Loading…
Loading…
6,303 results • Best match
Const. of 200 capa. 20mtr staging height RCC OHR incl.bored pile, Const.of boundary wall,Const. of switch room cum chlorine room,Laying of DI rising main and pipe line, Providing FHTC, Protection works at Z-4 of surfaced based WSS Hasnabad
Construction of Pumphouse cum chlorine room without sanitary and water supply arrangement at Thanapara Zone-III Tube Well No-2 area according to departmental drawing (Size 3.60 mtr x 3.00 mtr) under Thanapara Zone-III Piped water supply scheme in Kar
Laying distribution system pipe line, accommodate to FHTC and construction of switch room cum chlorine room (2nd T/W site), construction of Boundary wall (2nd T/W site), under JJM with allied work for Harasankar PWSS within Tamluk Sub-Division under
Construction of 1 (one) no. switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Choto Mollakhali Water Supply Scheme (Zone-II), Block-Gosaba under Alipore Division, PHE Dte.(PH - I)
Repairing renovation of switch Room cum Chlorine Room at 1st Tube Well site 2nd Tube well site of Natshal Lakshya Zone-II Water Supply Scheme within Mahishadal Dev. Block under Haldia Sub Division of Tamluk Division, PHE Dte. Purba Medinipur.
Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Kalaria Water Supply Scheme (Zone-I), Block-Canning-I under Alipore Division,PHE Dte.(Pump House-IV)
Const. of 300 capa. 20mtr staging height RCC OHR incl.bored pile, Const.of boundary wall,Const. of switch room cum chlorine room,Laying of DI rising main and pipe line, Providing FHTC, Protection works at Z-5 of surfaced based WSS Hasnabad
Construction of Pumphouse cum chlorine room without sanitary and water supply arrangement at Thanapara Zone-II Tube Well No-2 area according to departmental drawing (Size 3.60 mtr x 3.00 mtr ) under Thanapara Zone-II Piped water supply scheme in Kar
Supply, delivery fitting-fixing of VINYL SIGN BOARD for depicting the capacity of Pump motor Chlorine granules to be dosed per day at various Pump houses in Islampur, Chopra, Goalpokher-I Goalpokher-II Block in the district of Uttar Dinajpur un
Construction of (3.60 Mtr. X 3.00 Mtr.) Switch Room cum Chlorine Room with water supply sanitary arrangement (as per Deptt. drawing) at 3rd tube well site of Rangibasan Water Supply Scheme under Haldia Sub Division of Tamluk Division, PHE Dte. Pur
Augmentation of Putia Zone II PWSS to accommodate Construction of Pump House cum Chlorine Room 5.90m 4.1m with sanitary and Water Supply Arrangement 1 no and Pump House 4.10m 3.5m without sanitary and Water Supply Arrangement 1no Construction of B
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Kamarpara W/S Scheme, Block-Gosaba under Canning Sub-Divn of Alipore Division, PHE Dte. (Pump House-II) (2nd Call)
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Kendua Piped Water Supply Scheme at Chanchal-I Block of Malda District under Malda Division, PHE Dt
Construction of 1 no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Lot No. 126 Water Supply Scheme (Zone-I), Block- Basanti under Alipore Division, PHE Dte.(P.H No. II)
Construction of Chlorine cum Switch Room and Guard Room with sanitary and plumbing arrangment with approach road, plinth protection, surface drain, Land development etc. complete at OHR Site, Zone-VI of Panradda W/S Scheme under Purulia Sadar Sub-Div
Construction of (3.60 Mtr. X 3.00 Mtr.) Switch Room cum Chlorine Room without water supply sanitary arrangement (as per Deptt. drawing) at 3rd Tube Well site of Barsundra Water Supply Scheme within Haldia Dev. Block under Haldia Sub Division of T
Const. of 200 Cum capacity OHR with soil Investigation, 5.90 m X 4.10 m Pump, Chlorine room with sanitary arrangements.... FHTC and different works related to BENGACHATRA PIPED WS SCHEME incl. supply of all labour,materials within Birbhum Divn, PHED
