Loading…
Loading…
6,299 results • Best match
Supplying, installation and commissioning of Cooling Centrifuge, Remi C 24 Plus with accessories in the Department of Chemical Technology, Rajabazar Science College Campus, University of Calcutta.
Selection of Laboratories for Testing of Products/Material - Copper Concentrate; Analysis of Copper Concentrate of MCP, KCC & ICC origin for Copper Gold & Silver content; Number; Chemical
Construction of 200 cum OHR with soil investigation, pump house cum chlorine room, Laying rising and distribution main pipe line with FHTC for GOBINDAPUR Piped Water Supply Scheme to accommodate FHTC in Sonarpur Block.
Construction of pumphouse cum Chlorine room with sanitary and water supply arrangement at Arangsarisha mouza in Brittihuda Piped water supply scheme in Chapra Block under Nadia Arsenic Civil Division-II, PHE Dte. Dist- Nadia.
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-IV) , Block - Basanti. (PH NO.-II)
Supply and dosing of high strength calcium hypochlorite granular chlorine through the mechanical stirring system for making solution of water and calcium based granules directly charged on line injection by mechanically regulated dosing pumps.......
Roof treatment, repairing and painting of Office cum Goadowd Chlorine room and repairing and painting of Boundary wall with other allied works under Aguri Band Punisol and adjoining Mouzas Water Supply Scheme (Zone-C)
Repairing and Renovation of boundary wall, guard room, chlorine room, drain, pathway and anciliary works at Tank No-16 within AA-II premises area under New Town Kolkata W/S Division-I, P.H.E. Dte.
Construction Pump House Cum Chlorine Room at Head Work site of BALI ZONE - III Water Supply Scheme , under Jal Jevan Mission within Nawda Block under Berhampore Division -I, PHE.Dte. In the district of Murshidabad.
Construction of 450 cum capacity OHR (20 mtr. Staging Height), Pump House cum Chlorine Room (2 Nos.) along with Laying Distribution System, Rising Main, Functional Household Tap Connection .. TARDAHA KAPASATI Piped Water Supply Scheme
Roof treatment, repairing and painting of Office cum Goadowd Chlorine room and repairing and painting of Boundary wall with other allied works under Aguri Band Punisol and adjoining Mouzas Water Supply Scheme (Zone-A)
Design,Const.Commi.of 01 no.GLR (capacity 400 cum) with pump house inclu. Soil Investigation,LT, Chlorine Guard Room,other ancillary civil works for Hasnabad Surface Water Based Piped WS Scheme under Barasat Division,PHE Dte
Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Amlamethi W/S Scheme, Block - Gosaba. (Pump House No. V).
Construction of 300 cum OHR with soil investigation, pump house cum chlorine room, Laying rising and distribution main pipe line with FHTC for JAGOTIPOTA Piped Water Supply Scheme to accommodate FHTC in Sonarpur Block.
Construction of 5.40 Mtr. X 3.60 Mtr. Switch Room cum Chlorine Room with WC and Bath for 1st Tube Well cum Head work site of Warda_Zone_I Water Supply Scheme under Midnapore Division, PHE Dte.
Construction of pumphouse cum Chlorine room with sanitary and water supply arrangement at Lakshmigacha mouza in Brittihuda Piped water supply scheme in Chapra Block under Nadia Arsenic Civil Division-II ,PHE Dte. Dist- Nadia.
Construction of Boundary Wall, Chlorine Room along with Laying of Distribution System, Rising Main, Providing Functional Household Tap Connection (FHTC) for Augmentation of UTTAR DURGAPUR MOUZA Piped Water Supply Scheme of JOYNAGAR-I Block
Construction of 500 Cum. capacity OHR (20 mtr. staging height), Boundary Wall, Chlorine Room along with Laying of Distribution System..for Augmentation of TAJPUR FATEPUR MOUZA Piped Water Supply Scheme of JOYNAGAR-I Block
Construction of Boundary Wall, Pump house cum Chlorine Room along with Laying of Distribution System, Rising Main, Providing Functional Household Tap Connection (FHTC) for MAHISHMARI MOUZA Piped Water Supply Scheme of JAYNAGAR-I Block
Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the Site of Devis Abad Water Supply Scheme, Block - Canning-I. (PH-V)
Construction of Boundary Wall, Chlorine Room along with Laying of Distribution System, Rising Main, Providing Functional Household Tap Connection (FHTC) for Augmentation of MALLIKPUR (PART-III) MOUZA Piped Water Supply Scheme of BARUIPUR Block
Operation and Supervision of Submersible Pumping Machinery Chlorine Machine and 62.5 KVA 50 Hz AC Diesel Generator Set Silent Type at Lifting Station II of Tarapith Sewerage Development Project under Bolpur Mechanical Division PHE.Dte
Construction of 5.40 Mtr. X 3.60 Mtr. Switch Room cum Chlorine Room with WC and Bath for 1st Tube Well cum Head work site of Bhabanipur Water Supply Scheme under Midnapore Division, PHE Dte.
