Loading…
Loading…
2,951 results • Best match
Construction of 6.00 mtr. RCC slab culvert at RD-01/900
SH. Construction of 6.00 mtrs slab culvert at RD 4/060.
C/O 6.00 Mtr RCC slab culvert at RD 0/450
C/o 2.00 meter RCC Slab Culvert at RD 3/720
C/o 4.00 meter Span Slab Culvert at RD 3/00
Construction of 4.00 mtrs RCC slab culvert at RD, 0/180
SH Formation cutting ROFD construction RCC Slab Culvert PCC Edge Wall
Construction of 3.00 mtr. R.C.C. Slab Culvert at R.D. 3/690)
C/o 3.00 meter span Slab Culvert at RD 4/615
Construction of 3.00mtr. span RCC slab culvert at Km. 2/125).
Construction of 400mtr Span RCC Slab Culvert at RD 0015 OTMNP
(SH-C/o 4.00mtr Span Slab Culvert at RD 4/045)
SH C.O approaches of slab culvert at RD 0.030 to 0.300
C/O 3.00 mtr. Span slab culvert at RD. 2/450
SH C/O CD Work Slab Culvert at RD 7/285
Construction of 6.00 metre span Slab culvert at R.D. 3/915
C/o 1.00 mtr. Span Slab Culvert at RD 0/365
SH C.O 3.00 meter span RCC slab culvert at RD 8.930
C/O 6.00 mtr Span slab culvert at RD 08/675
C O 8.00 Mtrs. Span RCC slab Culvert at RD. 5.810
(Sub Head - repair of RCC Slab Culvert at Km. 10/050)
C/O 3.00 Mtr span slab culvert at RD 0/350)
Construction of 3.00 metre span RCC slab Culvert at RD. 4.600
Construction of 8.00 Mtr. Span Slab Culvert at RDs 9/00)
Construction of 3.00 metre R.C.C. Slab culvert at R.D. 42/465
Construction of 6.00 mtr Span RCC Slab Culvert RD 0/396
Repair of 6.00 mtr. Span Slab Culvert at RD 3/080
Repair of 6.00 mtr. Span Slab Culvert at RD 3/080
Const of link road Govt. Middle School Badmana to Behrian Basti via Lambad Basti in GP Badmana km 000 to 1500 SH Formation cutting filling between km 000 to 0510 and Const of 6 meter span RCC slab culvert at RD 0270 under MNP
Balance work for the construction of link road to Ribba Kanda km 0/00 to 11/725. (Sub - Head - Formation Cutting, R/wall ,B/wall,X-Drainage Work with slab Culvert, Papapets, Katcha Drain,Sign board, Kilometer stone and Dumping structure etc. in Km.
Balance work for up-gradation of Shimla Mandi Road Via Tattapani (Portion Chail chowk to Baggi Km. 172/000 to 181/400) RIDF-XXVII, Distt. Mandi (H.P) (SH C/o R/walls, B/walls, Drain, Extension of slab Culvert, Parapets, Paver tiles, Rain Shelter and
Restoration of rain damages on C.o link road from Kulhan Bridge to Zara Singh House G.P Bilaspur in Km 0.0 to 1.700 SH Formation Cutting between RD 0.0 to 1.700 C.O 4.00mtr Span RCC Slab Culvert alongwith approach walls at RD 0.625 Under NDRF
A.R and M.O NH-305 Sainj-Luhri-Aut road Km. 0.0 to 53.00 (SH. Providing and laying tarring work in Km. 0.00 to 1.700, construction of U shape drain in Km. 0.160 to 0.480 and construction of slab culvert 2.0 m span at RD 0.300.
C/o road and Retaining wall from House of Bhajan Singh to Katirdoo Majra, G.P. Kashmirpur, C/o R.C.C. slab culvert and Retaining wall near Banka Ram Chandel House, Khera, C/o link road from Jatt Service Station to Borewell of Bhag SingH RADIYALI
c.O LINK ROAD TO KABIR PANTHI BASTI WARD NO 5 GP SERI KK 0.0 TO 1.200 SH C.O 5.8 METER WIDE FORMATION CUTTING INKM 0.0 TO TO 0.630 .6 METER SPAN RCC SLAB CULVERT AT RD 0.720 C.O SOLID COUSEWAY IN BETEEN KM 0.0TO 0.630
Job 12 Restoration of rain damages of Tahliwala Bathri road km.0-0 to 8-0 Sub Head P-L WMM, DBM and BC at RD.0-250 to 0-350 L 100mtrs and Construction of 2mtr. Span RCC slab culvert Under Black Spot
Restoration and reconstruction of sampark Marg fom link road to the H/o Sh. Ram Swaroop, GP Khad SH P/L 60mm paver block RD 0/180 to 0/300 and C/O 1.50m span RCC slab culvert at RD 0/237 under MMSY
RRD on Sadwan to Chambapattan road Km. 0/0 to 6/315 (SH C/o 2.00mtr.RCC slab culvert at RD. 6/110 and V-Shape drain from RD. 6/080 to 6/108 6/112 to 6/140 C/o retaining wall at various RDs. ).
SH Construction of wire crates at RD 0/423 to 0/427 0/460 to 0/643 and 0/646 to 0/710 C/o Solid Causeway at RD 0/427 to 0/460 and C/o Hume pipe culvert at RD 0/643 including wing walls
Restoration of rain damages on Chamba Tissa road km 48/0 to 56/500 (MDR-85) (SH Providing R/walls, culvert, causeway, drain etc. between Rd 48/779 to 56/350 (UNDER PDNA 2023)
Construction of RCC Hume Pipe Culvert at RD. 3/930, Retaining wall, Wire Crate work and U-Shape Drain at RD. 3/830 to 3/930)
Construction of RCC Hume pipe culvert at RD 0.550 and 0.960 and W beam metal crash barrier at RD 0.415 to 0.465 and 0.550 to 0.650
C/O 900mm dia Hume Pipe Culvert at Rd 0/600 and 0/915 P/L Kharanja Stone Soling in Km 0/500 to 1/165
P/L G-I and G-II ,Hume pipe Culvert , PCC V-Shape drain , R/Wall and B/Wall in Km 0/00 to 1/00
SH Extension of hume pipe culvert at RD 0/480 and wing wall at RD 0/468 to 0/478 and 0/482 to 0/488
Formation cutting at RD. 0/0 to 0/300, Wire Crate at RD. 0/0 to 0/250 and Hume pipe Culvert at RD. 0/175)
P/L G-I and G II Hume pipe culvert, PCC V shape drain R/wall and B/wall in km. 0/00 to 1/00
SH C/O B/wall in Stone masonary at Rd 0/602 to 0/632 and Hume Pipe Culvert 900 mm dia at Rd 0/300
C/o R/wall at Rd 3/959 to 3/971.40, 3/958 to 3/990 and One no hume pipe culvert at Rd 9/532)
Providing and Laying Cement Concrete Pavement at RD 0/0 to 0/110 and Construction of 900 mm dia Hume pipe culvert at RD 0/100 )