Loading…
Loading…
19 live7 closing this weekmost from Engineer-in-Chief - Water Resources Department and Directorate Urban Administration and Development
19 results • Best match
Supply, Installation, Commissioning and Testing of Ultrasonic Type Water Level Transmitter for gallery sump, Radar Type Water Level Transmitter for Dam Level, Ultrasonic Type Water flow Transmitter (Open Channel for gallery drain), Mechanical Dam Lev
Construction of ATPS Sone Barrage Chachai on Sone River
Construction Of Talab Waste Weir at Ward Number 02 Lateri.
Seepage control work in Dam Galleries and downstream surface of Power Dam at Omkareshwar Power Station
Repairing, Refixing and Taking out of MS Shutter from Barrage gate at Industrial Area Pilukhedi, District Rajgarh (M.P.)
Upgradation of LT distribution Board for Dam Control Room
Supply and Installation of new Lift for access to Infiltration Gallery at Mohanpura Dam.
Work contract for repairing of Old Beacon weir 300 HP Spare CW pumps 02 nos. for 3x105 MW, THPS I, MPPGCL, Sirmour.
Deployment of skilled manpower for dam gate operation related work, recording meteorological and other data and associated works, including sweeping and cleaning of toilets at Satpura dam for year 2026-27 at STPS,Sarni
PROVIDING AND FIXING OF PAVING BLOCK AND RAILING NEAR KALIYASOT DAM IN FRONT OF MANDIR W30 Z08
Operation of control room of Beehar Barrage including watching and recording of water level of reservoir and convey it to all officials by deploying 04 nos semi skilled labour for shift duty.
Strengthening of Ada Pahad to Basi Pipri, Ada Pahad to Choral Dam Road Length 05.39Km. i/c Electric Pole Shifting Work.
Construction of 2 nos. high-level bridge on Pohri-Piparghar road and Pohri - Mandi road in the submergence area of Sarkula Dam
Epoxy Painting on 24 nos. radial gates with trunnion/motor/hydraulic pump/hydraulic tank/hoist bridge/foot bridge/control panels of 25 nos railing and its auxiliary fitting of Retam Barrage Project Malhargarh Mandsaur under DRIP-II
Repair and Maintenance of Gallery Lighting (Inspection and Dewatering Gallery ) of the Lower Goi Project Dam Site Dist. Barwani including material, labour, charges, transportation and testing etc. complete work.
Custom Bid for Services - Up-gradation of Fire Protection System for Various Locations of Dam at Indira Sagar Power Station Similar Category Operation And Maintenance Of Fire Alarm System Operation And Maintenance Of Fire Fighting System
Stablishing a shade on ganrty crane roof at Lower Goi Project (Shaheed Bhima Nalyak Project) including material, labour, charges, transportation and testing etc. complete work.
De-silting of Tailing Dam at DMP Majhgawan (MP) FY 2026 2027
Water Supply Branch, including motor (SUBMERSIBLE, MONOBLOCK, OPENWELL PUMPS) rewinding, valve rods, shank nuts, air valves, repair of a ruptured 300mm DI pipeline, stop dam shutters, etc as per list at nagar palika parishad Alirajpur.