Loading…
Loading…
6,303 results • Best match
Providing generator, temporary shelter for Sadhus shed, sanitary arrangement, special type of latrine and treatment of Hogla Structure with fire resisting chemical in connection with Gangasagar Mela-2025 at Outram Ghat Transit Point.
Repairing and rectification of different starter panel at Chemical House, Filter House and other allied works at Dariapur WTP within Malda Arsenic Area Water Supply Scheme Southern Sector under Malda Mechanical Division, PHED.
Engagement of Third Party Sampling Agency for Collection, Preparation and Chemical Analysis of Coal at Loading End Captive Mine Head or Railway Siding of WBPDCL and Unloading End Power Plants of the WBPDCL
ANNUAL E-TENDER FOR ERECTION OF PANDAL, STAGE, FURNITURE, SITTING ARRANGEMENT, DECORATION, CHEMICAL TOILET ETC. ON HIRE BASIS I.C.W. THE VARIOUS PROGRAMME OF KOLKATA POLICE IN DIFFERENT PLACES, FOR THE YEAR 2025-2026.
Renovation and upgradation of all existing infrastructures (Filter House Building,Chemical House Building,Laboratory/SCADA Building,Clear Water Pump House, Clear Water Reservoir, Outhouse, Staff Quarters and allied Works) of Augumentation of Central
Annual E-Tender for Erection of Pandal, Stage, Furniture, Sitting Arrangement, Decoration, Chemical Toilet Etc. on Hire Basis i.c.w the Various Programme of Kolkata Police in different places, for the year 2024-2025.
External and internal illumination arrangement at filter house, chemical house, administrative building, sludge sump cum pump house,substation,cwr pump house etc. at Panaghar IT Park Water Supply Scheme under AMD, P.H.E. Dte.
URGENT REPAIRING AND PAINTING AT SECOND FLOOR CORRIDOR AND ADJACENT AREA OF SEMINAR HALL OF CHEMICAL TECHNICAL DEPARTMENT AND STAIRCASE AREA UPTO ROOF OF APPLIED CHEMISTRY BUILDING OF RAJA BAZAR SCIENCE COLLEGE CAMPUS.
Net Work Monitoring of water level and collection of water samples for chemical analysis in the different Blocks in the District of Purba Burdwan for 213 nos. PHS for the year 2026-2027
Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Bayarsing WS Scheme, Block-Canning-I under Canning Sub-Divn of Alipore Division, PHE Dte. (PH No.-IV)
Construction of 01 no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Canning WS Scheme (Zone-III), Block-Canning-I under Canning Sub-Divn of Alipore Divn, PHE Dte. (PH No. III)
Repairing Renovation of Construction of switch Room cum Chlorine Room at OHR site and 2 nd.Tube Well site and Renovation of existing Boundary Wall at 2 nd Tube Well site and New construction of Boundary Wall at OHR site for Paramanandapur W/S
Construction of 1 (one) no. switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Matherdighi W/S Scheme (Zone-I, II and III), Block - Canning-II. (Zone-II, P.H. No.-I) (2nd Call)
Repairing Renovation of Construction of switch Room cum Chlorine Room at OHR site and 2 nd.Tube Well site and Renovation of existing Boundary Wall at 2 nd Tube Well site and New construction of Boundary Wall at OHR site and repairing renovation
Const. of Pump,Chlorine room etc. with 100 CuM, capacity OHR and CWR,Soil test,Boundary wall,Rising main etc..Providing FHTC at GOKRUI and its adjoining mouzas w/s scheme including supply of all labour materials under BIRBHUM Division, PHE Dte
Construction of 01 no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Canning WS Scheme (Zone-I), Block-Canning-I under Canning Sub-Divn of Alipore Divn, PHE Dte. (PH No. III)
Construction of 3.6 Mtr. X 3.00 Mtr. Switch Room cum Chlorine Room for water supply scheme with Boundary Wall (as per Deptt. drawing) at 3rd Tube well site of Dakshin Gumai Pipe Water Supply Scheme under Tamluk Sub Division of Tamluk Division
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room and dismantling abandoned pump house corresponding to Tube Well No 1 at Pukuria Piped Water Supply Scheme at Ratua-II Dev. Block under Malda Division, PHE Dte, Govt. of West Bengal.
