 Mtr. Switch Room cum Chlorine Room with water supply sanitary arrangement as per Deptt. drawing at Head work site of Dona zone II Water Supply Scheme under Tamluk Sub Division of Tamluk Division, PHE Dte.
Construction of Boundary Wall and 5.40 mtr.X 3.6mtr Switch Room cum chlorine room at Head Work site of Kariali Zone-I Water Supply Scheme under Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
Construction of switch room cum chlorine room, Laying of DI rising main and DI/UPVC distribution pipe line, providing FHTC, Protection works, Construction of 250 Cum capacity RCC OHR for Khariat Abad WS Scheme, under Hasnabad Sub-Division,PHE Dte
Construction of Chlorine Room ( 5.5 m x 4.5 m) at Barberia (Zone 8) at Uluberia I Block Of surface based water supply scheme of Shyampur I II , Part of Bagnan I II and Uluberia I Block under Howrah Division, PHE Dte.
Construction of 3.60 Mtr. X 3.00 Mtr. Switch Room cum Chlorine Room with water supply sanitary arrangement as per Deptt. drawing) at 3rd tube well sites of Thekuachak Zone II Water Supply Scheme under Tamluk Sub Division of Tamluk Division,
Laying of Rising Main , Distribution System, 279 nos FHTC, construction of OHR (Capacity 400 cum), , Sinking of Tube Well , Reparing of pump house and Construction of Pump house cum chlorine Room , Boundary wall and approch road for Augmentation of B
Construction of 5.40 mtr.X 3.6mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work site of SANKAIL Water Supply Scheme of Habibpur Block . under Malda Division, PHE Dte. in the District of Malda. (2nd Call)
Construction of Pump House cum chlorine room without sanitary and water supply arrangement at 3rd Tube well site at Bagila village ........... for BAGILA its Adjoining Mouza W/S scheme, block -MEMARI-I within Burdwan Sub-Division,PHE Dte._2ND CALL
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Chunakhali W/S Scheme (Zone-I), Block-Basanti under Canning Sub-Division, PHE Dte.(PH No. - 4)
Construction of switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-I), Block - Basanti under Canning Sub-Division, PHE Dte.(PH No. -I)
Construction of Pump House cum chlorine room without sanitary and water supply arrangement at Tube Well Site to departmental drawing... for ABUJHATI its Adj Mouza W/S Sch, Block -Block -Jamalpur within Burdwan Sub-Divn, PHE Dte. (Mouza-Panch Simul)
Construction of 5.40 mtr.X 3.6mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work site of PANNAPUR Water Supply Scheme of Habibpur Block under Malda Division, PHE Dte. in the District of Malda. (3rd Call)
Construction of One no Pump House cum Chlorine Room with sanitary and Water Supply Arrangement ,Construction of Boundary Wall of 200 m,,Laying of Rising Main, Construction of 450 Cum OHR, Land Development Works at Nabipur Water Supply scheme at
Construction of 5.40 Mtr. X 3.60 Mtr. Switch Room cum Chlorine Room with WC and Bath for 1st Tube well cum Head Work Site for Bajpara Water Supply Scheme within Midnapore Sadar Block of MSSD under Midnapore Division, PHE Dte.
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Kalaria W/S Scheme (Zone-IIA), Block- Canning-I under Canning Sub-Division of Alipore Division, PHE Dte. (PH-II)
Supply, delivery and carrying of chlorine gas of 900 Kg each capacity Toner with testing of Toner for BS-I and BS-II under AAA Surface based water supply Project in S.24Pgs District under S.24Pgs Mechanical Division PHE Dte.
Providing FHTC,Land development,Constr. of Office cum Guard room and Switch cum Chlorine Room, Boundary wall,Surface drain and related allied works at Betpuli including Laying Distribution of Z-XVII of Habra-I Block PART-F under Barasat Division, PHE
Construction of Chlorine cum Switch Room and Guard Room with sanitary and plumbing arrangment with approach road, plinth protection, surface drain, Land development etc. complete at OHR Site, Zone-III of Panradda W/S Scheme under Purulia Sadar Sub-Di
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Kalikatala W/S Scheme (Zone - II), Block-Canning-II under Canning Sub-Division, PHE Dte. (PH-4).
