Loading…
Loading…
11,129 results • Best match
Improvements to Riding Quality to Government Roads including Construction of Minor Bridge, Box Culvert in lieu of existing Bed Level Causeway and Drain in Dharmapuri (H) CandM Sub Division (SLM-20)
Construction of Minor Bridge at km 0/6 and Construction of Box Culvert at Km 1/4(i) and 1/4(ii) of T.Mampatti - Edayapatti Road in lieu of existing Causeway
Wdg from Two Lane to Four Lane and Strengthening at Km 48by2 to 50by6 of Erode to Karur Road including Reconstruction of Box Culvert at Km 49by4 50by4 and Reconst of Slab Culvert at Km 49by6 and Construction of Well Protective wall at Km 48by6
Nagercoil Corporation Providing Culvert near Fish Market Street at Ramanputhoor in ward no 30
Construction of RCC Culvert to AiyyakannuThambiran Nagar at Neikuppi Panchayat in Thirukazhukundram Panchayat Union
Nagercoil Corporation Providing Culvert and Paver block in Madan street at ward no.35
Nagercoil Corporation Providing small Culvert in Rajiv Nagar at ward no .42
Construction of Drain and Culvert Venkateswara Nagar Extension in Vikkravandi Town Panchayat
Nagercoil Corporation Providing Cross Culvert at Rajapathi Street in Ward no.39
Nagercoil Corporation Providing Drain Culvert at Ragmath Garden in Ward no.47
Nagercoil Corporation Providing Culvert at CTM Puram Main Road (Gandhipuram) no.49
Nagercoil Corporation Providing Culvert at Annai Therasa Street in ward no.32
Widening Strengthening, Improvements to riding quality including Construction of Minor Bridge Box Culvert Toe wall Box Culvert Works in the Government roads of Vedasandur Highways CandM SubDivision MDU026
Widening from Single Lane to Intermediate Lane and Strengthening at km 0_0 . 1_2 of Amarambedu Road including reconstruction of box culvert at km 0_2 widening of box culvert
Reconstruction of Box culvert at Km.39/6 Thirumazhisai - Uthukkottai road
Providing Box Culvert at Km 11/4 Grand Northern Trunk Road
Construction of Box Culvert at Km 4_8 of Ariyalur Vilangadupakkam Road
Urban Impts Widg from End to End and Stg at km 12 4 of Erode Chennimalai road M108 including Reconstruction of box culvert at km 12 6 13 2 Widening of pipe culvert at Km 12/10, widening of slab culvert at km 12/8, constn of drain cum footpath
Widening from Single Lane to Intermediate Lane and Strengthening at km 0/950 - 2/8 of Kunnam - Vadarangam Road including reconstruction of box Culvert at Km 0/10, 2/4, 2/6 and construction of retaining wall at km 0/10, 1/2 TNJ-71
Formation of Flood Carrier Canal in Cauvery Kattalai South Vellar in Karur District 1st reach of Slice 1 LS from 0.00km to LS 4.10km linking scheme. Sub Work Construction of Box Culvert at KM 193 470 across the NH 67 road at LS 1800m
Widening from Single lane to Intermediate Lane and Strengthening at Km 1/6 - 6/6, Km 6/8 - 9/2ndKm 9/4 - 16/610 of Suriyagoundampalayam - Elachipalayam road (via) Ramapuram (M-1238) including Construction of Box Culvert at Km 12/4,Construction of We
Urban Impts Wdg and Strg IRQP including Reconstruction of Box Culverts Wdg of Culvert Construction of Drain construction of Culvert Construction of Retaining Wall and providing Paver Block on Government roads in Arcot H CM Sub Division - TVM-13
Package No.5 Construction of RCC Slab culvert in Kottaimettu salai at Maharajapuram
Construction of RCC Slab Culvert at Ward No.1 Periyasamy Thottam Across Odai
Construction of RCC slab culvert at ward No.9 in Pattanam Town Panchayat
Construction of RCC Slab Culvert at Ward No.1 Sarapalli Eri Across Oda
CONSTRUCTION OF CULVERTS IN WARD NO 16
Widening Strengthening Improvements to Riding Quality including Widening of Box Culvert and Pipe culvert and Re construction of Box culvert Works in the Government roads of Athoor Highways C M Sub Division MDU 005
Nagercoil Corporation Providing Main Cross Culvert work at Krishnankovil Sannathi Street in Ward no.9
Nagercoil Corporation Providing Culvert at Pallivillai Main Road opp to sudalaimadan Kovil Road ward no_7
Nagercoil Corporation Providing Cross Culvert and Drainage work at Meelasoorankudi Karthigaivadali in Ward no.45
Nagercoil Corporation Construction of Culvert and Drainage Raising at Cave Street at Ward no.23
Constuction of culvert at Agaravattaram Kuruviyampallam in Agaravattaram Panchayat at Kollidam Block at Mayiladuthurai District
Widening, Strengthening and Improvements to Riding Quality to Government Roads including Construction of Retaining Wall, Box Culvert, Reconstruction of Box Culvert in Omalur (H) (CandM) Sub Division (SLM-14)
Widening Strengthening Improvements to riding quality Construction of Box Culvert including Reconstruction of Box Culvert in the Government roads of Muthukulathur and Kamuthi Highways C M Sub Division MDU023
Widg and Impts Impts IRQP Constn of well protective walls Constn of Rtg Walls Constn of box culverts ReConstn of Box culverts Curve Widg and including Up Keeping for a period of 60 Months on Govt Roads in Mulanur H C M Sub Dn Pac No 55
Nagercoil Corporation Providing Culvert in New Colony Vetha Nagar at ward no.42
Nagercoil Corporation Construction of Culvert at Vanchiyanthan Puthu theru in ward no.13
Reconstruction of Box Culverts and Construction of Minor Bridge in Government Roads in Attur (H) CandM Sub Division (SLM-4)
Reconstruction of Box Culverts and Construction of Minor Bridge in Government Roads in Attur (H) CandM Sub Division (SLM-5)
Construction of Box Culverts and Reconstruction of Minor Bridge in Government Roads in Attur (H) CandM Sub Division (SLM-3)
Wdg from Single Lane to Two Lane and Stg at km 8.0 - 10.6 of Sendurai - Nakkambadi - Kadur road including Reconst of Box Culvert at Km 8.2, 8.6, 8.10, Wdg of Slab Culvert at Km 9.2 and Const of Well Protective wall at km 9.2-VPM-011
Additional Work for Pipe Vented causeway at Kilandurai to Devathanam Road at Kilandurai Panchayat
Construction of Causeway at Thalakarai ST colony in Anthiyur Block of Erode District under SADP 2022-23 Scheme
Construction of Culvert at Ma. Po. Si. Nagar in Gummudipoondi Town Panchayat.
Widening, Strengthening and Improvements to Riding Quality to Government Roads including Construction of Box Culvert in lieu of existing Bed Level Causeway and Retaining Wall in Attur (H) (CandM) Sub Division (SLM-8)
Widening from Single lane to IntermediateaneStrengtheningreconstruction of box culvert, Construction of Box culvert, Widening of pipe culvert including construction of Toe wall and Protective works in Government Roads of Thiruchuli H C and M Su
Formation of Road and Construction of Culverts at TANSIDCO Industrial Estate, Kadambadi in Chengalpattu District
Formation of Road and Construction of Culverts at TANSIDCO Industrial Estate, Kadampuliyur in Cuddalore District
Improvements to Riding Quality and Reconstruction of Box Culvert, Construction of Box Culvert, Minor Bridge, Providing Speed Breaker works in the Government roads of Thiruppathur Highways C MSub Division MDU131