Construction of Pump house cum Chlorine room (One no.) at 1st Tube well site of NABAGRAM piped water supply scheme to accommodate FHTC in BARUIPUR BLOCK under South 24 Parganas W/S Division-I, PHE Dte for augmentation of Surface Water Based Water
Construction of 2 nos. Pump House (Switch Room cum Chlorine Room) with Sanitary and Water Supply arrangement (size 5.0 m x 4.0 m) for Kushmuri Zone- A Water Supply Scheme wihin Indas block under Bishnupur Sub Division of Bankura Division P.H.E. Dte
Construction of 2 nos. Pump House (Switch Room cum Chlorine Room) with Sanitary and Water Supply arrangement (size 5.0 m x 4.0 m) for Kushmuri Zone- B Water Supply Scheme wihin Indas block under Bishnupur Sub Division of Bankura Division P.H.E. Dte
Cons.of Office cum Guard,Switch Cum Chlorine Room allied works at Zonal Head work site XIV i.e.Kumra,XVI i.e.Nangla..Providing FHTC Surface WS Scheme for Arsenic Affected Areas of Habra-Gaighata and adj. mouza under Barasat Division,PHE Dte PART-C,E
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room and dismantling abandoned pump house corresponding to Tube Well No 2 at Pukuria Piped Water Supply Scheme at Ratua-II Dev. Block under Malda Division, PHE Dte, Govt. of West Bengal.
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Tube Well No.-5 site in connection with Source Augmentation of KUTUB SAHAR Piped Water Supply Scheme at Gazole Block of Malda District und
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room and dismantling abandoned pump house corresponding to Tube Well No 4 at Nashipur Piped Water Supply Scheme at Ratua-II Dev. Block under Malda Division, PHE Dte, Govt. of West Bengal.
Construction of Two nos Pump House cum Chlorine Room with sanitary and Water Supply Arrangement ,Construction of Boundary Wall of 200 m,Construction of RCC approach road (3 Mtr Wide)of 100 mtr length,Laying of Rising Main, Construction of 450 Cu
Fitting fixing of VINYL SIGN BOARD including procurement for depicting the capacity of pump motor Chlorine Granules to be dosed per day at different PWSS in Harishchandrapur I II,Chanchal I II,Ratua I II Manikchak Block in the district of Malda u
Construction of Pump house cum Chlorine room (One no.) at 1st Tube well site of BEJEORANCHA piped water supply scheme to accommodate FHTC in BARUIPUR BLOCK under South 24 Parganas W/S Division-I, PHE Dte for augmentation of Surface Water Based Water
Supply, delivery and carrying of chlorine gas of 930 Kg each capacity Toner with testing of Toner for GLR-2 diamond Harbour-II under Falta-Mathurapur Mega Surface based water supply Project in S.24Pgs District under S.24Pgs Mechanical Division PHE D
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Deuli and Adjoining Mouza W/S Scheme, Block- Canning-II under Canning Sub-Divn. PHE Dte.(PH No-II)
Construction of 2 no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at (PH-III for each Zone) of Lot No. 126 WS Scheme (Zone-I, II), Block-Basanti under Canning Sub-Division, PHE Dte.
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Kalaria W/S Scheme (Zone-IIB), Block Canning-I under Canning Sub-Divn of Alipore Division, PHE Dte.(Pump House-II)
Construction of Pump House (Switch Room cum Chlorine Room) with Sanitary and Water Supply arrangement (size 5.4 m x 3.6 m) at 4th TW site at mouza Belbandhi (J.L No-22, Plot No-8) for Karisunda Water Supply Scheme (BRGF) wihin Indas block
Making of electrical wiring in chlorine room and Making Brick works cement plaster cement concrete and other allied works at the top of newly zinc alloy shade at the office of the Medinipur Sub Division I under Midnapur Mech. Division, PHE Dte.