Construction of Boundary Wall, Chlorine Room along with Laying of Distribution System, Rising Main, Providing Functional Household Tap Connection (FHTC) for Augmentation of RAMNAGAR (PART-I) MOUZA Piped Water Supply Scheme of BARUIPUR Block
Construction of 350 Cum. capacity OHR (20 mtr. staging height), Boundary Wall, Pump house cum Chlorine Room along with Laying of Distribution .. for Augmentation of BALBALIA MOUZA Piped Water Supply Scheme of BARUIPUR Block
Construction of 200 cum OHR with soil investigation, pump house cum chlorine room, Laying rising and distribution main pipe line with FHTC for HOGALKURIA Piped Water Supply Scheme to accommodate FHTC in Sonarpur Block.
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-IX) , Block - Basanti (PH No.-II)
Construction of Boundary Wall, Chlorine Room along with Laying of Distribution System, Rising Main, Providing Functional Household Tap Connection (FHTC) for Augmentation of MALLIKPUR (PART-II) MOUZA Piped Water Supply Scheme of BARUIPUR Block
Construction of pumphouse cum Chlorine room with sanitary and water supply arrangement at Bhagabanpur mouza in Mahatpur Piped water supply scheme in Chapra Block under Nadia Arsenic Civil Division-II ,PHE Dte. Dist- Nadia
Construction Pump House Cum Chlorine Room at Head Work site of RAMNACHANDPUR ZONE - IV Water Supply Scheme , under Jal Jevan Mission within Nawda Block under Berhampore Division -I, PHE.Dte. In the district of Murshidabad.
Construction of 1 (one) no. switch room cum chlorine room (4.88 m x 3.66 m) including Sanitary arrangement as per departmental drawing at the Site of Ramchandrakhali Water Supply Scheme(Zone - I), Block - Basanti.
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-VIII) , Block - Basanti (PH No.-II)
Construction of Chlorine room of size 4.00 mtr X 4.00 mtr X 3.50 mtr (Ht) at Head works site of Baram w/S Scheme under Purulia Sadar Sub Division Under Purulia Division , PHE Dte.
Construction of switch room cum chlorine room,Laying of DI rising main, Providing FHTC, Protection works, Construction of 250 cum capacity RCC OHR for Mathbari Abad WS scheme under Hasnabad Sub-Division, PHE Dte.
Sinking of deep tubewell....Pump,Chlorine room with sanitary arrangements,Boundary wall,Soil Investigation,Land development,Rising main,Laying distribution,road restoration for Zone-I,II...Providing FHTC....Kashtagara WS Scheme, under BIRBHUM Divn.
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-VII), Block - Basanti (PH No.-II)
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-VIII) , Block - Basanti (PH No.-III)
Roof treatment, repairing and painting of Office cum Goadowd Chlorine room and repairing and painting of Boundary wall with other allied works under Aguri Band Punisol and adjoining Mouzas Water Supply Scheme (Zone-D
Construction Pump House Cum Chlorine Room at Head Work site of BALI ZONE - II Water Supply Scheme , under Jal Jevan Mission within Nawda Block under Berhampore Division -I, PHE.Dte. In the district of Murshidabad
Construction of 350 Cum. capacity OHR (20 mtr. staging height), Boundary Wall, Chlorine Room along with Laying of Distribution System..for Augmentation of DAKSHIN KASHI MOUZA Piped Water Supply Scheme of MOGRAHAT-II Block
Construction of Boundary Wall, Chlorine Room along with Laying of Distribution System, Rising Main, Providing Functional Household Tap Connection (FHTC) for Augmentation of DEHI MADAN MOLLA MOUZA Piped Water Supply Scheme of BARUIPUR Block
Construction of 250 cum OHR with soil investigation, pump house cum chlorine room, Laying rising and distribution main pipe line with FHTC for GANGAJOARA Piped Water Supply Scheme to accommodate FHTC in Sonarpur Block.
Construction of Boundary Wall, Chlorine Room along with Laying of Distribution System, Rising Main, Providing Functional Household Tap Connection (FHTC) for Augmentation of RAMNAGAR (PART-III) MOUZA Piped Water Supply Scheme of BARUIPUR Block
Construction of switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-IX), Block - Basanti (PH No.-I)
Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Amlamethi W/S Scheme, Block - Gosaba. (Pump House No. VI).
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-III) , Block - Basanti (PH NO.-II)
Construction of 350 cum capacity OHR (20 mtr. Staging Height), Pump House cum Chlorine Room (2 Nos.) along with Laying Distribution System, Rising Main, Functional Household Tap Connection .. BHANGAR RAGHUNATHPUR Piped Water Supply Scheme
Construction of switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-IV), Block - Basanti. (PH NO.-I)
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-IV), Block - Basanti. (PH NO.-III)
Supply and dosing of high strength calcium hypochlorite granular chlorine through the mechanical stirring system for making..........Capacity Salkia UGR for a tenure of 36 Months (Jan 25 to Dec 27) under HMC area.