Loading…
Loading…
6,811 results • Best match
Scheduled Cast Scheduled Tribe Development Department-Ambedkar Settlement Project-Sulthan Bathery LAC-Thengumoodkunnu - Vijayankunnu Nagar-Footpath Concrete and Culvert,Poothadi GP- Civil Work- 1.0 cr.
REPAIR MAINTENANCE TO SEWAGE LINE MANHOLES DRAIN CULVERT FOOTPATH AND OTHER MISC WORKS AT 17FBSU 257 SU AFSC MUTHUTHARA 340 TRU UNDER GE AF TVM
SO-76/27Ward-21-Kaipadamugal Karippassery Mugal Virappattumula Cherumpuram Interlock laying Marthoma Road Covering Slab Iyyat Road drain Construction New Road Junction Culvert Construction Ward21
GENERAL CSIND BM CANAL 2ND REACH WORKS Construction of Culvert across Badagara Mahe Canal Bund Road on right bank at Chadayampalam Kottapally General Civil Work
Pro.No.521/27-Ambazhakkonam road reconcreting,Karanikkonam road retarring culvert construction,Ambedkar nagar Kaithakkuzhi vilayil road retarring Aliyil tharatta different footpaths concreting-in Njandoorkonam ward
This estimate is prepared under premonsoon works 2022-23 which includes removing damaged covering slabs of CC drains, cleaning blocked cc drains as well as earthen drains, cleaning chocked,culverts, clearing waterlogging, cutting overhanging
This estimate is prepared under premonsoon works 2022-23 which includes removing damaged covering slabs of CC drains, cleaning blocked cc drains as well as earthen drains, cleaning chocked,culverts, clearing waterlogging, cutting overhanging
This estimate is prepared under premonsoon works 2022-23 which includes removing damaged covering slabs of CC drains, cleaning blocked cc drains as well as earthen drains, cleaning chocked,culverts, clearing waterlogging, cutting overhanging
This estimate is prepared under premonsoon works 2022-23 which includes removing damaged covering slabs of CC drains, cleaning blocked cc drains as well as earthen drains, cleaning chocked,culverts, clearing waterlogging cutting overhanging
This estimate is prepared under premonsoon works 2022-23 which includes removing damaged covering slabs of CC drains, cleaning blocked cc drains as well as earthen drains, cleaning chocked,culverts, clearing waterlogging,
GENERAL-Construction of drainage in Panchayath lane for leading rain water from the outlet of the culvert at km 1/230-Nellamkandi Avilora Katharammal Choyimadam Anappara Padathumkuzhi Punoor road -General Civil Work
Annual Plan- Balavadi Ambedkar Colony Thekkumala Road D R, Culvert in ward no. IX of Vadasserikara G P 2023-2024-VGP project no.104/2024-General Civil Work
kyip deposit work 24 25 Vadakara block panchayath construction of culvert across Azhiyur Branch canal near ch 2.600km at Vellolimeethal at Chorode gramapanchayath
Annual Plan-ward 9 ward 10 Kallam Velathussery Road Tarring,Re concreting,Irish drain, protection wall and completion of culvert-TKY/183/2023-24-General Civil Work
LAC-ADS-MLA ADS 2023-24 Sri Sajeev Joseph MLA - Irikkur LAC-Construction of Culvert at Palampadi - Munnur Kochi Road in Naduvil Grama Panchayath-General Civil Work
MLA-SDF- 2021 - 2022 - Mankada Legislative Assembly - Mankada Block - Work Proposed By M.L.A Sri. Manjalamkuzhi Ali - Vadakkekulamb Kizhakkekulamb Culvert Construction In Makkarapparamba Grama Panchayath-Work Code 6815
497/24 25 Arattuchira Ambalakulam Road Retarring Culvert Maintenance Vannappurampady Road Concrete Nathaji Road Renovation and Subcentre road Retarring Ward 04Vannappurampady Road Concrete , Nathaji Road Renovation and Subcentre road Retarring Wa