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Bansra W/S Scheme (Zone-II), Block-Canning-I under Canning Sub-Division, PHE Dte.(PH No. - 4)
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Bansra W/S Scheme (Zone-I), Block-Canning-I under Canning Sub-Division, PHE Dte.(PH No. - 4)
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Chunakhali W/S Scheme (Zone-II), Block-Basanti under Canning Sub-Division, PHE Dte.(PH No. - 4)
Construction of switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-V), Block - Basanti under Canning Sub-Division, PHE Dte.(PH No. -I)
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-I) , Block - Basanti under Canning Sub-Division, PHE Dte.(PH No. -III)
Allied work of Laying rising main and distribution system with FHTC including Construction Pump House Cum Chlorine Room , Boundary wall at 2nd Tube Well Site and Earth filling at both site of Padamkandi Water Supply Scheme , under Jal Jevan Missio
Construction of 3.60 Mtr. X 3.00 Mtr. Switch Room cum Chlorine Room with water supply sanitary arrangement as per Deptt. drawing at 3rd tube well sites of Thekuachak Zone-I Water Supply Scheme under Tamluk Sub Division of Tamluk Division, PHE
A_Construction of Pump House cum chlorine room with sanitary and water supply arrangement at Head Work Site ......... B_2nd Tube Well Site for SHURA Zone-II_ W.S. Scheme_ Block- Jamalpur within Burdwan Divn_ PHE Dte. Dist.-Purba Bardhaman. 2 Nos PH.
Supply,Delivery and fitting fixing of VINYL SIGN BOARD for depicting the capacity of pump motor Chlorine Granules to be dosed per day at different PWSS in Raiganj, Kaliyaganj Hemtabad Block in the district of Uttar Dinajpur under Malda Mechanical
Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Duttababur Abad Water Supply Scheme, Block-Canning-I under Canning Sub-Division, PHE Dte. (PH No.-II)
Development newly installation of SS fabricated Stair case inside OHR and Cleaning and Washing of 1400 to 1550 cu.m capacity of 13 Nos existing ESR with high strength chlorine as preventive measure of drinking water at several campus of BM
Construction of Chlorine cum Switch Room an Guard Room with sanitary and plumbing arrangment with approach road, plinth protection, surface drain, Land development etc. complete at OHR Site, Zone-I of Panradda W/S Scheme under Purulia Sadar Sub-Divis
Over all repairing of Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room corresponding to Tube Well No 3 at KUSHIDA Piped Water Supply Scheme under Harishchandrapur-I Block under Malda Division, PHE Dte, Govt. of West Bengal.
STRENGTHENING THE GRAVITY FEED POTABLE WATER FLOW CONNECTIVITY BY LAYING OF THE NB 1600MM MILD STEEL SPIRALLY WELDED PIPELINE IN BETWEEN THE CHLORINE CONTACT CHAMBER OF THE NEW 100 MGD WTP AND THE SUMP OF THE PRESSURE STATION NO-3, IGWTP
Supply, delivery fitting-fixing of VINYL SIGN BOARD for depicting the capacity of Pump motor Chlorine granules to be dosed per day at various Pump houses in Itahar Karandighi Block in the district of Uttar Dinajpur under Malda Mechanical Divisi
Construction of 3.60 Mtr. X 3.00 Mtr. Switch Room cum Chlorine Room with out W.C. and Bath for 2nd. Tube Well site of Augmentation of Sonakhali water supply scheme within Ghatal Sub-Division under Midnapore Division, PHE Dte. (Considering G.L. 1950
Operation and running maintenance of existing chlorination plant at Salt lake UGR and collection of water and measurement of residual chlorine by field kit test method in connection with supply of portable water from 5 MGD capacity UGR under BMC
Rejuvenation / up-gradation of 2 Nos. PUMP HOUSE, Chlorine Room and Part of Boundary wall of GABBERIA PIPE WATER SUPPLY SCHEME (Existing Zone 16 OHR Site) in BISHNUPUR-I Block under South 24 Pgs W/S Division-I, P.H.E. Dte.
