Loading…
Loading…
6,299 results • Best match
Construction of 500 Cum. capacity OHR (20 mtr. staging height), Boundary Wall, Chlorine Room along with Laying of Distribution System..Augmentation of MOGRAHAT ZONE-33 MOUZA Piped Water Supply Scheme of MOGRAHAT-II Block
Construction of switch room cum chlorine room,Laying of DI rising main, Providing FHTC, Protection works, Construction of 300 cum capacity RCC OHR for Mallick Gheri WS scheme under Hasnabad Sub-Division, PHE Dte.
Construction of pumphouse cum Chlorine room with sanitary and water supply arrangement at Gokhrapota mouza in Brittihuda Piped water supply scheme in Chapra Block under Nadia Arsenic Civil Division-II ,PHE Dte. Dist- Nadia
Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the Site of Devis Abad Water Supply Scheme, Block - Canning-I. (PH-II)
Balance work of Rising main, Construction of Chlorine Room and Construction of Operator Room for Improvement of Sonagara Water Supply Scheme under BRGF (Phase - I) under Jal Jeevan Mission Programme under Khatra Sub-Division
Construction of switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-VIII), Block - Basanti (PH No.-I)
Construction of 600 Cum. capacity OHR (20 mtr. staging height), Boundary Wall, Chlorine Room along with Laying of Distribution System..for Augmentation of DIHI KALAS MOUZA Piped Water Supply Scheme of MOGRAHAT-II Block
Construction of pumphouse cum Chlorine room with sanitary and water supply arrangement at Jamredanga mouza in Mahatpur Piped water supply scheme in Chapra Block under Nadia Arsenic Civil Division-II ,PHE Dte. Dist- Nadia.
Construction of 5.40 Mtr. X 3.60 Mtr. Switch Room cum Chlorine Room with WC and Bath for 1st Tube Well cum Head work Site for Bhabaninagar Water Supply Scheme under Midnapore Division PHE Dte.
Construction of 11 Nos. different Capacity OHR including Soil test (100,200,300,400,500,600,700,750,1000 Cum), Boundary Wall, 11 Nos Operator Shed cum chlorine room with sanitary and water supply arrangement, Laying of clear water Rising Main , Lay
Construction of 5.40 Mtr. X 3.60 Mtr. Switch Room cum Chlorine Room with WC and Bath for 1st Tube Well cum Head work site of Warda_Zone_II Water Supply Scheme under Midnapore Division, PHE Dte.
Construction of switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-VII), Block - Basanti (PH No.-I)
Construction of switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-II), Block - Basanti (PH NO.-I)
Construction of switch room cum chlorine room,Laying of DI rising main, Providing FHTC, Protection works, Construction of 450 cum capacity RCC OHR for Dakshin Akhratala WS scheme under Hasnabad Sub-Division, PHE Dte.
Construction of 5.40 Mtr. X 3.60 Mtr. Switch Room cum Chlorine Room with WC and Bath for 1st Tube Well cum Head work site of Khasbar_Zone_II Water Supply Scheme under Midnapore Division, PHE Dte.
Construction Pump House Cum Chlorine Room with boundary wall at 2nd Tube Well Site of BHAGWANGOLA PWSS under Jal Jeevan Mission within Bhagwangola-I Block under Berhampore Division -I, PHE.Dte.in the district of Murshidabad.
Repairing of Pump house, Chlorine room, Toilet Construction of Boundary wall and Other allied works at Sirkabad Riversite Site under Sirkabad W/S Scheme under Purulia Sadar Sub Division under Purulia Division, PHE Dte.
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Nagartala (Zone - I) W/S Scheme, Block-Canning-II (PH-4).
Construction of 200 CuM capacity O.H.R.with Soil Investigation,5.90 m X 4.10 m Pump, Chlorine room with sanitary arrangements,....FHTC and different works related to RANIBAZAR PIPED WS SCHEME within Birbhum Division, PHE Dte.
Construction of switch room cum chlorine room,Laying of DI rising main, Providing FHTC, Protection works, Construction of 200 cum capacity RCC OHR for Petua Dhanihati WS scheme under Hasnabad Sub-Division, PHE Dte.
Making a platform alongwith suitable derrick system for loading and unloading chlorine tonner and other allied works for Gaseous chlorination system at NiyamatpurIntermediate Boosting Station within Arsenic area WS Scheme Northern sector under MLMD
Construction of switch room cum chlorine room,Laying of DI rising main, Providing FHTC, Protection works, Construction of 300 cum capacity RCC OHR for Kusangra w/s scheme, under Hasnabad Sub-Division, PHE Dte.
Construction of 5.40 Mtr. X 3.60 Mtr. Switch Room cum Chlorine Room with WC and Bath for 1st Tube Well cum Head work site of Khagragerya Water Supply Scheme under Midnapore Division, PHE Dte.
Construction Pump,Chlorine room with sanitary arrangements, 250 CuM OHR, Boundary wall, Soil Investigation, Land development, Rising main, Laying distribution, road restoration and Providing FHTC..at HANSAN WS scheme under BIRBHUM Division, PHE Dte.
