Loading…
Loading…
2,951 results • Best match
Construction of Retaining wall RD. 0/325 to 0/341 and C/o Hume pipe culvert at RD. 0/425 along with Wing walls).
SH C/O retaining wall at RD 1/065 to 1/085 and C/O Hume pipe culvert at RD 0/810 under SCSP
C/O 900mm dia hume pipe culvert at RD. 0/750 and Metalling and Tarring in km. 0/00 to 0/860).(Under SCSP).
SH Construction of Hume pipe culvert at RD 0/540 0/910 and construction of retaining wall in different RDs and formation cutting etc
SH Hume pipe culvert at Rd 1 130 2 700 2 800 and M T in KM 2 00 to 2 850 Under SCSP
SH Providing and laying RCCP GSB WMM SDBC Retaining wall 900mm dia Hume Pipe Culvert and drains in RD 0/0 to 0/750
C/o Hume pipe culvert at Rd 0/050 alongwith wing walls and R/wall at Rd 0/615 to 0/630 under PDNA
Constrion of Wire Crate, 2.00 mtr, span RCC Culvert, Hume Pipe Culvert, C.C. Pavement, Drain with Edge wall and Metalling and Tarring of Kuru to Ghallour road Portion) (OFC DEPOSIT )
C/O 8.00 Mtr. Span RCC slab culvert at RD 0/085 along with wing wall and crate work on upstream for protection of RCC slab culvert
C/O 8.00 Mtr. Span RCC slab culvert at RD 0/085 along with wing wall and creat work on upstream for protection of RCC slab culvert
R/R damages on Sainj Sainjeli via Gannu road Km. 0/00 to 5/500 (SH C/o R/wall at RD 1/230 to 1/240, 5/390 to 5/405, 5/420 to 5/450, 900mm dia Hume pipe culvert with wing walls at RD 1/120 to 1/205 and B/wall at RD 1/180 to 1/210, 5/460 to 5/475) unde
C/o Kuffer Dadar to Koli ka Bag Road km. 0/00 to 7/365 (SH - C/O balance work of 900 mm dia hume pipe Culvert at RD. 4/420, 5/015, 6/840, 6/960, 7/015 and 7/285 , C/O R/wall in PCC at RD. 0/975 to 0/995, 1/290 to 1/310 and 6/920 to 6/935 and C/O
R/R Damages on Sarahan Haripur Road Km 0/00 to 10/00 (SH C/O PCC R/Wall at RD 5/600 to 5/620, 5/705 to 5/730 and 6/270 to 6/300, 900 mm dia hume pipe culvert at RD 5/860 and PCC B/Wall at RD 4/585 to 4/595, 5/420 to 5/440 and 6/200 to 6/210) under PD
C/O link road village Kajwa km. 0/00 to 2/150 (SH C/O wire crate R/Wall at RD. 1/015 to 1/025, 1/135 to 1/155, 1/210 to 1/225 and 1/270 to 1/285, C/O B/Wall at RD. 1/030 to 1/070 and 1/700 to 1/715 and C/O 900mm dia RCC hume pipe culvert at RD. 1/
Construction of 900mm dia R.C.C. Hume pipe culvert at R.D. 1/800, 2/500, 2/600, 2/700, 2/900, 3/200 and 3/450
SH C-O 900 mm dia hume pipe culvert at RD 0-660 and Metalling AND Tarring km 0-0 to 0-400 under OTMNP
C/O 900 mm dia RCC hume pipe culvert at RD 0/120 and both side wing walls). Under MMGPY scheme ID MMG/2021/5.
ROFD at km 0/0 to 1/750 P/L 900 mm dia RCC Hume pipe culvert at Rd 0/965, 1/00 , 1/070)
Providing and laying Soling in Km.4/200 to 4/625, Hume pipe culvert at Rd.4/600, V shape drain and essential parapets etc
C/o 900 mm dia hume pipe culvert at Rd 0/165, 0/383, 1/035, 1/285 and 1/407 along with wing walls
C/O 900mmm dia hume pipe culvert at RD. 0/999 and 0/712 providing patch work and unlined drain at various RDs ).(Under PDNA).
C/O 900mm dia hume pipe culvert at RD. 0/690 and 0/895 and P/L GSB at RD. 0/0 to 0/500
Construction of R.wall, wire crates, Hume pipe culvert, P.L GSB WMM M.T ,P.L Cement concrete pavement and V-shape drain in Km. 0.00 to 1.200)
SH C o 900mmdia Hume Pipe Culvert at RD 1..800, R Wall at RD. 0.21 to 0. 225, 0.615 to 0.630, 1.150 to 1.180)
C/O R/Walls at various RDs 36/630 to 37/745 and wing walls both sides and Hume Pipe Culvert at RD 36/970)
Formation cutting ,Hume pipe culvert at Rd 3/265 ,3/445 along with wire crate wing wall and C.C. Pavement 3/080 to 3/140
SH Construction of 900mm dia hume pipe culvert at RD 3.645 providing and laying cement concrete pavement at RD 0.360 to 0.550 3.100 to 3.795
C/O 5/7mtr. wide formation cutting i/c R/Wall C/O hume pipe culvert from RD. 0/0 to 0/450 Under MMGSY
Construction of Retaining wall at RD 4/150 to 4/165 and Hume Pipe Culvert at R.D. 1/455 and 1/525 alongwith wing walls)
Construction of 3.00 Metre R.C.C. slab culvert at RD. 1/570)
Construction of 6.00mtr. span RCC slab culvert at Km. 0/775)
SH- C/O 6.00 mtr. Slab culvert at RD. 0/240).
C/O 1.50mtr span RCC slab culvert at RD. 0/300
Construction of 8.00mtr Span RCC Slab culvert at RD.10/920).
Construction of 3.00mtr Span RCC Slab culvert at RD 0/255).
C/o 3.00 mtr sapn slab culvert at km 12/600
SH. Construction of 6.00 mtrs slab culvert at RD 2/285.
C/O 3.00 mtr. Span slab culvert at RD. 12/350
C/o 6.00 meter Span Slab Culvert at RD 0/045
C/o 4.00mtr. Span RCC Slab Culvert at RD 8/040
C/o 6.00 meter Span Slab Culvert at RD 2/450
Construction of RCC slab culvert 6.00mtr. Span at R.D. 3/895
Construction of RCC slab culvert 6.00mtr. Span at R.D. 3/895
SH C.O 3.00 meter span RCC slab culvert at RD 8.000
C/o Slab Culvert 2.00mtr Span at RD 0/610 OTMNP
SH C.O 3.00 mtr. Span RCC slab culvert at RD 4.250
Construction of protecting abutment of slab Culvert at RD. 7/500
C/o 4.00 meter Span Slab Culvert at RD 0/045
C/o 2.00 meter RCC Slab Culvert at RD 0/525
C/O 3.00mtr span RCC slab culvert at RD. 0/080