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Bihari Piped Water Supply Scheme at Ratua-I Block of Malda District under Malda Division, PHE Dte.
Construction of Pumphouse cum chlorine room without sanitary and water supply arrangement at Thanapara Zone-III Tube Well No-3 area according to departmental drawing (Size 3.60 mtr x 3.00 mtr ) under Thanapara Zone-III Piped water supply scheme in K
Repairing renovation of switch Room cum Chlorine Room at 1st Tube Well site 2nd Tube well site of Natshal Lakshya Zone-I Water Supply Scheme within Mahishadal dev. Block under Haldia Sub Division of Tamluk Division, PHE Dte. Purba Medinipur.
Augmentation of Ground Water Based Loknathpur zone-II PWSS to accommodate FHTC of 600 nos household Laying Rising Main ,Construction Pump House cum Chlorine Room (5.90m x 4.1m with sanitary and Water Supply Arrangement) Pump House (4.10m x 3.5m wit
Construction of 2 nos (3.60 Mtr. X 3.00 Mtr.) Switch Room cum Chlorine Room with water supply sanitary arrangement including Plinth Protection at 4th Tube Well site 5th Tube well site, Laying of Rising main with interconnection, and Supplying of
Construction of switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Atharabeki (Part-B) W/S Scheme, Block - Canning-II under Canning Sub-Division, PHE Dte.(PH No.-I)
Repairing and renovation of Pump House, Chlorine Room, Construction of Pathway, Drain, Development of land and others allied works at HW Site of DANGA Piped Water Supply Scheme to accommodate FHTC in Sonarpur Block under South 24-Parganas, W/S Divn.
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Dharmatala (Part-B) W/S Scheme, Block - Canning-I under Canning Sub-Division, PHE Dte. (PH No.-II)
Construction of 5.40 mtr.X 3.6mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work site of WARI its adjoining mouza Water Scheme at Harishchandrapur-I Dev. Block under Malda Division, PHE Dte. In the District of
Construction of switch room cum chlorine room with sanitary and water supply arrangement including plinth protection at PH No.-1 and PH No.-2 and 3 within Laukhali w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, PHE Dte.
3(Three) nos Construction of (3.60 Mtr. X 3.00 Mtr.) Switch Room cum Chlorine Room, Laying of Rising main line with interconnection and new construction of boundary wall (Length-50 m) at Boosting Tube Well Site for Gobindanagar Water Supply Scheme
Repairing and renovation of Construction of Operator Room and Chlorine room with water supply, sanitary arrangement (as per Deptt. drawing) (20 Nos) at OHR site, 2nd. T/W site of Surface Based Water Supply Scheme within Panskura-II under Tamluk
Augmentation of Salar PWSS Zone-IA,IB,IIA,IIB to accommodate Construction of Pump House cum Chlorine Room (5.90m 4.1m with sanitary and Water Supply Arrangement) 4 no Pump House (4.10m 3.5m without sanitary and Water Supply Arrangement) 4no, Co
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-I) , Block - Basanti under Canning Sub-Division, PHE Dte.(PH No. -II)
Const. of 250 capa. 20mtr staging height RCC OHR incl.bored pile, Const.of boundary wall,Const. of switch room cum chlorine room,Laying of DI rising main and pipe line, Providing FHTC, Protection works at Z-3 of surfaced based WSS Hasnabad
Construction of (3.60 Mtr. X 3.00 Mtr.) Switch Room cum Chlorine Room with water supply sanitary arrangement (as per Deptt. drawing) at 3rd tube well sites of Kanktia Water Supply Scheme under Tamluk Sub Division of Tamluk Division, PHE Dte.