Loading…
Loading…
6,787 results • Best match
Formation of CC Road on left side of Ganga Nagar Nala from Moula Ka Chilla to Ganga Nagar Culvert in 31-Reinbazar, Santosh Nagar, Circle-7 CRZ GHMC(Recall) Rs. 28.30 Lakhs
Repair to scoured berm by Construction of 2Vents of 1000mm Dia Culvert in Km.79/4 and raising of sudden dip at Km. 108/0 of Bhadrachalam-Chandrupatla road in Mulugu District
LAYING OF 450 MM DIA RCC PIPEINE FROM RAMALAYAM TEMPLE TO CULVERT AT PEDDA CHERLAPALLY IN CHERLAPALLY WARD NO.3 OF KAPRA CIRCLE, GHMC. (Reserved for S.C, S.T and Waddera Labour Society)
Laying of CC Road from Harinarayana house to mAnju naik house and construction of CC Drain & culvert at Manju naik house at ward no. 16 under SFC Grant 2016-17 in HZNRNP
Construction of drain and Culvert at Narsimharao house, at Girls School, at Society office, at Kothuri Prasad House, at Gundela Suryanarayana house at 32 ward in Kodad Municipaltiy under Municipal General Fund
Construction of CC Drain from H.no:4-5-61/4(Babu sha House) to H.no:4-5-BA0002 and culvert at H.no:4-5-BA0002 in wardno:5 Under Pattana Pragathi Fund
Laying of CC road frin Madhu (H) to Anji Babu(H), Dasari Chandraiah (H) to A Bhumaiah (H) and CC road from Bridge Culvert to Allu Samuel (H) in Ward No.15.
Constructions of RCC SWD open nala and Box drain at Nadeem Colony culvert to Mother Therisa and other location in Tolichowki-68, Circle No.13 (KZ), GHMC (re Call) Item No.4
Construction of CC Drain and Culvert from Vemula Kanakaiah (H) to Sullage Drain and La;ying of CC Road from Masjid to Katika Anasurya (H) in Ward No.14 in Bellampally Municipality
Laying of RCC 450mm and 300mm dia NP3 pipe line with Socket and Spigot from 32-70/52 to Culvert near RK Puram Flyover in Ward No.136,Neredmet,Malkajgiri Circle,GHMC
Construction of SWD from Prakruthi vihar to Nagi reddy cheruvu culvert and laying of precast slabs at different locations in Yapral, Neredmet Division no.136 in GHMC Malkajgiri circle-28, GHMC. (Recall)
Construction of 1 No. of 1.0 m dia pipe culvert at km 8/800 to 9/0 on Kadipikonda to Warangal road from km 7/240 to 9/240 in Warangal District
Construction of CC Drain from Afroz (H) to Naseeruddin (H) to Samiuddin (H) to Latheef (H) & CC Culvert near MRO Office at ward No.4 in Sadasivpet Municipality under 14th FC Grants
Construction of CC Drain with RCC Culvert from Krishna Reddy house no:4-3-278 to 4-3-278/A/2 in Ward no.8 in Peddapalli Municipality under SFC (SCSP-2020)
Construction of CC drain and Culvert (2) from Ramesh house to Madathala Venkateswarreddy house and S P Saleem Pasha house to Vagu at 14th ward in Kodad Municipality under State Matching Grant
Construction of Culvert and Filling of Gravel along the retaining wall in Yesikonigutta locality in Ward no. 23 Under 1/3 budget / MGF.(This work is reserved for SC Societies/ Individuals only)
Maintenance by diversion of UGD line from Hanuman Nagar Masjid to exiting culvert in Hanuman Nagar of ward no. 129-Suraram, Gajularmaram Circle-26, GHMC. (Item No.01) Completed period 1 month
Strenthening and Laying of BT Road from Hanuman Temple via Netaji statue to Ambedkar Statue at Existing Culvert at Bhavani Nagar in Nacharam ward No.6 of Kara Circle-1,GHMC (Recall)
C/o CC drain and culvert from H.No.7-3-73 B Bhumaiah H to Koppula Swamy H ijn Subramanya nagar in ward no 9 under 14th FC performance grants 2017-18
Laying of HDPE pipeline on the hyderabad road (Left side) between from R&B culvert in the kotirampoor in the balance portion of R&B road widening stretches under market reservior limits
Laying of CC road from H.No: 2-39/1 to H.No:2-32/A/1(near culvert) in Gouthami nagar in chandanagar Ward No.110 of Chandanagar Circle-21, SlpZ ,GHMC,GHMC
Construction of CC Drain with Culvert from Sadanandam House to Rajitha House and CC Drain from Thadelapely Srinu House to Azam Khan House in Ward No.11 in Mancherial Municipality under MGF
Restoration of Flood damaged CC Culvert at 1.Venkateshwara swamy temple in ward No.13, 2.Construction of wall to Tank bund in ward No.07 in Huzurnagar Municipality under SDRF Fund
Periodical Renewals to Payapur to Peddaram road from Km 10/0 to 11/4 in Khammam District Sub work:- Constructuion of 2 row of 1.00m HP culvert at Km 10/6-8
Construction of 300 x 300 size and RCC Culvert Slab at H/o. Bhoomaiah to H/o. Shankar and H/o. Ramulu to H/o. Rama at Goutham Nagar in D.No:45
Laying of Drains & Culvert 1) Deeravath Veerya house to venktreddy plot 2) Beeshmachary house to empty plot 3) Gandamalla Chinnappa house to church road at 11th ward in Nereducharla Municipality 2023-24 .
