Loading…
Loading…
1,200 results • Best match
Patch work plus BC, E/Work, Culvert, Sign Board etc.
Scope of work includes repair of bitumen road and culvert.
Earth work. Pipe Culvert , WBM , BC, IPB, Road Safety Fixtures
Construction of culvert at RD 3000 of Jai Shree Drain.
Repairing and maintenance of street and culvert in M.C. Narnaund
Bituminous items, Earth work, Road safety fixture and Culvert etc.
Earthwork, WBM, B.C., TACK COAT, PIPE CULVERT, ROAD SAFETY FIXTURES
Earth Work, WBM, Tack Coat, BC, Sign Boards, Culvert etc.
Estimate for Construction of culvert at RD 8600 Bond Drain.
Construction of Sump well with pumping machinery and providing and laying of 450mm dia RCC NP3 for storm water pipe line from Culvert under Delhi Mathura highway to Sump well and provision of 300mm dia rising main from Sump well to exist (Recall)
DPLAN Const. of IPB Rasta from H/o Inder To H/o Pappu S/o Arjun and IPB Rasta From H/o Yashpal to H/o Baldev and Nala/Culvert from Siwan Majra Road to H/o Kirpal at Vill. Thamber Block Barara
Excavation of kachacha drain fron STP behind Surya vihar to the Railway culvert along Gurugram Rwari track for disposal of ariny water in laxman vihar, Surya vihar, laxman vihar, Sector-07 and near around the area) ward no.10, Zone-I, MCG.
CA NO. GE AF NO.1/GUR-24/2025-26 REPAIR/REPLACEMENT TO DUSTBINS, SECURITY/ COMPOUND WALLS, GRIT WASH, PATH, RAIN WATER HARVESTING PIT, DRAINS, FENCING, CULVERT ETC IN DOMESTIC AND G-BLOCK AT 54 ASP UNDER GE (AF) GURGAON NO.1
SPL REPAIR TO RAW WATER STORAGE POND AND REPAIR OF DRAIN FROM GP NO 16 TO CULVERT NEAR GP NO 17 DISCHARGING CHAMBER INLET DRAIN AND CERTAIN MISC ITEMS OF PUMP HOUSE AT MES COLONY AT HISAR MIL STN UNDER GE WEST HISAR
Estimate for Construction of 03 Nos Culvert type (Puliya) 1. Near Karam Dharam Society, 2. Vita Dairy, 3. Sukiriti Apartment G 58 and laying of RMC M 40 road near Karam Dharam Society in Sector 55 56 Ward No 30 under MCG (Recall)
Desilting of Open drain leg No.-II from Ashok Vihar (Bhimgarh Kheri) upto railway culvert Gurugram. Desilting and taking out of debris /silt rubbish etc from water flowing open drain by poklain and disposal of silt/malba at suitable place and all oth
Chuli Bagrian Pavement of Street from H/o Bhagirath s/o Parbhu to H/o Vajeer s/o Sheokaran and Const. of culvert near F/o Radheram S/o Kashiram jakhar Village Chuli bagrian Block Adampur SFC GP DEV/2023-24/111006
Earth Work , WBM , BC , Jungle Clearance , Pipe Culvert , Road Safety Features
providing wing wall culvert at RD 3950 at Jhazgarh link drain.
Earthwork, WBM, Bituminous concrete (BC), Pipe Culvert, Road Safety Fixtures etc.
Earth work, Bituminous carpet ,Tack coat,Water bound macadam, Patchwork.pipe culvert
CONST. OF ILPB STREET FROM MAIN GALI TO AANGANWADI, MAIN GALI TO GRAM SACHIVALYA AND CONST. OF NALA FROM H/O BHAG SINGH TO CULVERT AND CONST. OF NALA FROM KHEDA BABA TO FIRNI AND REPAIR OF DRAINS AT VILLAGE RACHERI BLOCK SHAHZADPUR DISTT. AMBALA
Construction of RCC Storm water draim from Mitthan Sweets to Ghaus Ali Culvert, RCC Draim in front of Ghaus Ali Kabristan and laing of RCC NP-2 Pipe in Sec-11, HSVP, Ward no. 14, MC Panipat.(For Contractors/L and C Societies-Both)
Renovation of master storm water drain Leg-I, in RCC box drain of size 2 x 3.30 x 2.50 Mtr and 12 Nos. Rain Water Harvesting pits of size/capacity 80 cum from Rezang La chowk to railway culvert no. 47, Palam Vihar, Gurugram.