Construction of Chlorine Room at Head Work Site for Shyamsundarpur (Zone- IIA and IIB) Water Supply Scheme under Raipur Water Supply Scheme (BRGF Ph-I) under Khatra Sub-Division of Bankura Division, P.H.E. Dte.
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-IX) , Block - Basanti (PH No.-III)
Construction of Boundary Wall, Chlorine Room along with Laying of Distribution System, Rising Main, Providing Functional Household Tap Connection (FHTC) for Augmentation of CHAK HARANANDAPUR MOUZA Piped Water Supply Scheme of MOGRAHAT-II Block
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-II) , Block - Basanti (PH NO.-II)
chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Uttar Angadberia W/S Scheme, Block-Canning-I under Canning Sub-Division, PHE Dte. (PH-5).
Construction of 5.40 Mtr. X 3.60 Mtr. Switch Room cum Chlorine Room with WC and Bath for 1st Tube Well cum Head work site of Warda_Zone_I Water Supply Scheme under Midnapore Division, PHE Dte.
Roof treatment, repairing and painting of Office cum Godown Chlorine room and repairing and painting of Boundary wall with other allied works under Aguri Band Punisol and adjoining Mouzas Water Supply Scheme (Zone-E)
Construction of pumphouse cum Chlorine room with sanitary and water supply arrangement at Mandia mouza in Brittihuda Piped water supply scheme in Chapra Block under Nadia Arsenic Civil Division-II ,PHE Dte. Dist- Nadia.
Construction of switch room cum chlorine room (5.4m x 3.6m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-III), Block - Basanti (PH NO.-I)
Construction of Pump House cum chlorine room (5.40mX3.6M) and Toilet with sanitary water supply arrangement, Construction of Guard Room and Toilet with sanitary and water supply arrangement, Construction of WBSEDCL Room and Crossing Rail
Construction of 5.40 Mtr. X 3.60 Mtr. Switch Room cum Chlorine Room with WC and Bath for 1st Tube Well cum Head work site of Khasbar_Zone_I Water Supply Scheme under Midnapore Division, PHE Dte.
Repairing and renovation of switch Room cum Chlorine Room at 1st Tube well site of BETKUNDU Water Supply Scheme within Mahishadal Dev. Block under Haldia Sub Division of Tamluk Division, PHE Dte. Purba Medinipur.
Construction of 350 cum OHR with soil investigation, pump house cum chlorine room, Laying rising and distribution main pipe line with FHTC for JAGADISHPUR Piped Water Supply Scheme to accommodate FHTC in Sonarpur Block
Construction of 350 Cum. capacity OHR (20 mtr. staging height), Boundary Wall, Chlorine Room along with Laying of Distribution System .. for Augmentation of UTTAR PARANIJ MOUZA Piped Water Supply Scheme of JOYNAGAR-I Block
Construction of Chlorine room of size 4.00 mtr X 4.00 mtr X 3.50 mtr (Ht) at Head works site of Satra w/S Scheme under Purulia Sadar Sub Division Under Purulia Division , PHE Dte.
Repairing of AAS Instrument
Consumables of High Quality Ultrapure Water Purification Make ION EXCHANGE
Toilet Cleaner Liquid as per IS 7983 (Q4), Toilet Soap, Liquid As Per IS 4199 (Q4), Floor Cleaner (V2) (Q4), Naphthalene as per IS 539 (Q4), Urinal Cubes - Deodorizer Block (Q3), Stable Bleaching Powder for Household and Industrial use as per IS 1065 (Part 1) (Q3), Air Freshener Liquid (Q4), Squeegee Washer Wiper Mopper (V2) (Q4), Plastic Buckets as per IS 3730 (Q4), Domestic Mugs - Bathroom (Q3), Broom (V2) (Q4), dust pans (Q4), Dishwashing Products (V2) as per IS 6047 (Q4)
E/M works
E/M works
p-nitrophenol, Trisodium citrate, COOMASSIE BRILLIENT, P- NITROPHENYL, TRIS-Hydrochloride, Maleic acid, Potassium Dichromate, Diphenyl amine indicator, Phenol, Sodium chloride, P-dimethylaminobenzaldehyde, Proline, Carboxylic acid, Acetone, CTAB, ... KMN04, Hydrochloric acid , ...
Electro mechanical works
Electro mechanical works
Supply of chemicals and Glasswares required for five months from Nov 2018 to March 2019 for the Laboratories under Raiganj Division, PHED in the District of Uttar Dinajpur. Part-I
Supplying and Delivery of laboratory Chemicals reagents and Glassware to 19 Nineteen no Water Testing Laboratory for National Rural Drinking Water Quality Testing Monitoring Surveillance programme related to Operation Maintenance
Supplying and Delivery of laboratory Chemicals/reagents to 19(Nineteen) nos. Water Testing Laboratory for National Rural Drinking Water Quality Testing Monitoring Surveillance programme in State of West Bengal under