Construction of (3.60 Mtr. X 3.00 Mtr.) Switch Room cum Chlorine Room with water supply sanitary arrangement (as per Deptt. drawing) at 3rd. T/W Site. of Bishnubar Water Supply Scheme under Tamluk Sub Division of Tamluk Division, PHE Dte. Purba Med
1(One) nos Construction of (3.60 Mtr. X 3.00 Mtr.) Switch Room cum Chlorine Room, Laying of proposed Rising main line with interconnection and new construction of boundary wall (Length-50 m) at Boosting Tube Well Site for Kotbar Water Supply Scheme
Construction of 5.40 mtr.X 3.6mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work site of GOURIA its adjoining mouza Water Scheme at Chanchal-I Dev. Block under Malda Division, PHE Dte. In the District of Malda
Supply, delivery and carrying of chlorine gas of 930 Kg each capacity Toner with testing of Toner for GLR-2 Diamond Harbour-II under Falta-Mathurapur Mega Surface based water supply Project in S.24Pgs District under S.24Pgs Mechanical Division PHE Dt
Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Matherdighi W/S Scheme (Zone-I, II and III), Block- Canning-II. (Zone-III, P.H. No.- III) (2nd Call)
Construction of (3.60 Mtr. X 3.00 Mtr.) Switch Room cum Chlorine Room with water supply sanitary arrangement (as per Deptt. drawing) at 2nd tube well site of Solat Water Supply Scheme under Haldia Sub Division of Tamluk Division, PHE Dte. Purba M
Construction of (3.60 Mtr. X 3.00 Mtr.) Switch Room cum Chlorine Room with water supply sanitary arrangement (as per Deptt. drawing) at 3rd. T/W Site. of Moyna Zone-I Water Supply Scheme under Tamluk Sub Division of Tamluk Division, PHE Dte. Purba
Construction of (3.60 Mtr. X 3.00 Mtr.) Switch Room cum Chlorine Room with water supply sanitary arrangement (as per Deptt. drawing) at 4th. T/W Site. of Moyna Zone-I Water Supply Scheme under Tamluk Sub Division of Tamluk Division, PHE Dte. Purba
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room and dismantling abandoned pump house corresponding to Tube Well No 3 at Nashipur Piped Water Supply Scheme at Ratua-II Dev. Block under Malda Division, PHE Dte, Govt. of West Bengal.
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Narayangar (Part-B) W/S Scheme, Block- Canning-I under Canning Sub-Divn of Alipore Division, PHE Dte. (P.H No-III)
Ceration of Balance FHTC with pipe line, Construction of 02 (Two) nos Pump House cum chlorine room (5.40 M X 3.6M) and Toilet with sanitary water supply arrangement including plinth protection, Ramp etc at Tail end TW-1 Site at Hirapur village
Providing FHTC in connection with JJM and Constr. of Office cum Guard room and Switch cum Chlorine Room,Boundary wall,Surface drain,Land development and other allied works at Head work site of Zone-I within Amdanga Block under Barasat Division, PHED
Construction of 5.40 Mtr. X 3.60 Mtr. Switch Room cum Chlorine Room with water supply sanitary arrangement (as per Deptt. drawing) at Head work site of Uttar Dhalhara Zone- II Water Supply Scheme under Tamluk Sub Division of Tamluk Division, PHE Dt
Construction of 5.40 mtr.X 3.6mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work site of HATINDA its adjoining mouza Water Scheme at Chanchal-I Dev. Block under Malda Division, PHE Dte. In the District of Malda
Construction of Pump House (Switch Room cum Chlorine Room) with Sanitary and Water Supply arrangement (size 5.4 m x 3.6 m) at 3rd TW site at mouza Karisunda (J.L No-54, Plot No-1887) for Karisunda Water Supply Scheme (BRGF) wihin Indas block
Construction of 5.40 Mtr. X 3.60 Mtr. Switch Room cum Chlorine Room with WC and Bath including plinth protection and side drain for 1st Tube well cum Head work site of Balarampur Water Supply Scheme within KSD under Midnapore Division PHE Dte._2nd_Ca