Loading…
Loading…
81 results • Best match
MMPPNA_22_23_209 Construction of road from (i) Digambar Chuk Road (Near Maxmart Shopping Mall to Bhogdoi River Dam) from Ch. 625.00 m to 1175.00 m, (ii) Kowari Pukhuri Road (Chengeligaon AT Road to Chengeligaon) Ch 300.00 m to 563.00 m
MMPPNA_RIDF_XXXI_25_26_403 Construction of road from (1) Amtereng to Umdihun via Mymtreng Dam, (2) main PWD road to Men Rongphar Gaon, (3)Umru to Rengbonghong Ronghang Gaon, (4)62nd Km of Baithalangso Kampur Road to Tharve Abi via Kharupindha under
Slope Protection work at left bank downstream of Hatidubi Dam, KLHEP
Custom Bid for Services - DRG225K079(OPERATIONAL ASSISTANCE FOR CPP/UTILITY UNITS, DAM 1, 2, 3, DAM-C AND AIR CONDITIONING SYSTEM OF ALL CONTROL ROOMS AT DIGBOI REFINERY) Similar Category Support Services
Reshaping/Regrading and removal of bed materials from ch.11790.00M to ch. 12832.00 of B2M canal, Restoration of B2M canal at ch. 0.00m , ch. 7942, ch. 8302.00m , ch. 10118.00m, ch. 11150m_ch. 15111m Restoration of canal D2B2M from ch.
Re-construction of inlet at B1M canal at ch.4890.00m, Construction of Gated outlet at ch.1685.00m of B1M Canal Construction of RCC slab culvert at ch. 5579.00m of B1M canal Construction of cattle crossing at S1B1M canal from ch. 170.0
Construction of RCC protection wall of Main Canal at ch.17060.00m, Construction of RCC Protection Wall at ch.19340.00m of main canal,Construction of HPCD at ch.3100.00m of B5M cana,l Construction of Aqueduct at ch.1500.00m of B5M canal
C.C lining from ch.7940.00m to 8040.00m of B1M canal , Restoration of B1M canal from ch.8100.00m to 9450.00m , Restoration of canal D2B1M from ch. 3290.00m to ch. 3800.00m , Restoration of breached portion of D2B1M canal at ch.19860m
Repairing and Renovation of the EE office building canal I Canal -I sub Division.,Maintenance and repairing of Sub-Divisional office, Canal-I _Irrigation Rowta
Restoration of Left /Right C.C lining Main Canal. Reshaping and Regrading _ removal of bed materials from syphon at ch. 610.00m to 732.50m Construction of slab culvert at ch. 780.00m of catch water drain
Construction of shutter gate outlet at ch.1250.00m_ ch.1840.00m of B1M canal, Restoration of approach road of B1M canal in between ch.2500m to ch.6560m.00m Restoration of breached portion of B1M canal at various chainages from ch. 4500.0
Annual Operation and Maintenance Contract for Hydraulic Gates and Hydraulic Hoisting System on Concrete Dam of 2x50MW Karbi Langpi Hydro Electric Project including Operation and Maintenance of Dewatering Pump installed at Foundation Gallery of Dam.
Supply, Installation, Testing and Commissioning of 02 Nos. 80HP Submersible Pump, 3000LPM along with Control Panel, LT Distribution Board, Cables, etc. for dewatering of waste water from dam gallery sump pit of Hatidubi Dam of KLHEP
Civil Works comprising of concrete piano weir structure, Power Intake, HRT, Surge Shaft, Pressure Shaft, Surface Power House, Tail Pool, roads, bridges and building
Const of Cross regulator head regulator coffer dam diversion canal us ds guide bund approach road and main canal.
Fiber reinforced plastic H flume, FRP Replogle Flume ot Trapezoidal weirs, FRP Vnotches, FRP parshall Flume, FPR Cut throat Flume, Mini disk infiltrometer, Soil Moisture and Temperature sensor, Centrifugal pump test rig, Submersible pump test rig, Auger, time domain reflectometer, hot air oven, suspended sediment sampler, sediment sampler Ekman type, water level logger sensor, digital soil thermometer, Plant canopy analyzer
Outsourcing of services for various running and maintenance activities and Hydrological data collection work against Survey Investigation of Killing Dam Project
Outsourcing of services for running and maintenance of Hydrological data collection work and various activities against Survey Investigation of Kulsi Dam Project
Construction of Bituminous road and masonry road side drain from power channel zero point to power house stage I and the linking road to weir stage I passing through crusher plant MSHEP APGCL
Conducting Bathymetry Survey and LiDAR based Topography Survey for Computation of Area Capacity Curve of Hatidubi Dam, Karbi Langpi Hydro Electric Project, West Karbi Anglong, Assam.
Construction of stone rubble masonry retaining wall and drain for second bench at newly excavated area on left bank of upstream side at Dam site of KLHEP
Construction of stone rubble masonry retaining wall and drain for 1st bench at newly excavated area on left bank of upstream side at Dam site of KLHEP.
FABRICATION, supply AND INSTALLATION OF SOLAR POWERED CART MMOUNTED MULTIFUNCTIONALI/S (INNOVATIVE SCHEME) AT DIMORU FIS (CHECK DAM) UNDER HOJAI LUMDING BINNAKANDI DIVISION (IRRIGATION), HOJAI FOR THE YEAR 2025-26
Repairing of D/S of the Weir with Plum concreting over boulder pitching, D/S protection works with boulder sausage, E/W in excavation in lead canal an Main canal, Strengthening and widening of R/S and L/S Afflux Bund, Fabricating and Installation of
1.DLHS road to Tamulbari 2.Dayaram ME School Approach road 3. Disagisim sibnagar road to langkhailu village 4.Upper Chapong to Irrrigation Dam 5.Majgaon to Dimasa Gaon to Cremation Ground 6. Huglakata to Sunpura.
DPRD/BTC/(SOPD)Udl-14/2025/08
Construction of Road from M/E along Boali from Katanalah dam side to PWD Road near Kachudaram from Ch. 0 m to Ch. 4.90 Km, (L-4.90 Km) Dholai LAC under RIDF - XXVII of NABARD for the year 2021-22
JORHAT/MMPNA/R_R/02 Repair and Rehabilitation of the 1) Bridge located on Christian Bosti Road (Mission compound to Bridge end) at Ch. 0.163Km, 2) Bridge on Digambarchuk Road (Near Maxmart shopping mall to Bhogdoi river dam) at Ch.0.045 Km and 3) Bri
EDTA Gel, Glutaraldehyde 2% aqueous solution with activator bott of 5 ltr, Hydrogen peroxide 500 ml bottle, Disposable RVG sensor sleeves pkt of 1000, Plaster green stone pkt of 1 kg, Articulating paper, Calcium hydroxide with iodoform Root canal ... Rubber dam sheets ... Rubber dam Kit, ...
Hand gloves, size 6 and half pair of, Hand gloves, size 7 pair of, Nitrile gloves small size, Nitrile gloves medium size, Hand sanitizer bott of 500ml, Betadine gargle W v bott of 100ml, Glutraldehyde solution tin of 5 ltr, Kenakort ointment, Dental ... Optra dam Pkt ...
The Long Game by Vijay Gokhale, Arthashastra Kautilya, On China by Henry Kissinger, Full Spectrum by Arjun Subramaniam, On War by Carl Von Clausewitz, The Idea of Pakistan by Stephen Cohen, Makers of Modern India by Ramchandra Guha, Good to Great by ... William Weir , ...