Providing fencing with chain link both sides from culvert (Pragathi Nagar Khaman) to Dump yard(she Toilet on Pragathi Nagar Main road in Nizampet Municipal Corporation under Municipal General Funds 2022-23
Construction of CC Drain Culvert from Parvatham Rajendra Prasad House to Edga at ward No. 10 in Huzurnagar Municipality under 14th FC Performance Grant 2016-17 (This work is reserved for Societies)
Construction of CC Drain and (1No) Culvert from Shankar Maistry House to Usman House in Ward No.17 under LRS &BPS Funds .( Reserved for SC, ST Voddera labour contract co op Socities)
Construction of CC Drain from Alsafa House No 3-2-20/b to J Rajaiah house No 3-2-5 with Culvert in Ward No 5 (Reserved for SC/ST/Vaddera Societies)
PJP Estimate for repairs and reconstruction of pipe culvert CM & CD structures, repairs to damaged CRS through of 16R minor of D23 distributary canal of PJP LMC in Weepangandla Mandal, Wanaparthy District.
Construction of Culvert and CC Drains (Both Sides) at Govt. School Gollagudem to Panchayat Office and Laying of RCC Pipes Srinagar Colony Road No. 3 in Divn no. 8 Khammam Municipal Corporation
Laying of Storm Water Drain 600mm Dia NP3 class Pipe line from V.N.Reddy Nagar Culvert to 1-9-310/1 in Ward No.03, Cherlapally of Kapra Circle, GHMC(Rs.33.50 Lakhs)
Annual Maintenance of Storm water Drain /Nala (by Machinery) from Kapra Lake downstream to Saket Main road culvert in Ward No.1 Kapra of Kapra Circle-1, GHMC for the year 2024.
Laying of Drains & Culvert 1) Deeravath Veerya house to venktreddy plot 2) Beeshmachary house to empty plot 3) Gandamalla Chinnappa house to church road at 11th ward in Nereducharla Municipality 2023-24 .
Construction of storm water drain from 3 kaman to JLS Nagar culvert h.no.17-243 in Venkateswara nagar at Goutam nagar in ward no.141, Malkajgiri Circle-28, Secunderabad Zone, GHMC. (Recall)
Construction of RCC retaining wall beside Ramalayam Temple to Pipeline Road Culvert at Sapthagiri Colony in Vivekananda Nagar, Ward No.122 of Kukatpally Circle 24, GHMC. (2nd Call) ( Reserved for SC category)
Laying of CC Road from Makka Masjid Back Side to Existing Culvert H/o. Chotu Bhai at Ahmedpura Colony in Div No 56 of Nizamabad Municipal Corporation (Under Pattana Pragathi Untied Fund)
Construction of CC Drain from H.no: 1-1-1596 to culvert, Pakiza convention to 1-1-1515 in ward no: 25 & H.No:1-2-786 in ward no: 11 in Bodhan Municipality
Construction of CC Drain and Culvert at Madaraboina Mallaiah (H) Boda Thanda to Patha Thanda Road at Ward No.09 in Mahabubabad Municipality Under Municipal General Fund for the year 2022-23
Construction of CC Drain and Culvert CC Road 1-1-1027 to 1-1-833 1-1-789 to 1-1-791 in ward no 8 Under 15th FC Grants (2nd Installment)
Providing of Chainlink mesh from Kattamaisamma Culvert to Kapra Nala at KCR Colony in Ward No-01, Kapra of Kapra Circle-1,GHMC.(Reserved for Waddera and Waddera Societies)(Rs.2.50 Lakhs)
Construction of CC Drain and culvert 1-1-1160 to 1-1-1161, 1-1-1088/4 to 1-1-1095/1 in ward no: 9 Under 15th FC Grants (2nd Installment)
Construction of RCC drain and chain link mesh near Glorium school MM Pahadi culvert at MM pahadi in Ward No. 57 Sulemannagar Division in Rajendranagar Circle, GHMC (Rs. 14.30 Lakhs) (Re call)
Construction of CC drains, culvert and Laying of internal roads at hubert nagar andnala approches and bridge in ward no-09 in suryapet muncipality (Reserved for ST SOCIETIES AND INDIVIDUALS) 7th call
Laying of SW Pipe Drain from Baikani Kethamma House to Existing Culvert in Ganga Nagar Colony of Bongulur area in Adibatla Municipality under General Funds 2019-20. (Reserved for SC Socities / Indivisuals)
Removal of water stagnation by laying of cc road from existing culvert to AXIS bank ATM,Canary school road, Prasanth nagar, ward no 108-Miyapur, Division no.21, Chandanagar circle, WZ, GHMC
Laying of CC road and drain & culvert slab From Bobba Kotireddy house to chowrastha, Nemalipuri Krishna reddy house to Lawyer Sridevi house at 26th ward in Kodad Municipality under Pattana Pragathi fund
C/o culvert at 11-25-1210 venkata sai kiranam and filling of debris and gravel at weavers colony beside Hanuman Temple in GWMC Limits (General Funds) in Div. No.23 & 12
Constructions of Side walls to culvert, RCC retaining walls and repairs to damaged SWD duly constructing box drain beside vaddepally enclave in ward no 122 vivekananda nagar of Kukatpally circle-24, GHMC