The estimate envisages the dismantling of existing culvert portion Construction of new culvert using PCC 1 3 6 bed concrete M15 for footing abutments wing walls parapet, RCC M20 for bed block and slab back filling by granular materials,
Pre-Monsoon-2022-23 Clearing the Chocked Culvert, Existing Drainage, Clearing grass and Light Jungles , removing water from stagnated area by providing earthen drain ,Cutting leaned trees and damaged branches
CULVERT
culvert
Culvert
CULVERT
CULVERT
Culvert
Culvert
Culvert
CULVERT
CULVERT
Culvert
CULVERT
Culvert
GENERAL-Pre-monsoon work 2022-23-NH 966-Clearing drains, chocked culverts, light jungle, cutting earthern drains, cutting of over hanging branches of trees etc between Km 64/00 to Km 87/00-Pre-monsoon work 2022- 23-NH 966-General Civil Work
Premonsoon 2020-21 Clearing of blocked up culverts cleaning of drain,Cutting of elevated berms,Filling up pot hole and allied works in Eranjal -Tiruvanchoor 0/000 -5/400,, Kanjikuzhi - Eranjal 0/000-2/150, Pallom Loop 0/000 -4/490,Pallom -Thottakad
Kottiyoor g p 2021-22 ST corpus fund -Construction of a culvert across Ambayathode Thazhe palchuram Road near Thazhe palchuram S T colony
(Re tender) Vamanapuram BP 2025-26 Construction of Culvert across Parukkappara Thodu Prj. 62/26 Thalayal Division-Pullampara GP Prj. No. 35/26
In this estimate provisions are included for dismantling old culvert earth work for foundation Ring Bund Bailing out water Driving Down Coconut Pile Construction of dry rubble flooring at cross drainage works PCC 1 3 6 for foundation PCC M30 et
GENERAL-Urban flood 2026-Cleaning of Kariyil thodu at Aryankuzhy culvert upstream and downstream and New Rajasthan marble portion in Kamaleshwaram ward of Thiruvananthapuram Corporation-General Civil Work
Proj 180 Sasthamangalam ward-Maintenance of road drain ,culvert in various road ,bylane of Kochar road,pullaekonam lane SMRA kurups lane sankar road residents in sastha mangalam ward
Pro No514/22 -2021-22 AYYANTHOLE ZONAL - DEMOLISHING AND CONSTRUCTION OF DRAIN AND AND CULVERT AND PROVIDING COVERSLAB AT MOORICHANDHA MUNCIPAL QUARTERS ROAD IN DN 49
MLASDF 2019- 20 Hon. Oppo.Leader Sri. Ramesh Chennithala- construction of Kandilasseril Pattante muttel padavunkal pitching culvert road in ward 10 of Chingoli GP in Harippad LAC
CMLRRP - 2020-21 (Phase 3) Kannur District - Payyannur LAC - Eramam Kuttur GP - Chattiol Kodannur Road Strip Resurfacing and Construction of Culvert (AS Order Sl No.145)
Annual Plan-2023-24-Maradu Municipality Proj. No. SO 597/23-24 Ayini thodu renovation from society road culvert to east reach 1- General Civil Work
Pre Monsoon work 2021 22 Clearing chocked culvert side drains road side vegetation cutting dangerous branches of trees during monsoon season in Kottakkal LAC Kuttippuram Section
MPLADS 2023-24 - Construction of Road to Karukaparambu - Chirakkupurathu and Construction of Culvert at Chirakkupurathu at Karukaparambu SC Colony in ward 09 of Thalavady GP(SC)
SR 2019-20 Construction of CC drain, retaining wall and allied works between 7/800 to 8/440 and extension of culvert in Keralapuram Ayur road.
CSGP 2020-21.Project No 110/21.Construction of culvert at Thevalakkad at Thykkal Bhagam in Paruthyampalli Champakkad road in ward-5of Cherthala South Grama Panchayath
Reconstruction of culvert and providing drainage work to Kappad Thusharagiri Adivaram road between at Km 49/000 to 50/000 under Koduvally section General Civil Work
Premansoon work 2022-23 -Clearing chocked up culvert and drains, Cutting dangerous trees and branches of trees,urgent stray pothole filling etc under Roads Section Pandalam