Loading…
Loading…
2,951 results • Best match
C/O RCC Slab culvert at Km. 74/680) (Under PDNA 2023
C/o 8.00 mtr. span RCC slab culvert at R.D. 2/105
Construction of 6.00 mtr. Span RCC Slab Culvert at Km 0/400)
SH C O 6.00 mtr span RCC slab Culvert at Rd. 1.240
Construction of 4.00 mtr. span RCC slab culvert at R.D. 4/100)
C/o 10.00 meter Span RCC Slab Culvert at RD 0/870
Const. of 3.00 mtr span RCC slab culvert at RD 0/180.
C/O RCC Slab culvert at Km. 73/735) (Under PDNA 2023
Construction of 3.00 mtr. Span RCC slab culvert at Km. 1/675).
C/o RCC Slab Culvert at RD 0/250 and 1/350
Construction of 1.00 mtr span RCC slab culvert at RD 0/110
C/O 1.00 mtr span RCC Slab Culvert at RD 2/000
Construction of 8.00 mtr span RCC Slab Culvert at R.D. 4/900)
Construction of 8.00 mtr. span RCC slab culvert at R.D. 3/990)
C/o 2.00mtr. Span Slab Culvert at RD 1/200 under Deposit
Construction of 6.00 mtr. Span RCC Slab Culvert at km 31/840
C/o 10.00 mtr. span RCC slab culvert at R.D. 5/450
C/O 3.00 mtr span RCC slab culvert at RD 2/120
Construction of 3.00 Metre span R.C.C. slab culvert at RD. 0/440
C/O 10.00 mtr. Span RCC slab culvert at RD 84/090
C/O 2.00 mtr span RCC slab culvert at RD 1/015
Construction of 3.00 mtr. Span RCC Slab Culvert at RD 2/300
C/o 6.00 mtr Slab Culvert at RD 0/975 Under MMGSY
C/o 3.00 metre span RCC slab culvert at RD 2/060.
Construction of 2.00 Metre span RCC slab culvert at RD. 1/900)
C/o 3.00 mtr slab Culvert at RD 2/360. PDNA 2023
SH C O 12 Mtrs. Span slab culvert at RD. 0..615
C/o 8.00mtr span slab culvert at RD 3/830) Under MMGSY
C/O 2.00 Mtr. Span RCC slab culvert at RD 0/675
Construction of 6.00 mtr. Span R.C.C. Slab Culvert at R.D. 2/060)
ROFD in km 0/00 to 1/510, C/o 4.00 mtrs span RCC culvert at Rd 0/345, C/O 900mm dia RCC Hume Pipe culvert at RD 0/655, 0/900
Extension of Culvert with 900 mm dia Hume Pipe Culvert at Rd. 0/210, Wing wall at RD. 0/207 to 0/210 and R/Wall at Rd. 0/196 to 0/207
ROFD in km 0/00 to 0/800 , C/O 4.00 mtrs span RCC culvert at rd 0/470 and 600mm dia RCC Hume Pipe Culvert at rd 0/550) (under OTMNP Head)
(SH formation cutting in km 3/525 to 3/870 C/O R/Wall at RD 3/965 to 3/990 P/L900 mm dia RCC hume pipe culvert at Rd 3/795 P/L 600 mm dia RCC hume pipe culvert at RD 3/945 and P/L GSB WMM and SDBC in km 3/525 to 4/020)(Under SCSP Head)
C/o 900 mm dia hume pipe culvert at Rd 0/080, 0/195, 2/100, 600mm dia hume pipe culvert at Rd 0/735, U-Shape drain with edge wall at Rd 0/195 to 0/255 (Left side), 0/300 to 0/315 (Right side) and 0/405 to 0/495 (left side and wing walls at Rd 0/069
C/o 900mm dia Hume Pipe culvert at RD 0/150 and P/L GSB, G-II and Metalling Tarring at RD 0/00 to 0/338
C/o Counter for Retaining wall as a Protection work for abutment, edge wall, wire crate and hume pipe culvert in Marotan side) under Nabard RIDF-XXVI
P/L 600mm dia R.C.C. hume pipe culvert at R.D. 0/600 C/o R/wall at R.D, 0/650 to 0/655 with wing wall respectively
Providing and laying WBM G-I in km 3.670 to 5.00 and two Nos 900mm RCC Hume pipe culvert at RD 3.670 and 4.070 alongwith wing walls
Extension of 900mm dia hume pipe culvert at R.D. 48/270 alongwith wing wall at R.D. 48/257 to 48/269 and 48/271 to 48/276
SH C/O Hume Pipe Culvert 900mm Dia. At RD 0/290 and 0/320 and B/wall in PCC at RD 0/325 to 0/405
Construction of 900 mm dia RCC hume pipe culvert at Km. 4/507 and providing and laying cement concrete pavement in Km. 4/450 to 4/550
/o Breast wall /Edge wall at R.D.0/400 to 0/422 and P/L P/L 900mm dia R.C.C. hume pipe culvert at R.D. 0/398
SH C O 900 mm dia Hume pipe Culvert at RD.0.80 ,R.Wall at Rd. 0.560 to 0.575 and kharanja stone soling at Rd. 0.0 to 0.075)
Construction of 900 mm dia RCC hume pipe culvert at Km. 4/507 and providing and laying cement concrete pavement in Km. 4/450 to 4/550
Construction of 900mm Dia Hume Pipe culvert at Rd 0/050 and wing Wall at RD 0/41.50 to 0/50 and 0/52 to 0/60.50
C/O hume pipe culvert toe wall at RD. 0/195 and wing wall at RD. 0/185.75 to 0/193.75 and 0/196.25 to 0/204.25)
C/o 900mm dia Hume pipe culvert at RD 0/250 and P/L GSB, G-II and Metalling Tarring at RD 0/00 to 0/338
Construction of Cement concrete pavement at RD 0/070 to 0/436 and 0/468 to 0/505 Hume pipe culvert and Embankment at RD 0/489)
Providing and laying G-I,G-II, Hume pipe culvert HPC along with Retaining wall at various Rds between Rd. 0/00 to 2/00 (CM Announcement