Excavation of kachcha drain from STP behind surya vihar to the corner of HUDA park Sector-9A (Raiway Culvert) along Gurugram Rewari track for disposal of rainy water sector-4,Surya vihar, Laxman Vihar, Sector 7 and near around the area), Ward 14, Zon
Constrcution of 80 mm thick I.P Blocks Street From H/o Sunita Sharma to Pawan Gupta And Main Bandh to V.P Sukhi in Matidass Nagar Minor Street and Drain Type-I ,Type-II,Culvert And Other Minor Works Various Places in Ward no.9
for the safety of vehicles, provision of repairing of damaged portion of the parapet walls.
Earthwork,WBM,Tack Coat,BC, Paver Blocks, pipe culvert, road safety fixtures.
Earth Work, WBM, GSB-III, Box type Culvert, Laying of Paver Block.
Earthwok,GSB,WBM,BC,PIPE CULVERT,ROAD SAFETY FIXTURES,PAVER BLOCK etc.
Village Kamoda-Pavement with interlocking paver Block from Culvert. to School Rasta.
1.Construction of Culvert on entrance at 66kV S-Stn. Kalka to prevent water logging in yard area during the year 2021-22. 2.White-wash of Carrier room- Drawing section room- Gallery of Division Office and Head Clerk section room at 220kV S-Stn. Mad
Construction of 80 mm thick I.P Blocks Street And Drain From Shop of Vijay Tailer to Main Anla Culvert and H.no.14-A to H/o Gulati Shiv Partap Nagar And H.no.24 to R.35 Near Nour Beauti Parlor in Mahesh Nagar in Ward no.8
For the safety of vehicles, provision of repairing of damaged portion of the parapet walls
D Plan Const. of I/L tiles in open yard of Community center at Vill. Thakarpura, I/L tiles street from Gugga Marri to Karishan mandir at Vill. Khera, I/l Tiles rasta from Phirni to s/ghat at Village Rampur, Nala in Bhraman majra from pond to Culvert
Earth Work , WBM, BC, Pipe Culvert , Brick On Edge , Road Safety Fixtures, Brick Drain
Construction of RCC Drain Desho to Culvert Main road neer peer Budhu Shah Chowk
Covering of unpleasant view of drain no.6 on bus stand culvert MC Sonipat.
Re-construction of pipe culvert at RD 6M 3F 66 ft of Hathin disty.
Construction of RCC culvert and retaining wall near Kathuria Hotel ward no. 15, Gharaunda
Vill- Amarpur Jorasi, Block-Narnaul, Const of Culvert for Drainage for Storm Water(RECALL)
Construction of ODCT, RCC Culvert, CC Road and Parking area in front of CRB.
REPAIR OF NALA AND CONSTRUCTION OF CULVERT CROSSING WITH SLAB AT VILLAGE GARHI CHAJJU
Providing pipe culvert and cc approach road at 66 kV Sub Station HVPNL, Dukheri.
Const.of IPB Street and repair culvert, B/wall at village Bilaspur Block Bilaspur distt.ynr
Providing and Fixing screening/Mesh Fancing on Culverts in Jaggi colony, Motor Market, Baldev Nagar, Baldev Nagar Housing Board Colony or Ghel Drain In Municipal Corporation Ambala City.
Pucca work
As per the tender document.
Estimate for Replacement of Pipe Culvert with V.R Bridge at km. 0.150 of Nihalawas Minor
Repair of damage patch and culvert of Mohangarh Sub Minor from RD 0 to Tail