Construction of Chlorine Room (5.5 m x 4.5 m) at Benapur (Zone - 31) at Bagnan II Block Of surface-based water supply scheme of Shyampur I II, Part of Bagnan I II and Uluberia-I Block under Howrah Division, PHE Dte.
Construction of Chlorine Room ( 5.5 m x 4.5 m) at Deulti (Zone - 36) at Bagnan II Block Of surface based water supply scheme of Shyampur I II , Part of Bagnan I II and Uluberia-I Block under Howrah Division, PHE Dte.
Construction of Chlorine Room ( 5.5 m x 4.5 m) at Orphuli (Zone 34) at Bagnan II Block Of surface based water supply scheme of Shyampur I II , Part of Bagnan I II and Uluberia-I Block under Howrah Division, PHE Dte.
Supply, delivery and fitting-fixing of VINYL SIGN BOARD for depicting the capacity of Pump motor Chlorine granules to be dosed per day at various Pump houses in Habibpur,Bamongola and Englishbazar Block in the district of Malda under Malda Mechanic
Supply,Delivey fitting fixing of VINYL SIGN BOARD for depicting the capacity of pump motor Chlorine Granules to be dosed per day at different PWSS in Gazole Old Malda Block in the district of Malda under Malda Mechanical Division, PHE Dte.
Procurement of Chemicals and Consumables Glassware Plasticware etc. required for smooth running of the Laboratories for the year 2024 in the district of Paschim Medinipur under Midnapore Division PHE Dte. Total Nos. of Laboratories_17 Nos.
Supply of chemicals and glassware for the 15 (fifteen) nos. of water testing laboratories in the district of South 24 Parganas under Alipore Division, PHE Dte for the a period of 365 days. (2nd Call)
Operation and Maintenance for R.O plant of Jharkhali Tourist Hub under Ground Water Based Water Supply Scheme including supplying chemicals etc. of Basanti Block of Canning Sub-Division under Alipore Division, PHE Dte. (12 Months)
Procurement of Chemicals, Glasswares, Certified Reference Standards, required for water testing activities of State Referral Laboratory of West Bengal at Dakshin Roypur Water Treatement Plant under South 24 Pgs W/S Division-I, PHE Dte.
Supply of Chemicals, Glassware and Installation of the pre-requisites needed for successful application recognition from NABL for 11 mandatory water quality parameters of Mobile Laboratory Van stationed in Maldah District under PHE Department, Govt
NOTICE INVITING e-TENDER THROUGH E-PROCUREMENT FOR THE PROCUREMENT OF TITANIUM MAKE CENTRIFUGAL PUMP TAG NO. 284 AS PER GIVEN SPECIFICATION FOR THE NEED OF BRINE APPLICATION IN CHLOROCAUSTIC PLANT IN DURGAPUR CHEMICALS LIMITED.
SUPPLY, ERECTION AND COMMISSIONING OF COOLING WATER TREATMENT PLANT AS PER TECH SPEC NO. ROS6319 R00 ROS4290 R00. MAIN SUPPLY, CHEMICALS, ERECTION, COMMISSIONING, PG TEST AND SUPERVISION FOR SAGARDIGHI TPP EXTN U5 1X660 MW PROJECT
Hiring of Custom House Agent - Lumpsum Based - Export; Custom Clearance, APPOINTMENT OF MASTER CHA FOR HANDLING OF LCL CONTAINERS AT BL CFS-KOLKATA; Electronic Devices, Precious Metal, Defence Cargo, Foods Items, Industrial Machinery, Chemicals, Medi..
Electro mechanical works
Electro mechanical works