Loading…
Loading…
169 live101 closing this weekmost from Local Self Government Department Kerala and Higher Education Department Kerala
169 results • Best match
Vulnerability and Penetration Testing - Desktop PCS, Routers & Printers; Security Infrastructure Review, Data Communications and Network Control Review, Secure Configuration Review (Devices/OS), Malware Analysis; Vulnerability Addressing, Ethical Hac..
Computer Table Wooden Mahogany, Bosch Electric Grass Trimmer easy Grass cut 280 Watt, Single seater Sofa Teak wood, Five Seater Sofa Wooden, Milton Flask 1500ml Stainless steel
Entry and Mid Level Laptop - Notebook (Q2), Entry and Mid Level Desktop Computer (Q2)
Entry and Mid Level Laptop - Notebook (Q2), Entry and Mid Level Desktop Computer (Q2) (3 (3 ) )
Custom Bid for Services - COMPREHENSIVE ONSITE ANNUAL MAINTENANCE CONTRACT FOR COMPUTERS & PERIPHERALS Similar Category Customized AMC/CMC for Pre-owned Products
Annual Plan-Electrical Work - Providing Computer Terminals in the Newly Constructed Classroom Gokhale GHSS Kalladathur Kapur GP
Facility Management Services - LumpSum Based - VETERINARY DISPENSARY; SUPPLY AND INSTALLATION OF INVERTER & TABLET COMPUTERS; Consumables to be provided by service provider (inclusive in contract cost)
Entry and Mid Level Laptop - Notebook (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2), Entry and Mid Level Desktop Computer (Q2) (3 (3 ) )
Annual Plan-Electrification of Ezhur Higher Secondary School Science and Computer lab - Tirur Municipality-Proj No- 412/26-General Electrical Work
IISER/PUR/0021/SI-P/SP/26-27
A4 and Legal Size Multifunction Printer (MFP) (Q2), Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2), Entry and Mid Level Desktop Computer (Q2)
Entry and Mid Level Laptop - Notebook (Q2), Entry and Mid Level Desktop Computer (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2) Multimedia Projector (MMP) (Q2), Line Interactive UPS with AVR (V2) (Q2) Size Multifunction Printer (MFP) (Q2) (3 (3 ) )
Entry and Mid Level Laptop - Notebook (Q2), Entry and Mid Level Desktop Computer (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Construction of new building - (Civil Work, Plumbing work, Electrical Work with KSEB connection, Computer Network, Telephone Cabling, Work station and Furniture, Foundation and Inauguration stone fixing)
Supply of eletronics equipments like computer,laptop, television,mobiles,projector,speaker,water purifier for various offices ,inspection bunglows under Nature study centre Kalady through abhayaranyam FDA during 2026-27
The estimate includes minor repair and maintenance works likely to arise during the contract period of one year Major works are not included in this estimate
CUTOMIZED CLUSTER WORK STATION, METAL FILE RACK, NARROW DINING TABLE, WALL MOUNTED FILE RACK, CUSTOMISED BACK PANNEL, VERTICAL BLINDS, RE- CONFIGURATION OF EXISTING WORKSTATION WITH MATERIALS, PRIVACY CURTAIN, CUSTOMIZED STORAGE RACK 1800X1600X400, CUSTOMIZED STORAGE RACK 1000X600X400, CABLE ORGANISER FLOOR MOUNT, PORTABLE LADDER, WORK STATION WITH STORAGE, CUSTOMISED WALL DADO, MAINTENANCE, PAINT TOUCH FOR EXISTING MAKE SHIFTPOP STRUCTURE, RE-ARRANGE LOOSE CABLES, WALL CLADDING, WALL MOUNTED STORAGE OPEN CONFIGURATION IN BSL, WALL PAINTING, WALL MOUNT STORAGE WITH DOOR, STORAGE UNIT WITH DOOR, RE-ARRANGEMENT ON WALL WITH PAINT TOUCHUP, WALL LEDGERS, PLANTER SELF WATERING, CORK BOARD PINUP, POSTER FRAME
Writing Pens (Q4), Stationery Holder/Pen Stand(V3) (Q4), Binding Covers (V2) (Q4), Markers and Highlighters (Q4), Carbon Papers (V2) (Q4), Staple Pins/Staples(V3) (Q4), Glue Stick (V3) (Q4), rubber bands (Q4), Pressure Sensitive Adhesive Tapes with ... (Q4), Desktop Trays ...